0% found this document useful (0 votes)
27 views

Work Experience

Uploaded by

useofno66
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

Work Experience

Uploaded by

useofno66
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 56

Sr No Project Name Is JV JV Name JV Share

Construction of Road Over Bridge consisting of


composite steel girder 1x42700mm (SK) (Launching in
traffic block), PSC girders span lx18800mm (SK)
Not
8 (Launching not required traffic block) and allied works No Not Applicable
Applicable
connecting Narefa- Bawana Sub City to NH-1 over MP
Road at Railway Km. 24/20-18 on Delhi-Ambala
Section Near Anaj Mandi Narela

Improvement of T Junction near Dhaula Kuan Metro


Station including widening of National Highway from
Dhaula Kuan to end of Junction on NH-8 and
Not
10 Imrpovement of T Junction near Defense area No Not Applicable
Applicable
including widening of National Highway up to defense
area on NH-8 and R&R Hospital Link underpass in the
State of Delhi on EPC Mode.

Construction of Elevated Structure between km 200.


900 to km 201. 700 including major bridge on
Not
13 Mayapuri Escape Channel at km 201.450 in Haridwar No Not Applicable
Applicable
on Muzaffarnagar - Haridwar Section of NH 58 in the
State of Uttarakhand

Constructon of Arterial Road from Umang Bhardwaj


Not
14 Chowk to NPR in Gurugram Haryana on EPC Mode No Not Applicable
Applicable
Project

Construction of 4-lane ROB on Delhi-Rewari -Railway


line at LC-31 Spl Crossing on Gurugram Pataudi Road Not
17 No Not Applicable
to Farukhnagar road via Garhi Sadhrana at Km. 2.00 in Applicable
Gurugram District.

Construction of Grade Separated U-Turns at Km 24


Not
18 near Ambience Mall and at Km 26.120 near DLF No Not Applicable
Applicable
Phase-2, Gurugram on NH-48 (Old NH-8)

Widening of RUB consisting of RCC Box No. 2 & 3 of


size 9.00x5.75 (Internal Dimensions) each & Box No. 4
21 Yes RKC - DCC (JV) 49%
of size 7.50x4.75m (Internal Dimensions) by box
pushing technique near Kishanganj Station.

Construction of Bridge on Najafgarh drain at


Basaidarapur along with road improvement on either Not
23 No Not Applicable
side of bridge drainage scheme, footpath etc. Applicable
complete.
Construction of Bridge on Supplementary Drain on
NH-10, Nangloi, Delhi to cover complete width of 60
m with road improvement in 100 meter length on Not
24 No Not Applicable
either side of bridge including making of drainage Applicable
scheme, footpath etc. complete (after dismantling the
existing bridge).

Construction of Bridge on Najafgarh Drain at Tri


Nagar/Inderlok, Karampura and Rampura, Delhi to
cover the complete Right of Way (ROW) excluding Not
25 No Not Applicable
area of already constructed bridge alongwith road Applicable
improvement on either side of bridge including
making of drainage scheme, footpath etc. complete.

Construction of Flyover over at Sheela Chowk on the


intersection of Delhi - Hisar Road with RKDB Road & Not
26 No Not Applicable
Construction of Four Lane Bridge on JLN Feeder and Applicable
BSB Canal on RKDB Road in Rohtak City

Construction of ROB at LC No. 6B on Hisar - Mangli -


Not
28 Sharwa Road Hisar (CM Announcement No. 20371 No Not Applicable
Applicable
Dated 03.11.2018)

Construction of Road Over Bridge cum Road Under


Bridge in lieu of Level crossing No. B-3/2-E at KM 4/4- Not
31 No Not Applicable
5 on Ludhiana-Ferozepur section and Road Under Applicable
Bridge at KM 4.845 on Ludhiana-Ferozepur section.

Construction of six lane Flyover at km. 315+200 and


Construction of entry/exit ramp from km. 320+300 to
km. 321+200 including FOB at km. 320+840 and
Construction of Additional Two Lane ROB on Both
Not
34 sides of Existing Four Lane ROB at km. 311+865 along No Not Applicable
Applicable
with approaches and Construction of YUP at km.
311+770 along with Improvement of Sherpur Chowk
on Panipat - Jalandhar section of NH-44 (Old NH-1) in
the State of Punjab

Construction of 4-lane NH-344P-Package-4 (From km


0+000 to km 29+600, 29.6 km), starting from Bawana
RKC - Bharat
36 Industrial Area, Delhi (at km 7+750 of NH-344M) till Yes 90%
(JV)
Soni pat bypass of NH-352A at Village Barwasani,
Sonipat in Haryana as spur of NH-344M on EPC mode
Project Project
JV Other Party State of Principal Employer
Project Cost Allotment Appointed
Name Project Name & Address
Date Date

Dy. Chief Engineer


Not Applicable 18.22 Cr. Delhi 14-Sep-16 18-Nov-16 (Const-I), N. Rly. SE
Road, New Delhi

NHAI, G - 5&6, Sector


Not Applicable 130.00 Cr. Delhi 12-Sep-17 23-Mar-18 10, Dwarka, New
Delhi - 110075

NHAI, G - 5&6, Sector


Not Applicable 45.00 Cr. Uttarakhand 1-Aug-18 1-Nov-18 10, Dwarka, New
Delhi - 110075

GMDA, Plot No. 44,


Not Applicable 80.75 Cr. Haryana 27-Aug-18 12-Nov-18
Sector 32, Gurugram

Superintending Engg.
Not Applicable 33.42 Cr. Haryana 6-Nov-18 28-Nov-18 Gurugram Circle, PWD
B&R Br. Gurugram

NHAI, G - 5&6, Sector


Not Applicable 90.00 Cr. Haryana 9-Nov-18 5-Mar-19 10, Dwarka, New
Delhi - 110075

Damodar Dy. Chief


Construction 19.33 Cr. Delhi 1-Jan-19 1-Jan-19 Engineer/Const. Tilak
Company Bridge, New Delhi

Ex. Eng. FPD F-11,


PWD, Mukarba
Not Applicable 34.64 Cr. Delhi 19-Feb-19 1-Mar-19 Chowk, GT Karnal
Road, New Delhi -
110033
Ex. Eng. FPD F-14,
PWD, Mukarba
Not Applicable 33.50 Cr. Delhi 20-Feb-19 28-Feb-19 Chowk, GT Karnal
Road, New Delhi -
110033

