Plan-for-estimates
Plan-for-estimates
PROVINCE OF GUIMARAS
3 TABLE OF CONTENTS : D P W H
A-1 MUNICIPALITY OF BUENAVISTA
OFFICE OF THE BUILDING OFFICIALS
SHEET NO. SHEET CONTENTS SHEET NO. SHEET CONTENTS
FOUNDATION PLAN
DESIGN ANALYSIS ARCHITECTURAL
JJL ' 16 S-1 C1/F1 DETAIL E-2
C2/F2 DETAIL SCHEDULE OF LOADS
6 13 C3/F2 DETAIL 13 13 SINGLE LINE DIAGRAM
WF DETAIL AND VS DETAIL
TO SI
TIO K
ALALA
N►
◄
. RO
GY
BR
AD THIS SITE PLUMBING / SANITARY
WS
(N
AT
IO
NA
LR
OA
D PIÑA ELEM. ELECTRICAL
)
SCH. CAMPUS
TO
SA
2 VICINITY MAP N
LO
RE
DRAWN NOT TO SCALE NZ
A-1 O
►
MECHANICAL
CERTIFIED BY : PROJECT TITLE : OWNER : APPROVED BY : REVISIONS : SHEET CONTENTS : SHEET NO. :
AS SHOWN :
D P W H
MUNICIPALITY OF BUENAVISTA
OFFICE OF THE BUILDING OFFICIALS
BUILDING OFFICIAL
11.50 11.50
B
B
ROOF LINE ROOF LINE
0.80
w-2 w-2 w-4 w-4 w-2
A A A A
1.20
1.20
d-6
STO. T&B
d-5
A' DINING A' A' VOID T&B BEDROOM A'
3.00
3.00
3.00
MASTER'S w-2
3.70
d-4
BEDROOM SPACE 2
A
1.80
w-1
ROOF OVER
2.50
d-3 KITCHEN
d-5 d-3
B A B B A GROUND FLOOR A B
1.10
1.20
1.40
7.50
7.50
7.50
7.50
DOWN
B' CARPORT FOYER/ w-1
B' B' 15 14 13 12
11
w-1 B'
B" B" B" B"
3.00
3.00
3.00
3.00
w-2 LIVING FORMAL w-2 d-3 10
2.30
MULTI- d-2 LANAI BEDROOM FAMILY 9
1.90
1.80
1.60
8
UP LIVING HALL 7
PURPOSE 1 6
d-1 1 d-4
C w-3
2
w-1
C C w-2 w-3 w-3
C
1.50
1.50
1.50
1.50
4 3
PORCH
2.50
BALCONY
D D D D
0.80
w-3
B B
1.90 1.10 1.10 1.90 2.00 2.90 1.10 0.80 0.80
11.50 11.50
1 1' 2 3 4 5 6 7 1 1' 2 3 4 5 6 7
CERTIFIED BY : PROJECT TITLE : OWNER : APPROVED BY : REVISIONS : SHEET CONTENTS : SHEET NO. :
AS SHOWN :
D P W H
▼APEX OF TRUSS MUNICIPALITY OF BUENAVISTA
OFFICE OF THE BUILDING OFFICIALS
▼TOP OF ROOF BEAM-2b SEE TRUSS DETAIL
SEE TRUSS DETAIL ▼TOP OF ROOF BEAM-2a ▼FINISH CEILING LINE
RB RB RB RB RB
RB ▲FINISH CEILING LINE ▲FINISH CEILING LINE
BUILDING OFFICIAL
3.00
2.50
2.30
BD.RM.
d-5 d-3 FAMILY BD.RM.
