ITP for Lighting Control System Testing and Commissioning
ITP for Lighting Control System Testing and Commissioning
REV. NO.
DATE :
PAGE : 1 OF 1
AREA/LOCATION:
1 DOCUMENTATION
Once (Approval prior to
1.1 Pre-Qualification subcontractor
submit the submittal)
Project specifications and drawings. R H R
1.2 Shop Drawing Approval Each Shop Drawing Project specifications and drawings. H H R
NAME : NAME :
SIGN : SIGN :
DATE: DATE:
PAGE 1 of 1