Ex. Eng. FPD F-12,


PWD, Mukarba
Not Applicable 53.89 Cr. Delhi 1-Mar-19 8-Mar-19 Chowk, GT Karnal
Road, New Delhi -
110033

Superintending Engg.
Not Applicable 68.50 Cr. Haryana 19-Nov-19 12-Dec-19 Civil Circle, PWD B&R
Br. Rohtak

Employer-cum-
Superintending
Not Applicable 22.77 Cr. Haryana 27-Jan-20 14-Feb-20
Engineer, Hisar Circle,
PWD B&R Br., Hisar

DYCE-C-2-CDG-Engg.
Not Applicable 28.91 Cr. Punjab 2-Jun-20 2-Jun-20 Near Railway Station,
Chandigarh - 160002

NHAI, RO Chandigarh,
Not Applicable 81.99 Cr. Punjab 6-Jan-21 15-Mar-21 Bays No. 35-38, Sector
4, Panchkula

Bharat NHAI, G - 5&6, Sector


Haryana &
Construction (I) 694.00 Cr. 29-Jul-21 26-Nov-21 10, Dwarka, New
Delhi
Pvt. Ltd. Delhi - 110075
Stipulated Date of Project Actual Date of Completion
Type of Project Project Tenor
Completion Status Completion Cost

13-Dec-17 Railway 15.00 Month Completed 17-Feb-21 22.40 Cr.

19-Sep-19 EPC 18.00 Month Completed 31-Oct-20 202.72 Cr.

Data Not
1-May-20 EPC 18.00 Month Completed 12-May-21
Available

8-Jun-20 EPC 18.00 Month Completed 7-Apr-23 110.99 Cr.

28-Feb-20 Item Rate 15.00 Month Completed 28-Feb-22 40.60 Cr.

4-Sep-20 EPC 18.00 Month Completed 12-Dec-21 108.68 Cr.

30-Jun-20 Railway 18.00 Month Completed 30-Sep-21 18.67 Cr.

1-Sep-20 Item Rate 18.00 Month Completed 30-Jun-22 34.64 Cr.


27-Nov-21 Item Rate 21.00 Month Completed 15-Apr-23 33.50 Cr.

7-Mar-21 Item Rate 24.00 Month Completed 31-Aug-22 53.89 Cr.

11-Dec-21 Item Rate 24.00 Month Completed 15-Sep-22 75.95 Cr.

13-Aug-21 Item Rate 18.00 Month Completed 10-Feb-23 44.94 Cr.

1-Dec-21 Railway 18.00 Month Completed 31-Dec-22 32.10 Cr.

14-Sep-22 EPC 18.00 Month Completed 17-May-23 96.99 Cr.

31-Mar-24 EPC 24.00 Month Completed 7-Mar-24 931.45 Cr.


Maintenance Maintenance
Amount of PBG BG Number Type of BG
Period Completion Date

65,00,000.00 11JGT02203560001 Performance


60.00 Month 3-Feb-24
3,25,00,000.00 11JGT02212150001 Bank Guarantee

Performance
120.00 Month 12-May-31 13,500,000.00 11JGT02211390001
Bank Guarantee

Performance
48.00 Month 6-Apr-27 24,225,000.00 002BG01212490002
Bank Guarantee

1,02,00,000.00 03660100 000792 Performance


36.00 Month 28-Feb-25
1,21,28,026.00 11JGT02211830001 Bank Guarantee

Performance
48.00 Month 12-Dec-25 27,000,000.00 11JGT02203560002
Bank Guarantee

Not Available Not Available Not Available Not Available Not Available

Performance
12.00 Month 30-Jun-23 7,882,385.00 002BG01212490001
Bank Guarantee
Performance
12.00 Month 15-Apr-24 4,950,225.00 070BG01212490003
Bank Guarantee

Performance
12.00 Month 31-Aug-23 12,634,118.00 070BG01212490001
Bank Guarantee

37,80,000.00 44650100 000018


Performance
12.00 Month 15-Sep-26 1,90,79,082.00 44650100 000032
Bank Guarantee
1,36,99,090.00 11JGT02193440003

1,04,84,441.00 E33GT02230970005 Performance


36.00 Month 10-Feb-26
45,53,237.00 11JGT02200370003 Bank Guarantee

6.00 Month 30-Jun-23

Performance
120.00 Month 12,298,500.00 11JGT02210320001
Bank Guarantee

6,00,00,000.00 002BG01212590001 Performance


120.00 Month
14,82,00,000.00 11JGT02212220001 Bank Guarantee
PBG Expiry PBG Claim
Issuance Bank PBG Issue Date PBG Close Date
Date Expiry Date

21-Dec-20 20-Apr-24 20-Apr-25


HDFC Bank Ltd.
03-Aug-21 02-Apr-24 02-Apr-25

HDFC Bank Ltd. 19-May-21 14-May-24 14-May-25

Yes Bank Ltd. 6-Sep-21 2-Sep-24 2-Sep-25

Axis Bank Ltd. 29-07-2022


30-Apr-25 30-Apr-26
HDFC Bank Ltd. 02-07-2021

HDFC Bank Ltd. 21-Dec-20 20-Dec-23 19-Dec-24

Not Available Not Available Not Available Not Available Not Available

Yes Bank Ltd. 6-Sep-21 30-Jun-23 30-Jun-24 24-Aug-23


Yes Bank Ltd. 6-Sep-21 30-Apr-24 30-Apr-25

Yes Bank Ltd. 6-Sep-21 30-Sep-23 30-Sep-24 13-Sep-23

Axis Bank Ltd. 09-01-2023 05-01-2024 05-01-2025


Axis Bank Ltd. 01-05-2023 27-04-2024 27-04-2025
HDFC Bank Ltd. 10-12-2019 09-03-2026 09-03-2027

07-04-2023 05-04-2024 05-04-2025


HDFC Bank Ltd.
06-02-2020 04-10-2024 04-10-2025

HDFC Bank Ltd. 1-Feb-21 28-Aug-24 28-Aug-24

Yes Bank Ltd. 16-09-2021 09-09-2025 09-09-2026


HDFC Bank Ltd. 10-08-2021 06-08-2025 06-08-2026
Sr No Project Name Is JV JV Name JV Share

Construction of 3 Lane ROB and Underpass at LC No.