VARIFY
FAMILY SEE TRUSS
1 HALL 2
HALL 15 ▼FINISH GROUND FLOOR LINE ▼TOP OF FLOOR BEAM/ROOF BEAM-1b DETAIL 15
0.50
14 14
13 SEE TRUSS DETAIL ▼TOP OF ROOF BEAM-1a ▼FINISH CEILING LINE 13
FB-1 FB-1
12
FB-1 RB RB FB-1 11
12
FB-1 FB-1
10
RB 9
3.00
8
w-2 7
2.50
6
d-5 5 d-3
d-1 ▼TOP OF STAIR LANDING 4
3
0.80
2
CARPORT FOYER/LIVING DINING KITCHEN 1 LIVING DINING
▼FINISH GROUND FLOOR LINE ON
0.30
▲NATURAL GROUND LINE FILL ARCHITECTURAL
EARTH EARTH EARTH EARTH EARTH EARTH
WF WF WF WF WF WF WF EARTH
C1F1 C1F1 C1F1 C3F2 C3F2 C3F2
C1F1 C1F1 C1F1 C1F1
▼APEX OF TRUSS
▼TOP OF ROOF BEAM-2b
▼TOP OF ROOF BEAM-2a
w-4
2.99
w-2 VOID w-2
2.50
VOID
SPACE
VERIFY
SPACE
▼FINISH GROUND FLOOR LINE
0.50
▼TOP OF ROOF BEAM-1a
w-4
3.00
w-2 w-2 w-1 w-2
2.50
d-6
0.30
▲NATURAL GROUND LINE
▼APEX OF TRUSS
▼TOP OF ROOF BEAM-2b
▼TOP OF ROOF BEAM-2a
3.00
w-3
w-2 w-3 w-1 w-2
d-4 2.50
VERIFY
▼FINISH GROUND FLOOR LINE
0.50
CERTIFIED BY : PROJECT TITLE : OWNER : APPROVED BY : REVISIONS : SHEET CONTENTS : SHEET NO. :
AS SHOWN :
D P W H
MUNICIPALITY OF BUENAVISTA
OFFICE OF THE BUILDING OFFICIALS
BUILDING OFFICIAL
11.50 11.50
1.20 1.20
CONCRETE CANOPY WITH 1/2" U-CUT 1" x 1" S4S WOOD FRAMING @ 1" GAP
WITH WIRE MESH CEILING VENT 1" x 3" WOOD CORNICE
0.80
A A A A
0.65
0.65
1.20
1.20
3.00
3.00
3.70
1.80
ROOF OVER
2.50
B B B GROUND FLOOR B
1.10
1.20
1.40
7.50
7.50
7.50
7.50
B' B'
B" B"
3.00
3.00
3.00
2.30
1.90
1.80
1.60
C C C C
1.50
1.50
1.50
1.50
2.50
D D D D
0.80
1" x 2" METAL FURRING CEILING JOIST
@ 0.60m.o.c., BOTHWAYS AND
HANGER @ 1.00m.o.c.
B
1.10 1.10 1.90 2.00 2.90 1.10 0.80 0.80
11.50
1 1' 2 3 4 5 6 7 1 1' 2 3 4 5 6 7
1 GROUND FLOOR REFLECTED CEILING PLAN 2 SECOND FLOOR REFLECTED CEILING PLAN
A-4 SCALE : 1 : 100 M. A-4 SCALE : 1 : 100 M.
CERTIFIED BY : PROJECT TITLE : OWNER : APPROVED BY : REVISIONS : SHEET CONTENTS : SHEET NO. :
AS SHOWN :
BUILDING OFFICIAL
S S F S S A w-4
0.60
0.60
0.60
A
w-1 w-2 w-3
1.20
1.20
1.20
0.60
A ARCHITECTURAL
1.50
SLIDING TYPE WINDOW FIXED/SLIDING TYPE WINDOW AWNING TYPE WINDOW AWNING TYPE WINDOW
2-UNITS, 4 SETS 3-UNITS, 7 SETS 2-UNITS, 4 SETS 1-UNIT, 2 SETS
0.90
0.90
0.90
LOCATION : FORMAL LIVING, LOCATION : BEDROOMS, LOCATION : PORCH,BALCONY, LOCATION : TOILETS AND
KITCHEN, M. BEDROOM, STAIR DINING, STAIR STAIRS BATHS
▼FINISH GROUND FLOOR LINE
1.40
2.10
2.10
2.10
2.10
2.10
▲FINISH GROUND FLOOR LINE
PANEL TYPE DOOR SLIDING TYPE DOOR PANEL TYPE DOOR PANEL TYPE DOOR FLUSH TYPE DOOR PANEL TYPE DOOR
1-UNIT, 1 SET 2-UNITS, 1 SET 3-UNITS, 1 SET 2-UNITS, 1 SET 2-UNITS, 1 SET 1-UNIT, 1 SET
LOCATION : MAIN ENTRY LOCATION : FORMAL LIVING, LOCATION : BEDROOMS LOCATION : BACK DOOR, LOCATION : TOILET LOCATION : STORAGE ROOM
LANAI BALCONY AND BATHS
CERTIFIED BY : PROJECT TITLE : OWNER : APPROVED BY : REVISIONS : SHEET CONTENTS : SHEET NO. :
AS SHOWN :
0.30
EARTH/ON FILL
0.60
▼NATURAL GROUND LINE BUILDING OFFICIAL
0.80
0.20
EARTH
0.35
0.20
▼TOP/FINSH GROUND FLOOR LINE 4-12mmØ RSB MAIN
2-10mmØ RSB CONTINOUOS
0.10
VERTICAL BARS
WITH 9mmØ RSB @ TRANSVERSE
ON FILL ON FILL SECTION @ 0.30m.o.c.
