0% found this document useful (0 votes)
141 views1 page

E.L Iec 60076-3-2013+amd1 2018 2021-7-20

Standar uji trafo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
141 views1 page

E.L Iec 60076-3-2013+amd1 2018 2021-7-20

Standar uji trafo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

IECEE OD-5003-F1:2021 © IEC 2021 Ed.1.

2
Template (Provisional) Equipment List 2021-02-03

TESTING AND MEASURING EQUIPMENT/ALLOWED SUBCONTRACTING


IEC 60076-3:2013+AMD1:2018
Power transformers – Part 3: Insulation levels, dielectric tests and external clearance in air

“R” Required
“S” May be subcontracted, see OD 2012
“SP” Specialized Facility, see IECEE 02-2
“W” Witness testing in the categories “MED” and “MEAS”
“3PPS” Three Phase Power Supply required

Clause Measurement/testing Testing / measuring equipment / material needed Equipment Classification


AC voltage source
10 Applied voltage test (AV) R
AC high voltage measuring system
11.2 Induced voltage withstand test(IVW) Induced voltage source and voltage measuring system R
Induced voltage source and voltage measurement system
Induced voltage test with partial
11.3 Partial discharge measuring system R
discharge measurement (IVPD)
Coupling capacitor
12 Line terminal AC withstand test (LTAC) Induced voltage source and voltage measuring system R
Impulse voltage generator
13 Lightning impulse test(LI) R
Impulse measuring system
Impulse voltage generator
14 Switching impulse test(SI) R
Impulse measuring system

2021-7-20 1/1 IEC 60076-3:2013+AMD1:2018