54 on Jind Panipat Section (Location 66/9-10) crossing Not
1 No Not Applicable
road alongwith Delhi Water Carrier Link Channel (CLC) Applicable
in Panipat Distt.

Construction of 4 Lane ROB in Km 165 (Mohkampur)


on NH-72 (New No. 07) in Dehradun in the State of Not
2 No Not Applicable
Uttarakhand in EPC Mode. Job No.: 72 (New No. 07)- Applicable
UR-2014-15-002-S&R(B))

Construction of Single Lane Limited Height Subway in


lieu of U/M LC No. 5 (Km. 5/4-5), LC No. 10 (Km. 12/1-
2), LC No. 23 (Km. 28/7-8), LC No. 37 (Km. 43/9-10), LC
No. 39 (Km. 46/12-13), LC No. 42 (Km. 51/11-12), LC Ram Kumar -
3 Yes 51%
No. 44 (Km. 54/12-13), LC No. 57 (Km. 73/3-4), LC No. Balaji JV
58 (Km. 73/11-12) and LC No. 59 (Km. 77/3-4) (Total
10 Nos.) on Narwana - Kurukshetra section of Delhi
Division (By Cut and Cover Method)

Construction of Rail Over Bridge (ROB) in lieu of Level


Crossing No. C-221 at Km. 104.950 on NH 254 at Maur Not
4 No Not Applicable
on Maur - Talwandi Road in the State of Punjab on Applicable
EPC Mode.

Improvement of T Junction near Dhaula Kuan Metro


Station including widening of National Highway from
Dhaula Kuan to end of Junction on NH-8 and
Not
5 Imrpovement of T Junction near Defense area No Not Applicable
Applicable
including widening of National Highway up to defense
area on NH-8 and R&R Hospital Link underpass in the
State of Delhi on EPC Mode.

Six laning of Panipat-Jalandhar from Km. 96.000 to


Km. 387.10-Providing of underpass for the resident of
village Pratap Garh- Construction of Major Bridge and Not
6 No Not Applicable
their approaches on service road adjacent to existing Applicable
Sarswati Bridge at Km 160+100 on NH-14 (Old NH-1)
in the state of Haryana on EPC Mode.

Construction of Elevated Structure between km 200.


900 to km 201. 700 including major bridge on
Not
7 Mayapuri Escape Channel at km 201.450 in Haridwar No Not Applicable
Applicable
on Muzaffarnagar - Haridwar Section of NH 58 in the
State of Uttarakhand
Constructon of Arterial Road from Umang Bhardwaj
Not
8 Chowk to NPR in Gurugram Haryana on EPC Mode No Not Applicable
Applicable
Project

Construction of 02 lane single span steel bridge across


Not
9 narwana Branch canal at RD 164950 near village No Not Applicable
Applicable
lsmailpur Ambala

Construction of 2 Lane ROB and its approaches in Lieu


of existing LC No. 111-C at Km. 300.500 on NH-71 Not
10 No Not Applicable
(New NH 352) at District Jind in the State of Haryana Applicable
on EPC Mode.

Construction of 4-lane ROB on Delhi-Rewari -Railway


line at LC-31 Spl Crossing on Gurugram Pataudi Road Not
11 No Not Applicable
to Farukhnagar road via Garhi Sadhrana at Km. 2.00 in Applicable
Gurugram District.

Construction of Grade Separated U-Turns at Km 24


Not
12 near Ambience Mall and at Km 26.120 near DLF No Not Applicable
Applicable
Phase-2, Gurugram on NH-48 (Old NH-8)

Work of construction of 2-lane Elevated road over LC


Not
13 No. 60 at Km. 70/6-7 on Delhi Bhatinda Railway line No Not Applicable
Applicable
crossing Kacha Beri road in Rohtak - City portion

Widening of RUB consisting of RCC Box No. 2 & 3 of


size 9.00x5.75 (Internal Dimensions) each & Box No. 4
14 Yes RKC - DCC (JV) 49%
of size 7.50x4.75m (Internal Dimensions) by box
pushing technique near Kishanganj Station.

Construction of ROB and its approaches In lieu of


existing level crossing No.138-B at KM 1.45 on NH-21A Not
15 No Not Applicable
(New NH-105) at Pinjore (Pinjore-Baddi Section) In the Applicable
State of Haryana on EPC Mode

Construction of Bridge on Najafgarh drain at


Basaidarapur along with road improvement on either Not
16 No Not Applicable
side of bridge drainage scheme, footpath etc. Applicable
complete.

Construction of Bridge on Supplementary Drain on


NH-10, Nangloi, Delhi to cover complete width of 60
m with road improvement in 100 meter length on Not
17 No Not Applicable
either side of bridge including making of drainage Applicable
scheme, footpath etc. complete (after dismantling the
existing bridge).
Construction of Bridge on Najafgarh Drain at Tri
Nagar/Inderlok, Karampura and Rampura, Delhi to
cover the complete Right of Way (ROW) excluding Not
18 No Not Applicable
area of already constructed bridge alongwith road Applicable
improvement on either side of bridge including
making of drainage scheme, footpath etc. complete.

Construction of Flyover over at Sheela Chowk on the


intersection of Delhi - Hisar Road with RKDB Road & Not
19 No Not Applicable
Construction of Four Lane Bridge on JLN Feeder and Applicable
BSB Canal on RKDB Road in Rohtak City

Construction of approaches of ROB in Lieu of LC No. B-


25 at Km 25/5-6 on Ludhiana Jakhal section of
Northern Railway falling on Ahmedgarh Pohir Road at Not
20 No Not Applicable
Ahmedgarh District Sangrur in the State of Punjab inc. Applicable
Main Road, Const. of LHS (Limited Height Subway),
Service Roads, Diversion Roads and Junction etc.