0.10m. THICK SECTION
GRAVEL BEDDING 0.40 0.10m. THICK
SECTION 2-12mmØ RSB MAIN VERTICAL BARS GRAVEL BEDDING 0.80
0.25 WITH 9mmØ LATERAL TIES @ 0.25m.o.c. 5-12mmØ RSB MATT BARS STRUCTURAL
0.15 @ 0.20m.o.c., BOTHWAYS
2-10mmØ RSB CONTINOUOS
0.10
0.80
0.20
0.25m.o.c.
1 1' 2 3 4 5 6 7
9mmØ RSB LATERAL TIES
11.50 PLAN @ 4-0.05m,4-0.10m REST @
0.25m.o.c.
3.00 3.00 3.00 2.50
WF DETAIL PLAN
5
1.20 S-1 SCALE : 1 : 20 M. 4 C3F2 DETAIL
S-1 SCALE : 1 : 20 M.
0.10m. THICK CONCRETE SLAB WITH ▼NATURAL GROUND LINE
9mmØ RSB MATT BARS @
EARTH EARTH
0.60m. x 0.60m.o.c., BOTHWAYS
0.75
C3F2 C3F2
1.00
C1F1 WF C1F1 WF C1F1 WF WF
A VS A ▼NATURAL GROUND LINE
1.20
1.20
WF
WF WF
WF
EARTH EARTH
A' A'
3.00
0.25
WF
WF
VS
0.60
VS VS
3.70
WF
1.80
0.80
WF
2.50
C1F1 C1F1 WF C3F2
B C1F1 WF B SECTION 6-16mmØ RSB MAIN
VERTICAL BARS
0.20
1.40
7.50
7.50
B' C3F2
VS
B' 0.10m. THICK
4-12mmØ RSB MAIN
C3F2 GRAVEL BEDDING
B" B"
3.00
WF
WF
WF
VERTICAL BARS
2.30
1.20
WF
SECTION
1.60
C3F2 STB-1
C1F1 WF C1F1 WF C1F1 WF 0.30 0.10m. THICK
C C
WF
VS C3F2
1.50
1.50
0.30
1.20
0.30
0.80
3.00 3.00 3.00 2.50
11.50
1 1' 2 3 4 5 6 7
PLAN PLAN
1 GROUND FLOOR FOUNDATION PLAN 2 C1F1 DETAIL 3 C2F2 DETAIL
S-1 SCALE : 1 : 100 M. S-1 SCALE : 1 : 20 M. S-1 SCALE : 1 : 20 M.
