0% found this document useful (0 votes)
3 views

SAP T- Codes

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

SAP T- Codes

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

SAP PP (Production Planning) (T-Codes) :

Master Data

• Material Master:

• MM01: Create Material


• MM02: Change Material
• MM03: Display Material
• Bill of Materials (BOM):
• CS01: Create BOM
• CS02: Change BOM
• CS03: Display BOM
• Work Center:
• CR01: Create Work Center
• CR02: Change Work Center
• CR03: Display Work Center
• Routings:
• CA01: Create Routing
• CA02: Change Routing
• CA03: Display Routing
Planning

• Material Requirements Planning (MRP):

• MD01: MRP Run (Total Planning)


• MD02: MRP Run (Single Item Multi-Level)
• MD03: MRP Run (Single Item Single-Level)
• MD04: Stock/Requirements List
• MD05: MRP List
• Capacity Planning:
• CM01: Capacity Load
• CM21: Capacity Leveling

Production Orders

• CO01: Create Production Order


• CO02: Change Production Order
• CO03: Display Production Order
• CO08: Create Production Order (With Material)
• CO15: Confirm Production Order
• CO16N: Reconfirm Production Order
• CO11N: Single Confirmation
Production Orders

• CO01: Create Production Order


• CO02: Change Production Order
• CO03: Display Production Order
• CO08: Create Production Order (With Material)
• CO15: Confirm Production Order
• CO16N: Reconfirm Production Order
• CO11N: Single Confirmation
Shop Floor Control

• MF50: Planning Table


• MF60: Pull List
• MF70: Repetitive Manufacturing Backflush

Integration

• Inventory Management:
• MB31: Goods Receipt for Production Order
• MB1A: Goods Issue to Production Order
• MB1B: Transfer Posting
• Costing and Settlement:
• KO88: Order Settlement
• KKF6N: Production Order Variance

Reporting and Analysis

• COOIS: Production Order Information System


• COHV: Mass Processing of Orders
• CM05: Capacity Planning: Work Center View
Most used SUPPLY CHAIN & PROCUREMENT terms :

RFQ: Request for Quotation


RFP: Request for Proposal
RFI: Request for Information
PO: Purchase Order
PR: Purchase Requisition
SLA: Service Level Agreement
TCO: Total Cost of Ownership
COGS: Cost of Goods Sold
MOQ: Minimum Order Quantity
KPI: Key Performance Indicator
FOB: Free on Board
PPV: Purchase Price Variance
OTD: On Time Delivery
SRM: Supplier Relationship Management
BOM: Bill of Materials
MRO: Maintenance, Repair, and Operations
ROQ: Reorder Quantity