Construction of ROB at LC No. 6B on Hisar - Mangli -


Not
21 Sharwa Road Hisar (CM Announcement No. 20371 No Not Applicable
Applicable
Dated 03.11.2018)

Reconstruction of Single Span Steel Bridge at RD


Not
22 11526, RD 23000 of BML Barwala Link Channel and RD No Not Applicable
Applicable
321210 of Sirsa Branch.

Construction of 2 Lane ROB over LC No. 60 at Km.


70/6-7 over Delhi Bathinda Railway Line Crossing Not
23 No Not Applicable
Kacha Beri Road in Rohtak Town - Railway Portion Applicable
Only

Construction of Road Over Bridge cum Road Under


Bridge in lieu of Level crossing No. B-3/2-E at KM 4/4- Not
24 No Not Applicable
5 on Ludhiana-Ferozepur section and Road Under Applicable
Bridge at KM 4.845 on Ludhiana-Ferozepur section.

Construction of six lane Flyover at km. 315+200 and


Construction of entry/exit ramp from km. 320+300 to
km. 321+200 including FOB at km. 320+840 and
Construction of Additional Two Lane ROB on Both
Not
25 sides of Existing Four Lane ROB at km. 311+865 along No Not Applicable
Applicable
with approaches and Construction of YUP at km.
311+770 along with Improvement of Sherpur Chowk
on Panipat - Jalandhar section of NH-44 (Old NH-1) in
the State of Punjab
Development of Six- lane access-controlled highway
from Design Chainage 8+130 (near Mohand) to
16+380 Daat kali Tunnel of Ganeshpur - Dehradun Not
26 No Not Applicable
section of NH-72A in the state of Uttar Pradesh & Applicable
Uttarakhand under Bharatmala Pariyojana on EPC
mode (Package-2)

Construction of 4-lane NH-344P-Package-4 (From km


0+000 to km 29+600, 29.6 km), starting from Bawana
Not
27 Industrial Area, Delhi (at km 7+750 of NH-344M) till No Not Applicable
Applicable
Soni pat bypass of NH-352A at Village Barwasani,
Sonipat in Haryana as spur of NH-344M on EPC mode

Construction of Road Under Bridge in lieu of LC No.


Spl-52/E-3 at km 70.051 on ASR-PTK section,
Construction of Road Over Bridge of span 1x30.00 mtr
Bow-String Girder in lieu of LC No. A-2/E-2 at km 02/7- Not
28 No Not Applicable
9 between JRC-SCPD on JRC-PTK section of Firozpur Applicable
division and construction of 4-lane Road Over Bridge
of span 1x48.0 mtr at km 07/0-1 on Ludhiana-Dhuri
section of Ambala Division

Development of 6-lane access controlled Ludhiana-


Bathinda Greenfield highway section of NH-54AD
from junction with Amritsar-Bathanda Greenfield
Road (NH-754A) near Rampura Phul to junction with
Not
29 Moga-Barnala Road (NH-703) near village TallewaJ No Not Applicable
Applicable
(from km 0+000 to km 30+300) as a part of Ludhiana-
Ajmer Economic Corridor in the state of Punjab on
Hybrid Annuity Mode under Bharatmala Pariyojana
Phase-l (Package- I )

Upgradation and Four Laning of Poanta Saheb-


Ballupur Section of NH-72 in the State of Himachal
Not
30 Pradesh and Uttarakhand under NH(O) on Hybrid No Not Applicable
Applicable
Annuity Mode. Package-I: Poanta Saheb - Mednipur
from Design Ch 0.000 to Ch 18.700

Construction of HL Bridge SYL and Narwana Branch


Not
31 Canals on Karnal Kachwa Sambli Kaul Road (Road ID No Not Applicable
Applicable
7370) in Karnal District (Under CRF Scheme)
Construction of Flyover at Nand Nagri & Gagan
Cinema Junction of Mangal Pandey Marg including
Not
32 Elevated Corridor, Footpath, Road Work including No Not Applicable
Applicable
Road Signages, Electrical Works, Drainage, Rain Water
Harvesting and Allied Works on EPC Mode.

Construction of 6-lane Greenfield Ambala Ring Road


starting from junction with Shamli-Ambala section of
NH-344GM near Village Kapuri (Design km 18+226 )
Not
33 and terminating at Ismailabad - Ambala Section of NH- No Not Applicable
Applicable
152 near Village Bhari (Design km 40+750) (Total
length 22.524 Kms) under Bharatmala Pariyojana in
the State of Haryana on Hybrid Annuity Mode

Repair and rehabilitation of Neelam and Badkhal Not


34 No Not Applicable
Flyover at Faridabad Applicable

Construction / Widening of Structures i.e., Major


Bridges, Minor Bridges, ROBs, Culvert, LVUP, Hump
Subway, rectification of drainage system, Entry/Exit,
Not
35 rectification of rain cuts and other miscellaneous No Not Applicable
Applicable
works at various locations on Panipat-Jalandhar
section of NH-I (new NH 44) from Km 96+000 to 387+ I
00 in the State of Haryana and Punjab

Work of Development & Construction of Elevated


Corridor from km 38/660 to km 42/690 (from Iscon Not
36 No Not Applicable
Junction to start point of approach of Sanand Flyover) Applicable
of NH-147 in the State of Gujarat on EPC Mode

Long Term Rectification of MoRT&H identified Black


Spots (17 Nos) & removal of 2 at grade junctions and
Not
37 allied works on existing 4/6 lane of Hyderabad- No Not Applicable
Applicable
Vijaywada Section of NH-65 from Km 40.000 to Km
221.500 in the State of Telangan on EPC Mode

6 Laning of Pune - Hyderabad section of NH-65 from


Km 493+000 to 524+000 from Sangareddy X roads to
Not
38 Madinaguda (excluding BHEL Flyover from Km No Not Applicable
Applicable
520+000 to 521+650) in the State of Telangana on EPC
Mode.
Rehabilitation, Upgradation & Widening of existing
Highway to Rigid Pavement 2 Lane/2 Lane with Paved
Shoulder of NH 965DD from Lonand - Shirval - Bhor -
Not
39 Mandangad - Pachral Section Shindewadi Phata to No Not Applicable
Applicable
Varandha Ghat Dist Border from Km 33/550 to 92/550
(Design Ch. 33+550 to 91+003) (Total Design Lenght =
57.453 Km) in the State of Maharashtra on EPC Mode.