CERTIFIED BY : PROJECT TITLE : OWNER : APPROVED BY : REVISIONS : SHEET CONTENTS : SHEET NO. :
AS SHOWN :
BUILDING OFFICIAL
FB-2
FB-3 FB-1 L3/5 L3/5 FB-1 L4/5 L4/5 FB-1
STRUCTURAL
FOUNDATION LEVEL
TO SECOND FLOOR
11.50
0.30
0.30
0.20
0.10
3.00 3.00 3.00 2.50 0.80
LEVEL
2" x 6" C - CHANNEL ROOF GIRT MAIN BARS : 6-16mmØ MAIN BARS : 4-12mmØ MAIN BARS : 4-12mmØ MAIN BARS : 2-12mmØ
1.20
NAILED ON CONCRETE WALL TIES: 10mmØ TIES: 10mmØ TIES: 10mmØ TIES: 10mmØ
4-0.05, 4-0.10 4-0.05, 4-0.10 4-0.05, 4-0.10 4-0.05, 4-0.10
REST @ 0.25m.o.c. REST @ 0.25m.o.c. REST @ 0.25m.o.c. REST @ 0.30m.o.c.
2" x 6" C - CHANNEL RAFTER S C H E D U L E OF COLUMN FOOTING
WITH 2" X 3" C - CHANNEL 0.30
PURLINS @ 0.60m.o.c. BEAM DIMENSIONS ( in METER ) STEEL REINFORCEMENT
TO ROOF BEAM
0.30
(L) (W) (D) (t) BAR-X BAR-Y
0.80
FB-1 FB-1
LEVEL
RB RB
A A MAIN BARS : 4-16mmØ
C1F1 1.00 1.00 1.00 0.25 7-16mm Ø 7-16mm Ø SQUARE FOOTING
1.85
TIES: 10mmØ C2F2 0.80 0.80 0.80 0.20 5-12mm Ø 5-12mm Ø SQUARE FOOTING
FB-2
FB-1
FB-1
FB-1
3.00
4-0.05, 4-0.10
RB
3.70
RB
REST @ 0.25m.o.c. C3F2 0.80 0.80 0.80 0.20 5-12mm Ø 5-12mm Ø SQUARE FOOTING
1.85
FB-1
B FB-1 STAIR RB
B
1.10
FB-2
7.50
7.50
WELL
0.80
FB-1
FB-1
FB-1
S C H E D U L E OF B E A M S
3.00
2.30
RB
FB-2
1.90
FB-1 FB-1 RB
BEAM DIMENSIONS
C C STEEL REINFORCEMENT STIRRUPS
0.80
FB-2
RB
1.50
1.50
1.50
( mm Ø )
FB-3
0.80
1.00
CB
CB
S-2 FB-1 0.20 0.40 16mm Ø 1 1 2 3 1 1 @4-0.05, 4-0.10 REST @ 0.20 m.o.c.( ADD 2-12mmØ SIDE BARS )
SECOND FLOOR
FB-3
FB-2 0.20 0.30 16mm Ø 1 1 2 3 1 1 @4-0.05, 4-0.10 REST @ 0.20 m.o.c.( ADD 2-12mmØ SIDE BARS )
LEVEL
1.00 1.90 FB-3 0.15 0.40 16mm Ø 1 1 2 2 1 1 @4-0.05, 4-0.10 REST @ 0.20 m.o.c.
2.00 2.90 1.10 0.80 0.80 0.75 CB 0.20 0.30 16mm Ø 1 1 3 2 1 1 @4-0.05, 4-0.10 REST @ 0.20 m.o.c.
3.00 3.00 3.00 2.50
1 SECOND FLOOR FRAMING/GROUND FLOOR ROOF FRAMING PLAN STB-2 0.15 0.25 16mm Ø 1 1 3 2 1 1 @4-0.05, 4-0.10 REST @ 0.20 m.o.c.
S-2 SCALE : 1 : 100 M.
