0% found this document useful (0 votes)
5 views1 page

1-Kaizen Mar-2024 Utility & Maintenance

Uploaded by

nabeel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views1 page

1-Kaizen Mar-2024 Utility & Maintenance

Uploaded by

nabeel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MASTER ENTERPRISES (PVT) LTD.

KAIZEN / 5S CREATIVE SUGGESTION FORM


NAME: Zubair Wakeel DATE: 5th March, 2024 Kaizen# March-01
DESIGNATION: Helper CARD NO: 1284
DEPARTMENT: Utility & Maintenace SECTION: Maintenace

CREATIVE SUGGESTION
SUBJECT: Dehydration Process of Transformer for moisture removal & general safety measures for transformer.
Existing Condition: Improvement After Kaizen:

After this Kaizen principles, the plant may have Effected Area
Before Kaizen implementation, the issue of faulty pressure
experienced significant improvements in the reliability and Solar Invertor Room
gauges adversely impacted production due to inaccurate
accuracy of pressure gauges, resulting in fewer
readings, necessitating a change to improve reliability and QUALITY COST
disruptions to production and higher overall quality
efficiency. Yes
standards. IMPROVEMENT SAVING
BEFORE PICTURE / DRAWIG AFTER PICTURE / DRAWING SHOWING KAIZEN
IMPROVEMENT TIME
Yes Yes
PRODUCTIVITY SAVING

SUGGESTION
M. Nabeel Siddiqui.
INITIATE BY

CHECKED BY
MEMBER

ADVANTAGES AFTER KAIZEN / SUGGESTION CHECKED BY


Zubair
Details COODINATOR

"At a result of this kaizen improvement, "These replacement help us to attain reliability of system and reduce
APPROVED BY
production down time. Mr. Kashif Sb.
ADVISOR

You might also like