Earthwork, in cutting/filling, blanketing, viaduct, major


bridges, minor bridges, RUBs, protection works and
other allied works between Km 70.750 to Km 77.175 Not
40 No Not Applicable
(6.425 Km) within Punjab Area for Construction of Applicable
new line from Kartoli Punjab to Talwara block section
of Nangal Dam – Talwara new BG. Rail Link

Work of Construction of approaches of 2 Lane RUB on


Sonipat Ganaur Road at Km 10.50 crossing Rajlu Garhi Not
41 No Not Applicable
to MMLP Barhi Railway Line at EP55/9A and 55/10 in Applicable
Sonepat District.

Extension of Ashram Flyover to ONO Flyover (SH:


Not
42 FOBs, Ramps, Footpath, Road Work including road No Not Applicable
Applicable
signage, street light works, drainage & allied works.

Construction of Road Over Bridge consisting of


composite steel girder 1x42700mm (SK) (Launching in
traffic block), PSC girders span lx18800mm (SK)
Not
43 (Launching not required traffic block) and allied works No Not Applicable
Applicable
connecting Narefa- Bawana Sub City to NH-1 over MP
Road at Railway Km. 24/20-18 on Delhi-Ambala
Section Near Anaj Mandi Narela

Construction of ROB including approaches of existing


Not
44 level crossing no. B-31 at Km 224.400 of NH-15 (New No Not Applicable
Applicable
NH-54) at Faridkot in the State of Punjab.

Construction of Arterial Road from Umang Bhardwaj


Not
45 Chowk to NPR in Gurugram Haryana on EPC Mode No Not Applicable
Applicable
Project.
Construction of Permanent Steel Truss Superstructure
Road Bridge High Level 40.20M long over running
Narwana Branch at RD 7245ft. and 51.20M Long over
running Bakhra Main Line Canal at RD 165600 ft. Not
46 No Not Applicable
crossing G.T. road NH-I Sirhind to Bhadson via Applicable
Tarkheri Road in Km. 1.51 and 4.265 respectively
including approaches 6Mx3M culvert in RD 1580, in
Distt. Fatehgarh Sahib.

Construction of 4 Lane ROB at LC No. SPL-1/299/14-15


at Bathinda at RD 287.95 of NH-15 crossing Delhi Not
47 No Not Applicable
Bathinda Railway Line in the State of Punjab on EPC Applicable
Mode

Construction of Elevated road over Barapullah Nallah


consisting of steel girder span 1 x53543mm
(Launching required traffic block), Steel matching
Girders towards Aurbindo Marg 1 x 19830mm
Average and Steel matching Girders towards Sarai Not
48 No Not Applicable
Kale Khan side 1 x 24305mm average (Launching not Applicable
required traffic block), PSC girders span 2x32270mm +
2 x (32270 + 21600 mm) (Launching not required
traffic block) starting from Sarai Kale Khan to Aurbindo
Road near INA market. Phase-II

Construction of Flyovers in Akola City in the State of Ram Kumar -


49 Yes 51%
Maharashtra on EPC Mode Jandu (JV)

Upgradation of NH-81 with a minimum of 2-Lane with


paved shoulder configuration starting from km 19.205
50 Yes Singh - RKC (JV) 26%
to km 46.550 in the District of Malda on EPC mode in
the state of West Bengal.

CONSTRUCTION AND UPGRADATION OF EXISTING


ROAD TO 2-LANE WITH PAVED SHOULDER FROM
EXISTING CHAINAGE KM 509.725 TO KM 528.000
(DESIGN CHAINAGE KM 490.550 TO KM 507.850) OF Bharat - RKC
51 Yes
NH-58 (NEW NH-07) (BENAKULI BEND TO MANA (JV)
VILLAGE) IN EPC MODE UNDER CHARDHAM
PROGRAMME IN THE STATE OF UTTARAKHAND
(LENGTH= 17.30 KMs)

52
53
54
55
56
Project Project
JV Other Party State of Principal Employer
Project Cost Allotment Appointed
Name Project Name & Address
Date Date

Executive Engineer,
Provl. Divn. PWD B&R
Not Applicable 25.64 Cr. Haryana 30-Jun-15 30-Jun-15
Br. CD-25, Panipat,
HSRBDC

Chief Engineer, NH &


Bridge (G.Z),
Not Applicable 43.00 Cr. Uttarakhand 21-Apr-16 19-Jul-16
Uttarakhand PWD,
Dehradun

Dy. Chief
Shri Balaji
14.86 Cr. Haryana 14-Jul-16 21-Oct-16 Engineer/Const. N.
Builders
Rly., Ambala Cantt.

Superintending
Engineer, NH Circle,
Not Applicable 47.00 Cr. Punjab 22-Aug-16 21-Sep-16
Punjab PWD B&R Br.,
Ferozepur

NHAI, G - 5&6, Sector


Not Applicable 130.00 Cr. Delhi 12-Sep-17 23-Mar-18 10, Dwarka, New
Delhi - 110075

NHAI, RO Chandigarh,
Not Applicable 19.90 Cr. Haryana 20-Jun-18 14-Aug-18 Bays No. 35-38, Sector
4, Panchkula

NHAI, G - 5&6, Sector


Not Applicable 45.00 Cr. Uttarakhand 1-Aug-18 1-Nov-18 10, Dwarka, New
Delhi - 110075
GMDA, Plot No. 44,
Not Applicable 80.75 Cr. Haryana 27-Aug-18 12-Nov-18
Sector 32, Gurugram

Executive Engineer,
Not Applicable 3.87 Cr. Haryana 28-Sep-18 28-Sep-18 SYL W/S Division,
Ambala

Superintending Engg.
National Highway
Not Applicable 32.25 Cr. Haryana 23-Oct-18 1-Feb-19
Circle, PWD B&R Br.
Jind

Superintending Engg.
Not Applicable 33.42 Cr. Haryana 6-Nov-18 28-Nov-18 Gurugram Circle, PWD
B&R Br. Gurugram

NHAI, G - 5&6, Sector


Not Applicable 90.00 Cr. Haryana 9-Nov-18 5-Mar-19 10, Dwarka, New
Delhi - 110075