CERTIFIED BY : PROJECT TITLE : OWNER : APPROVED BY : REVISIONS : SHEET CONTENTS : SHEET NO. :
AS SHOWN :
0.10
FB-2
FB-3 10mmØ CONT. BARS @ 0.30m.o.c., BOTHWAYS FB-1 10mmØ CONT. BARS @ 0.30m.o.c., BOTHWAYS FB-1 FB-1
1 2 3 4 5 6 7
S C H E D U L E OF SLABS
11.50 REBARS SPACING ALONG SHORT DIRECTION ( in METER ) REBARS SPACING ALONG LONG DIRECTION ( in METER )
FLOOR SLAB THICKNESS REBARS
LEFT SUPPORT MID-SPAN RIGHT SUPPORT LEFT SUPPORT MID-SPAN RIGHT SUPPORT REMARKS
3.00 3.00 3.00 2.50 LEVEL MARK ( in METER ) mm Ø
TOP BOTTOM TOP BOTTOM TOP BOTTOM TOP BOTTOM TOP BOTTOM TOP BOTTOM
SECOND
1.20 S-1 0.10 10mm Ø 0.30 0.30 0.15 0.15 0.30 0.30 0.30 0.30 0.15 0.15 0.30 0.30 TWO-WAY SLAB
LEVEL
FLOOR
0.80 6.00 0.35 S-2 0.10 10mm Ø 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.15 0.30 0.30 ONE-WAY SLAB
2" x 6" C - CHANNEL RAFTER
WITH 2" X 3" C - CHANNEL
PURLINS @ 0.60m.o.c.
0.80
0.80
RB RB
A A
DS
RAFTER
1.50
1.50
0.4mm G.I. ROOFING ( PAINTED )
RAFTER
3.00
3.00
RB
RB
1.50
WITH 2" X 3" C - CHANNEL
RAFTER
ROOF OVER PURLINS @ 0.60m.o.c. 12mmØ RSB SOG ROD ( STAGGERED )
6.00
B B
DS
7.50
1.50
1.50
1" x 1" ∠BAR FASCIA FRAMING
RAFTER
3.00
3.00
RB
RB
1.50
1/2" THICKFIBER CEMENT
RB RAFTER RB
C C
DS
FASCIA BOARD
0.80
0.80
1.50
1.50
0.30
D BALCONY D RB
0.80
0.50
12mmØ RSB FULLY WELD
0.20
1" x 2" METAL FURRING CEILING JOIST
0.80 1.00 1.90 0.35 AND HANGER @ 0.60m.o.c., BOTHWAYS
0.70 0.10
2.00 2.90 1.10 0.80 0.80 1/4" THICK FIBER CEMENT
0.80 CEILING BOARD
3.00 3.00 3.00 2.50
11.50
1 2 3 4 5 6 7
3 TYPICAL TRUSS DETAIL
S-3 SCALE : 1 : 100 M.
CERTIFIED BY : PROJECT TITLE : OWNER : APPROVED BY : REVISIONS : SHEET CONTENTS : SHEET NO. :
AS SHOWN :
D P W H
MUNICIPALITY OF BUENAVISTA
OFFICE OF THE BUILDING OFFICIALS
BUILDING OFFICIAL
1.60
0.50 1.10
2 3 4 STRUCTURAL
0.1
2"Ø STAINLESS
5
STEEL HANDRAIL
1.10
15 14 13 12 ▼TOP/FINISH SECOND FLOOR LINE 15 ▼TOP/FINISH SECOND FLOOR LINE
14
0.25
0.60
13
FB-1 12 FB-1
▼TOP OF STAIR LANDING ( STEP 12 ) 10mm Ø @
0.10
11
0.30m.o.c. 11
0.20
10 10
10mm Ø
9 10mm Ø 9 @ 0.30m.o.c.
STB-2 10mm Ø
NOSING BAR 8
1.60
8 @ 0.30m.o.c.
1.90
3.00
7
4.50
7
0.20
10mm Ø MATT BARS 6
6 @ 0.30m.o.c.,BW
5 0.25
1
0.50
5 ▼TOP OF STAIR LANDING ( STEP 4 ) 4
16mm Ø
0.20
2 3
▼TOP OF STAIR LANDING ( STEP 3 ) ON FILL @ 0.30m.o.c.
C
0.10
ON FILL STB-22
0.60
1
▼TOP/FINISH GROUND FLOOR LINE ▼TOP/FINISH GROUND FLOOR LINE
0.30
1.50
4 3
▼NATURAL GROUND LINE
EARTH EARTH STB-1 EARTH EARTH
WF WF
D
C3F2
PLAN
CERTIFIED BY : PROJECT TITLE : OWNER : APPROVED BY : REVISIONS : SHEET CONTENTS : SHEET NO. :
AS SHOWN :
D P W H
3 ELECTRICAL SYMBOLS: 4 ELECTRICAL SPECIFICATIONS: MUNICIPALITY OF BUENAVISTA
E-1 E-1 OFFICE OF THE BUILDING OFFICIALS
POWER LINE ALL ELECTRICAL WORKS HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY LICENSED
ELECTRICAL ENGINEER OR MASTER ELECTRICIAN.
