E.L Iec 60076-3-2013+amd1 2018 2021-7-20
E.L Iec 60076-3-2013+amd1 2018 2021-7-20
2
Template (Provisional) Equipment List 2021-02-03
“R” Required
“S” May be subcontracted, see OD 2012
“SP” Specialized Facility, see IECEE 02-2
“W” Witness testing in the categories “MED” and “MEAS”
“3PPS” Three Phase Power Supply required