Superintending Engg.
Not Applicable 43.83 Cr. Haryana 6-Dec-18 28-Dec-18 Civil Circle, PWD B&R
Br. Rohtak

Damodar Dy. Chief


Construction 19.33 Cr. Delhi 1-Jan-19 1-Jan-19 Engineer/Const. Tilak
Company Bridge, New Delhi

Superintending Engg.
Chandigarh Circle,
Not Applicable 29.97 Cr. Haryana 5-Feb-19 4-Jun-19
PWD B&R Br.
Chandigarh - 160020

Ex. Eng. FPD F-11,


PWD, Mukarba
Not Applicable 34.64 Cr. Delhi 19-Feb-19 1-Mar-19 Chowk, GT Karnal
Road, New Delhi -
110033

Ex. Eng. FPD F-14,


PWD, Mukarba
Not Applicable 33.50 Cr. Delhi 20-Feb-19 28-Feb-19 Chowk, GT Karnal
Road, New Delhi -
110033
Ex. Eng. FPD F-12,
PWD, Mukarba
Not Applicable 53.89 Cr. Delhi 1-Mar-19 8-Mar-19 Chowk, GT Karnal
Road, New Delhi -
110033

Superintending Engg.
Not Applicable 68.50 Cr. Haryana 19-Nov-19 12-Dec-19 Civil Circle, PWD B&R
Br. Rohtak

Executive Engineer,
Not Applicable 25.80 Cr. Punjab 7-Jan-20 7-Jan-20 Construction Division,
PWD B&R, Malerkotla

Employer-cum-
Superintending
Not Applicable 22.77 Cr. Haryana 27-Jan-20 14-Feb-20
Engineer, Hisar Circle,
PWD B&R Br., Hisar

Executive Engineer,
Not Applicable 10.80 Cr. Haryana 30-Mar-20 20-Apr-20 Narwana W/S
Division, Narwana

Superintending Engg.
Not Applicable 13.31 Cr. Haryana 24-Apr-20 24-Apr-20 Civil Circle, PWD B&R
Br. Rohtak

DYCE-C-2-CDG-Engg.
Not Applicable 28.91 Cr. Punjab 2-Jun-20 2-Jun-20 Near Railway Station,
Chandigarh - 160002

NHAI, RO Chandigarh,
Not Applicable 81.99 Cr. Punjab 6-Jan-21 6-Jan-21 Bays No. 35-38, Sector
4, Panchkula
NHAI, G - 5&6, Sector
Uttarakhand &
Not Applicable 766.90 Cr. 23-Mar-21 7-Oct-21 10, Dwarka, New
Uttar Pradesh
Delhi - 110075

NHAI, G - 5&6, Sector


Haryana &
Not Applicable 694.00 Cr. 29-Jul-21 26-Nov-21 10, Dwarka, New
Delhi
Delhi - 110075

CAO-C-NR-Engg. N.
Not Applicable 27.37 Cr. Punjab 1-Oct-21 1-Oct-21 Rly., Kashmiri Gate,
Delhi - 110006

NHAI, G - 5&6, Sector


Not Applicable 658.00 Cr. Punjab 11-Nov-21 14-Sep-23 10, Dwarka, New
Delhi - 110075

Uttarakhand & NHAI, G - 5&6, Sector


Not Applicable 390.00 Cr. Himachal 13-Jun-22 1-May-23 10, Dwarka, New
Pradesh Delhi - 110075

Employer-cum-
Superintending
Not Applicable 23.39 Cr. Haryana 12-Jul-22 12-Jul-22 Engineer, Karnal
Circle, PWD B&R Br.,
Karnal
Ex. Eng. FPD F-31,
Not Applicable 157.85 Cr. Delhi 20-Jan-23 3-Feb-23 PWD, JLN Stadium,
New Delhi - 110003

NHAI, G - 5&6, Sector


Not Applicable 691.00 Cr. Haryana 27-Mar-23 11-Oct-23 10, Dwarka, New
Delhi - 110075

FMDA, HSIDDC
Not Applicable 4.04 Cr. Haryana 13-Apr-23 8-May-23 Building, Sector 69,
Faridabad - 121101

NHAI, G - 5&6, Sector


Haryana &
Not Applicable 485.00 Cr. 11-Jul-23 5-Dec-23 10, Dwarka, New
Punjab
Delhi - 110075

CE (NH) R&B, Gujarat


Not Applicable 385.82 Cr. Gujarat 28-Feb-24
MoRT&H

NHAI, G - 5&6, Sector


Not Applicable 288.00 Cr. Telangana 5-Mar-24 10, Dwarka, New
Delhi - 110075

RO MoRT&H,
Not Applicable 790.00 Cr. Telangana 6-Mar-24
Hyderabad, Telangana
CE (NH) PWD
Not Applicable 310.00 Cr. Maharashtra 12-Mar-24 Maharashtra
MoRT&H

Not Applicable 264.98 Cr. Punjab

Employer-cum-
Superintending
Not Applicable 9.29 Cr. Haryana 22-Jul-20 22-Jul-20 Engineer, Sonepat
Circle, PWD B&R Br.
Sonepat

Executive Engineer,
FPD, F31, JLN
Not Applicable 128.79 Cr. Delhi 5-Jun-20 Stadium, New Delhi
via KCC Buildcon
Private Limited

Dy. Chief Engineer


Not Applicable 18.22 Cr. Delhi 14-Sep-16 18-Nov-16 (Const-I), N. Rly. SE
Road, New Delhi

Ex. Eng. Central Works


Not Applicable 36.00 Cr. Punjab 14-Oct-16 2-Mar-17 Div. PWD B&R Br.
Ferozepur

Gurugram
Metropolitan
Not Applicable 80.75 Cr. Haryana 27-Aug-18 12-Dec-18
Development
Authority
Ex. Eng. Const. Div.,
Not Applicable 17.66 Cr. Punjab 8-Jul-16 8-Jul-16
PWD Br. Sirhind

Ex. Eng. CWD No. 1


Not Applicable 41.00 Cr. Punjab 28-Aug-14 2-Oct-14 PB, PWD B&R
Bathinda

Dy. Chief Engg/Const-


Not Applicable 16.66 Cr. Delhi 1-Feb-16 28-Mar-16 I, State Entry Road,
New Delhi

NHAI, Narang Towers,


1st Floor, Opp. to
Jandu Office of DCP Traffic
163.98 Cr. Maharashtra 20-Nov-18 22-Feb-19
Construction Co. (Nagpur City), Palm
Road, Civil Lines,
Nagpur - 440001 MH

SE, NH Circle No. II,


PW(Roads)
Directorate, Sarak
Singh
146.78 Cr. West Bengal 26-Mar-18 26-Mar-18 Bhawan,
Construction Co.
Lambodarpur, Suri,
Birbhum - 731101,
WB

165.00 Cr.
Stipulated Date of Project Actual Date of Completion
Type of Project Project Tenor
Completion Status Completion Cost

31-Dec-18 Item Rate 24.00 Month Completed 31-Dec-18 25.64 Cr.