LIGHTING LINE
1 1' 2 3 4 5 6 7 1 1' 2 3 4 5 6 7
C5 C8
i
A n
m A A St A
C3
Sm Sj j C7
A' C4 A' A'
l Sl k t u v
Shgi h Su Sv
ROOF OVER
B Sefk
e
C2 B B Sos
C6 GROUND FLOOR B
B' c B' s
B" d Sao f
g
B" r Sqr
o
Scn PB C9 q
Sbd Sp
C C C C
p
b a C1
D D D D
1 1' 2 3 4 5 6 7 1 1' 2 3 4 5 6 7
CERTIFIED BY : PROJECT TITLE : OWNER : APPROVED BY : REVISIONS : SHEET CONTENTS : SHEET NO. :
AS SHOWN :
C - 1 : LIGHTING OUTLET USE : 2 - 3.5 mm² THHN COPPER WIRE C - 7 : DUPLEX CONVENIENCE OUTLET USE : 2 - 3.5 mm² THHN COPPER WIRE
14(18)VA 20 AT, 2P, CB, 2 - WIRE, 60 Hz. 8 x 2(180)VA 30 AT, 2P, CB, 2-WIRE, 60Hz. 100 AT, 2P, CB, 220 V, 60 Hz. BUILDING OFFICIAL
I= = 1.15A I= = 13.10A
220 V IN 1/2" Ø PVC CONDUIT PIPE 220V IN 1/2" Ø PVC CONDUIT PIPE IN 2" Ø PVC CONDUIT PIPE, ORANGE
20 AT 30 AT
C - 2 : DUPLEX CONVENIENCE OUTLET USE : 2 - 3.5 mm² THHN COPPER WIRE C - 8 : SPECIAL PRPOSED OUTLET USE : 2 - 5.5 mm² THHN COPPER WIRE
11x 2(180)VA 30 AT, 2P, CB, 2 - WIRE, 60 Hz. 1 x 1760VA 30 AT, 2P, CB, 2-WIRE, 60Hz.
I=
220 V
= 18.00A
IN 1/2" Ø PVC CONDUIT PIPE I=
220V
= 8.00A
IN 1/2" Ø PVC CONDUIT PIPE L.O. C1 C2 C.O.
C - 9 : SPECIAL PURPOSED OUTLET USE : 2 - 5.5 mm² THHN COPPER WIRE 30 AT 30 AT
C - 3 : SPECIAL PURPOSED OUTLET USE : 2 - 5.5 mm² THHN COPPER WIRE 1 x 1760VA 30 AT, 2P, CB, 2-WIRE, 60Hz.
1 x 1760VA 30 AT, 2P, CB, 2-WIRE, 60Hz. I= = 8.00A
220V IN 1/2" Ø PVC CONDUIT PIPE
I=
220V
= 8.00A
IN 1/2" Ø PVC CONDUIT PIPE S.P.O. C3 C4 S.P.O. ELECTRICAL
C -10 : SPARE OUTLET USE : 2 - 5.5 mm² THHN COPPER WIRE
C - 4 : SPECIAL PURPOSED OUTLET USE : 2 - 5.5 mm² THHN COPPER WIRE 1 x 1760VA 30 AT, 2P, CB, 2-WIRE, 60Hz. 30 AT 20 AT
I= = 8.00A
220V IN 1/2" Ø PVC CONDIT PIPE
I= 1 x 1760VA = 8.00A 30AT, 2P, CB, 2 - WIRE, 60 Hz.
220V IN 1/2" Ø PVC CONDUIT PIPE
S.P.O. C5 C6 L.O.