16-Nov-18 EPC 24.00 Month Completed 30-Sep-18 47.46 Cr.

13-Jun-17 Railway 12.00 Month Completed 30-May-18

20-Sep-18 EPC 24.00 Month Completed 31-Dec-19 47.39 Cr.

19-Sep-19 EPC 18.00 Month Completed 31-Oct-20 202.72 Cr.

13-Aug-19 EPC 12.00 Month Completed 9-Dec-19

1-May-20 EPC 18.00 Month Completed 12-May-21


8-Jun-20 EPC 18.00 Month Completed 7-Apr-23 110.99 Cr.

27-Mar-19 Item Rate 6.00 Month Completed

1-Aug-21 EPC 30.00 Month Completed

28-Feb-20 Item Rate 15.00 Month Completed 28-Feb-22 40.60 Cr.

4-Sep-20 EPC 18.00 Month Completed 12-Dec-21 108.68 Cr.

27-Dec-20 Item Rate 24.00 Month Completed

30-Jun-20 Railway 18.00 Month Completed 30-Sep-21 18.67 Cr.

30-Jun-24 EPC 30.00 Month Running

1-Sep-20 Item Rate 18.00 Month Completed 30-Jun-22 34.64 Cr.

27-Nov-21 Item Rate 21.00 Month Completed 15-Apr-23 33.50 Cr.


7-Mar-21 Item Rate 24.00 Month Completed 31-Aug-22 53.89 Cr.

11-Dec-21 Item Rate 24.00 Month Completed 15-Sep-22 75.95 Cr.

6-Jul-21 Item Rate 18.00 Month Completed

13-Aug-21 Item Rate 18.00 Month Completed 10-Feb-23 44.94 Cr.

19-Feb-21 Item Rate 10.00 Month Completed

23-Apr-21 Item Rate 12.00 Month Completed

1-Dec-21 Railway 18.00 Month Completed 31-Dec-22 32.10 Cr.

5-Jul-23 EPC 18.00 Month Completed


30-Jun-24 EPC 24.00 Month Running

31-Mar-24 EPC 24.00 Month Running

30-Sep-22 Railway 12.00 Month Completed

13-Sep-25 HAM 24.00 Month Running

30-Apr-25 HAM 24.00 Month Running

30-Apr-24 Item Rate 18.00 Month Running


2-Aug-24 EPC 18.00 Month Running

10-Oct-25 HAM 24.00 Month Running

30-Jun-24 Item Rate 16.50 Month Running

4-Dec-25 EPC 24.00 Month Running

28-Feb-26 EPC 24.00 Month Running

EPC 18.00 Month Running

EPC 24.00 Month Running


EPC 24.00 Month Running

Railway 18.00 Month Running

Item Rate 12.00 Month Running

Item Rate 12.00 Month Running

13-Dec-17 Railway 15.00 Month Completed 17-Feb-21 22.40 Cr.

2-Sep-18 Item Rate 18.00 Month Completed 31-Dec-19 37.32 Cr.

8-Jun-20 EPC 18.00 Month Completed 7-Apr-23 110.99 Cr.


31-May-18 EPC 24.00 Month Completed 31-May-18 17.67 Cr.

30-Sep-16 EPC 24.00 Month Completed 30-Nov-16 41.00 Cr.

31-Jul-18 Railway 7.00 Month Completed 31-Jul-18 18.55 Cr.

21-Aug-21 EPC 30.00 Month Completed

EPC Completed
Maintenance Maintenance
Amount of PBG BG Number Type of BG
Period Completion Date

Not Available Not Available Not Available Not Available Not Available

Not Available Not Available Not Available Not Available Not Available

Not Available Not Available Not Available Not Available Not Available

Not Available Not Available Not Available Not Available Not Available

65,00,000.00 11JGT02203560001 Performance


60.00 Month 3-Feb-24
3,25,00,000.00 11JGT02212150001 Bank Guarantee

Performance
48.00 Month 9-Dec-23 9,950,000.00 11JGT02181800001
Bank Guarantee

Performance
120.00 Month 12-May-31 13,500,000.00 11JGT02211390001
Bank Guarantee
Performance
48.00 Month 6-Apr-27 24,225,000.00 002BG01212490002
Bank Guarantee

Not Available Not Available Not Available Not Available Not Available

Performance
48.00 Month 9,675,000.00 11JGT02210650001
Bank Guarantee

1,02,00,000.00 03660100 000792 Performance


36.00 Month 28-Feb-25
1,21,28,026.00 11JGT02211830001 Bank Guarantee

Performance
48.00 Month 12-Dec-25 27,000,000.00 11JGT02203560002
Bank Guarantee

Performance
48.00 Month 13,149,527.00 11JGT02210750002
Bank Guarantee

Not Available Not Available Not Available Not Available Not Available

Performance
48.00 Month 8,991,000.00 11JGT02220630005
Bank Guarantee

Performance
12.00 Month 30-Jun-23 7,882,385.00 002BG01212490001
Bank Guarantee

Performance
12.00 Month 15-Apr-24 4,950,225.00 070BG01212490003
Bank Guarantee
Performance
12.00 Month 31-Aug-23 12,634,118.00 070BG01212490001
Bank Guarantee

37,80,000.00 44650100 000018


Performance
12.00 Month 15-Sep-26 1,90,79,082.00 44650100 000032
Bank Guarantee
1,36,99,090.00 11JGT02193440003

Not Available Not Available Not Available Not Available Not Available

1,04,84,441.00 E33GT02230970005 Performance


36.00 Month 10-Feb-26
45,53,237.00 11JGT02200370003 Bank Guarantee

12.00 Month

Performance
48.00 Month 3,992,388.00 11JGT02210750003
Bank Guarantee

6.00 Month 30-Jun-23

Performance
120.00 Month 12,298,500.00 11JGT02210320001
Bank Guarantee
11,75,00,000.00 44650100 000026 Performance
60.00 Month
7,81,00,000.00 11JGT02221110001 Bank Guarantee

6,00,00,000.00 002BG01212590001 Performance


120.00 Month
14,82,00,000.00 11JGT02212220001 Bank Guarantee

Performance
12.00 Month 8,210,700.00 11JGT02212990001
Bank Guarantee

Performance
180.00 Month 197,400,000.00 1817322BG0000239
Bank Guarantee

Performance
180.00 Month 117,000,000.00 1817322BG0000632
Bank Guarantee

Performance
36.00 Month 11,696,373.00 03660100 000791
Bank Guarantee
Performance
60.00 Month 47,355,000.00 11JGT02230210002
Bank Guarantee

Performance
180.00 Month 207,300,000.00 E33GT02231320002
Bank Guarantee

Performance
36.00 Month 2,019,766.00 E33GT02231150009
Bank Guarantee

Performance
60.00 Month 145,500,000.00 E33GT02231960005
Bank Guarantee

120.00 Month 115,746,000.00 84000050235100000011 PBG

60.00 Month 86,400,000.00 84000050235100000017 PBG

23,70,00,000.00 84000050235100000012 PBG


60.00 Month
3,81,44,000.00 84000050235100000013 A-PBG
9,30,00,000.00 84000050235100000015 PBG
120.00 Month
9,30,00,000.00 84000050235100000016 A-PBG

6.00 Month

30.00 Month 22-Jul-24

3,21,97,500.00 11JGT02201630001
60.00 Month PBG
65,00,000.00 11JGT02210600001

48.00 Month 31-Dec-23 10,800,000.00 11JGT02210650003 PBG

48.00 Month 7-Apr-27 24,225,000.00 002BG01212490002 PBG


60.00 Month 31-May-23
PBG Expiry PBG Claim
Issuance Bank PBG Issue Date PBG Close Date
Date Expiry Date

Not Available Not Available Not Available Not Available Not Available

Not Available Not Available Not Available Not Available Not Available

Not Available Not Available Not Available Not Available Not Available

Not Available Not Available Not Available Not Available Not Available

21-Dec-20 20-Apr-24 20-Apr-25


HDFC Bank Ltd.
03-Aug-21 02-Apr-24 02-Apr-25

HDFC Bank Ltd. 29-Jun-18 27-Jun-20 27-Jun-20

HDFC Bank Ltd. 19-May-21 14-May-24 14-May-25


Yes Bank Ltd. 6-Sep-21 2-Sep-24 2-Sep-25

Not Available Not Available Not Available Not Available Not Available

HDFC Bank Ltd. 6-Mar-21 4-Mar-24 4-Mar-25

Axis Bank Ltd. 29-07-2022


30-Apr-25 30-Apr-26
HDFC Bank Ltd. 02-07-2021

HDFC Bank Ltd. 21-Dec-20 20-Dec-23 19-Dec-24

HDFC Bank Ltd. 16-Mar-21 14-Apr-25 14-Apr-26

Not Available Not Available Not Available Not Available Not Available

HDFC Bank Ltd. 4-Mar-22 2-Mar-24 2-Mar-25

Yes Bank Ltd. 6-Sep-21 30-Jun-23 30-Jun-24 24-Aug-23

Yes Bank Ltd. 6-Sep-21 30-Apr-24 30-Apr-25


Yes Bank Ltd. 6-Sep-21 30-Sep-23 30-Sep-24 13-Sep-23

Axis Bank Ltd. 09-01-2023 05-01-2024 05-01-2025


Axis Bank Ltd. 01-05-2023 27-04-2024 27-04-2025
HDFC Bank Ltd. 10-12-2019 09-03-2026 09-03-2027

Not Available Not Available Not Available Not Available Not Available

07-04-2023 05-04-2024 05-04-2025


HDFC Bank Ltd.
06-02-2020 04-10-2024 04-10-2025

HDFC Bank Ltd. 16-Mar-21 14-Aug-25 14-Aug-26

HDFC Bank Ltd. 1-Feb-21 28-Aug-24 28-Aug-24


Axis Bank Ltd. 07-03-2023 27-02-2025 27-02-2026
HDFC Bank Ltd. 21-04-2022 18-05-2024 18-05-2025

Yes Bank Ltd. 16-09-2021 09-09-2024 09-09-2025


HDFC Bank Ltd. 10-08-2021 06-08-2024 06-08-2025

HDFC Bank Ltd. 26-Oct-21 22-Jan-24 21-Jan-25

State Bank of
20-Apr-22 19-Apr-25 19-Apr-25
India

State Bank of
23-Sep-22 22-Mar-24 22-Sep-24
India

Axis Bank Ltd. 29-Jul-22 25-Jul-24 25-Jul-25


HDFC Bank Ltd. 21-Jan-23 19-Jan-25 19-Jan-26

HDFC Bank Ltd. 12-May-23 9-Dec-24 9-Dec-25

HDFC Bank Ltd. 25-Apr-23 22-Apr-24 22-Apr-25

HDFC Bank Ltd. 15-Jul-23 11-Aug-25 11-Aug-26

The New India


Assurance Co. 21-Mar-24 21-Mar-26
Ltd.

The New India


Assurance Co. 30-Mar-24 29-Mar-26
Ltd.

The New India


Assurance Co. 21-Mar-24 21-Mar-26
Ltd.
The New India
Assurance Co. 30-Mar-24 29-Mar-26
Ltd.

11-06-2020 08-01-2025 08-01-2026


HDFC Bank Ltd.
01-03-2021 25-07-2024 25-07-2025

HDFC Bank Ltd. 6-Mar-21 4-Apr-24 4-Apr-25

Yes Bank Ltd. 6-Sep-21 2-Sep-24 2-Sep-25


7/22/2020
7/21/2024
1460

You might also like