IT = 1.15A+18.00A+0.65+13.10+5(8.00A)=72.90 A USE : 2 - 14.0 mm² THHN COPPER WIRE
C - 5 : SPECIAL PURPOSED OUTLET USE : 2 - 5.5 mm² THHN COPPER WIRE IF = 72.90A ( 1.25 ) = 91.13A 100 AT, 2P, CB, 2 - WIRE, 60 Hz. 30 AT 30 AT
1 x 1760VA 30 AT, 2P, CB, 2 - WIRE, 60 Hz. IN 2" Ø PVC CONDUIT PIPE
I= = 8.00A
220 V IN 1/2" Ø PVC CONDUIT PIPE
C.O. C7 C8 S.P.O.
C - 6 : LIGHTING OUTLET USE : 2 - 3.5 mm² THHN COPPER WIRE 30 AT 30 AT
8 x 18VA 20 AT, 2P, CB, 2-WIRE, 60Hz.
I= = 0.65A
220V IN 1/2" Ø PVC CONDUIT PIPE
S.P.O. C9 C10 S.O.
C1 LIGHTING OUTLET 14 3 3 2 1 220V 252 1.15 A 20 AT 2 - 3.5mm² THHN COPPER WIRE 1/2" Ø PVC PIPE,ORANGE
C2 DUPLEX CONVENIENCE OUTLET 11 220V 3960 18.00 A 30 AT 2 - 3.5mm² THHN COPPER WIRE 1/2" Ø PVC PIPE,ORANGE
C3 SPECIAL PURPOSED OUTLET 1 220V 1760 8.00 A 30 AT 2 - 5.5mm² THHN COPPER WIRE 1/2" Ø PVC PIPE,ORANGE
C4 SPECIAL PURPOSED OUTLET 1 220V 1760 8.00 A 30 AT 2 - 5.5mm² THHN COPPER WIRE 1/2" Ø PVC PIPE,ORANGE
C5 SPECIAL PURPOSED OUTLET 1 220V 1760 8.00 A 30 AT 2 - 5.5mm² THHN COPPER WIRE 1/2" Ø PVC PIPE,ORANGE
C6 LIGHTING OUTLET 8 4 2 1 220V 144 0.65A 20 AT 2 - 3.5mm² THHN COPPER WIRE 1/2" Ø PVC PIPE,ORANGE
C7 DUPLEX CONVENIENCE OUTLET 9 220V 2880 13.10 A 30 AT 2 - 3.5mm² THHN COPPER WIRE 1/2" Ø PVC PIPE,ORANGE
C8 SPECIAL PURPOSED OUTLET 1 220V 1760 8.00 A 30 AT 2 - 5.5mm² THHN COPPER WIRE 1/2" Ø PVC PIPE,ORANGE
C9 SPECIAL PURPOSED OUTLET 1 220V 1760 8.00 A 30 AT 2 - 5.5mm² THHN COPPER WIRE 1/2" Ø PVC PIPE,ORANGE
C10 SPARE OUTLET 1 220V 1760 8.00 A 30 AT 2 - 5.5mm² THHN COPPER WIRE 1/2" Ø PVC PIPE,ORANGE
TOTAL 220V 17796 91.13 A 100 AT 2 - 14.0mm² THHN COPPER WIRE 2" Ø PVC PIPE,ORANGE
CERTIFIED BY : PROJECT TITLE : OWNER : APPROVED BY : REVISIONS : SHEET CONTENTS : SHEET NO. :
AS SHOWN :
4
O OR
D FL R
U N LOO
O F OR
GR UND FL
O
O M O D fd
R G R N
C E F TO R OU
R E G
S OU E LIN T TO
R IP U
A TE E P S PO
GROUND FLOOR W AST
W D O WN SECOND FLOOR
3 ISOMETRIC LAY-OUT PLAN 4 ISOMETRIC LAY-OUT PLAN
P-1 SCALE : 1 : 100 M. P-1 SCALE : 1 : 100 M.
1 1' 2 3 4 5 6 7 1 1' 2 3 4 5 6 7
WASTE PIPE LINE FROM 2ND FLOOR WASTE PIPE LINE TO GROUND FLOOR WATER SOURCE FROM GROUND FLOOR
11
B" B" DOWNSPOUT LINE TO GROUND FLOOR
10
9
8
7
6
1
C 2
C C C
4 3
D D D D
fd
1 1' 2 3 4 5 6 7 1 1' 2 3 4 5 6 7
CERTIFIED BY : PROJECT TITLE : OWNER : APPROVED BY : REVISIONS : SHEET CONTENTS : SHEET NO. :
AS SHOWN :
0.10
▼NATURAL GROUND LINE MUNICIPALITY OF BUENAVISTA
0.10
P-2 EARTH INLET OUTLET EARTH
OFFICE OF THE BUILDING OFFICIALS
0.40
0.60
1. GRADE OF HORIZONTAL PIPING. 9 mmØ RSB MATT BARS @ BUILDING OFFICIAL
0.10
RUN ALL HORIZONTAL PIPING IN PERFECT ALLIGNMENT AND AT A UNIFORM 0.30 M.O.C., BOTHWAYS
GRADE OF NOT LESS THAN TWO PERCENT (2% ).
2 ALL CHANGES OF DIRECTIONS SHALL BE MADE BY THE APPROPRIATE USE OF 0.10 0.40 0.10
4"Ø PVP SOIL PIPE
FORTY FIVE DEGREES (45° ) WYE LONG SWEEP QUARTER BEND, SIXTH EIGHT
OF SIXTEENTH BENDS. 0.60
3. PROHIBITED FITTINGS:
NO DOUBLE HUB OR DOUBLE TEE BRANCH SHALL BE USED ON HORIZONTAL
SOIL OR WASTE PIPE. THE DRILLING AND TAPPING OF BUILDING DRAINAGE,
WASTE OR VENT PIPE USE OF SADDLE HUB AND BENDS ARE PROHIBITED. 4 CATCH BASIN SECTION DETAIL
4. PIPE CLEAN OUTS:
CLEAN OUTS ARE REQUIRED UNDER THE FOLLOWING CONDITIONS. P-2 SCALE : 1 : 20 M. PLUMBING/SANITARY
A. EVERY CHANGE IN HORIZONTAL DIRECTIONS EXCEEDING TWENTY
AND A HALF DEGREES (20 1/2 °).
B. ONE AND ONE HALF METER (1.5 m) INSIDE THE PROPERTY LINE IOmmØ RSB GRAB BAR
BEFORE BUILDING DRAINAGE CONNECTION.
C. AT THE END OF ANY HORIZONTAL PIPE LINE. C.O. C.O.
D. EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF PIPE LINE.
0.30 0.10
5. THE DIGESTIVE CHAMBER OF THE SEPTIC VAULT MUST BE WATER PROOFED ▼NATURAL GROUND LINE
NOT LESS THAN 30mm OF AIR SPACE BE LEFT BETWEEN TOP OF THE SEWAGE
EARTH EARTH
AND UNDER PART OF THE VAULT SLAB.
NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING. a i r s p a c e a i r s p a c e a i r s p a c e
OUTLET OUTLET
6. ALL PLUMBING WORKS SHALL BE DONE BY A LICENSED MASTER PLUMBER 10 mmØ RSB HORIZONTAL BARS
OR PLUMBER CONTRACTOR. @ EVERY 3-LAYERS OF CHB
10mmØ RSB VERTICAL
BARS@ 0.60 M.O.C. INLET INLET
1.80
DIGESTIVE LEACHING LEACHING
1.30
4" x 8" x 16"
CHB WALL CHAMBER CHAMBER CHAMBER
1 PLUMBING SYMBOLS:
P-2
W.C. WATER CLOSET
0.10
GRAVEL
0.10
F.D. FLOOR DRAIN
FAU. FAUCET
0.10
C.B. CATCH BASIN
1.10
1.20
INLET
Man Hole Man Hole Man Hole
90° ELBOW
P-TRAP
SANITARY TEE
0.10
SANITARY WYE 10 mmØ RSB MATT BARS @
0.20 m.o.c., BOTHWAYS
WASTE PIPE LINE
PLAN
WATER PIPE LINE
CERTIFIED BY : PROJECT TITLE : OWNER : APPROVED BY : REVISIONS : SHEET CONTENTS : SHEET NO. :
AS SHOWN :