Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
23 views
SGS Rigging Material
SGS Rigging Material
Uploaded by
Umar Yaqoob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save SGS Rigging Material For Later
Download
Save
Save SGS Rigging Material For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
23 views
SGS Rigging Material
SGS Rigging Material
Uploaded by
Umar Yaqoob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save SGS Rigging Material For Later
Carousel Previous
Carousel Next
Save
Save SGS Rigging Material For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 25
Search
Fullscreen
TRAINING Awareness Training Held at FPCL Karachi On October 25”- 26% 2021 ‘nigh you neeo0 8¢ SURE whe YoU NEED TO BE SURE 10/22/2021S6S COURSE OBJECTIVE A sie and cara se cn pang te service equipment fe and ede ‘omnes Forth pups wrt of opto 38d ew sent ‘fate hemos aa te reiatar ina pofesionl anne + ‘bec lthetistningszean you sul be ale to: ~ herpes oreg geo lng thi spec beets = twine ene tains = Fallow slehanding and age proces ain gorcan bead wor erupmenteres reg ad | ‘oacig bos ae era ines aches cn, oe eaten SES RIGGING or SLINGING enbsroebibienanaennesffigrSt “eine ueSIehsle praeehelnns edna AB bo AVE DP LL pliartabie hte iach eben irre l L201 Rigging or SLinging Pit, Bie TL LL Abs ile nL SNE bitC Go elt eS early ef igasn Lipte ses ined he mes arg Sings tots upended nf, sin ete mos conn Sedpmcctitieensonen Ses SOP's FOR RIGGERS + Aes are obo made for safety of rane & personnel + Make su at crane operator & Magers understand the hand. sonal + Keep your self evar of obstruction within cane rach and work + Make yourself fariar about SW of wie ropes sings and other ng gras +B» cr while ing personnel and fo know the use of saety factor 10 + Singto be chacke for proper hoking wah load {| 1022/2021‘8 50P’s FOR RIGGERS us 209 wh 008 i vt RANGE et es + ees ats sc neameeteanotignifing erento be ce 7 tnt alt ig, posse = on po 1 osteitis 1 ogo cnrsiatto operator os ssettonss het be ed, mustretbe hed sh wept oe cer ad ere eran 9 tod a ye mcm ae nk beg tray ttt te crs coer ha en oon PH oy ‘tone one ale vie har snon a sation Brac. MM 4 Raves = rane orate mms Others ts eran orn wth 9 ak anges | Wnen poping aloud tor tig. kanye hak wal ler foe proper ceentang + Donot ne alow any bay ri on hook or at SES sop’s ror RIGGERS + Mate & cer crane operator, when fad is to be moved and pat + Dom stow ny body 0 tad betwoen ited fad 8 any aon * Mot eon ay bdo and underneath the sir + Tec eae cts cing on in the area and aarst ry pst wtrsaanhazas, + Hany eq 2 0 “Sop and Check seer ooescis) a SOP’s FOR RIGGERS ‘Tha roe rst py hs rer tte, cameron sana. a expan n ‘snboting wa wi happen en toad med Tha eeepc ‘mnt tke ace bare wok tes in anor to emus eon | {Ble snteticentaytom tw nger mat anwar th gseon os 1, hatin be done wen oa? 2 utube tera pat fe odo rach Pe dosed eatin? 5 How wt node st ram a ered eon 4 Hwan haku be mae” 5 Wags a nea parlor he deed ak? 6. Winstone licors a oed (mater occa tes, spe rae, say? 1 Batts have he copsey o hace fe oats arcs ch? 1 foc noona pareve! nwtnd conte tnd stay ame ating 1072272001pe Slaclad Ps rai Vo Soe ella rent Wo Slnclad, r impecpion 7 de Wien. fe Ja Q rat, IS Repuivest P (coun Ac SOP’s FOR RIGGERS : betty Sag [ass] ScHA INE BOS H —27, an S6S ‘SOP’s FOR RIGGERS Resp Competontiavalitiod Personyt0ilos! arin Seh setbsguhbise | rigger Whiess VGN wbachtnll a Wernretise 2 Afineibarlt 5 Moa hi 3 ob § Sobignbnd 1 Papen bight Pope eee os . 2-Day “Shapection Honclacds 77 promtiot fe dik Ciouict : - See, sd) dds 3- "a Pa) Cut PERSONAL PROTECTIVE EQUIPMENT (PPE) Personal pitectve epee he ang safe retenwe vet Fg. 7 = Earand ae protection Fig. 5% 6 y 2 Fig. 182 ose. overs or ches an coca ting eater gov. Fig. 2 84 Np aude nd ey | id Riski2c1 HO PIS ss Safety:* Sees Accident: £36 SrtewnL ee orezre024 Prefersteps | isk assessment Eliminates esl DEEL aS Ail Isubstiturer/(hie LICH aware eMerre been! tsottethe rNBtedmE Ste SibghGGEM contrat” ah fsa] c Rigging 2 1 Kor the iia 2 Know he Conary ATLAS A StI A LIEN foo ede Laide DoLss Four vase ries ioe 99.4 ee Otiggert Sate 3; fants and tu sex} 4 Goel oneness, RSet | seex eetok sett ond ee toate oe Zl a UFTING PLAN aoe 37 + Alifting plan is developed every time a heavy load is, being lifted. The basic idea behind a rigging plan is to have control and establish safety precautions. It is an important planning process that will identify all hazardous situations that might be encountered during lifting. orz2m2021Load Genter of Gravity - CG nee LTE et NPLSEP: § Load Estimation setbbonly wader DCincanheforletranergiCi Gabber Ife Go) “PPh gbiih a OILY 5 Lusi « rs, beth s ate Bethe s aL Shame Ab uplat AL ABT 2Benne | 1 ona to stisig- 05 one 1003-20455 {Secon gine, Using Thumb Rules ari approximately equa to 38 volume ay euata V2vlume eho bos etey round, kgs as per shape shown on ight "teal handing (ones) aunt i | SES Factor of Safety & SWL IS PELE NG 60 Ben L AIFS aE LiAn SLL te ie CLE VEI Wr omih AME eat Mets whe. aS LAF IE Rh BIE (ele ig tle IL LPL ce venue Sad aap PLS hor08 2 kapiph Gea Sate Working Loa netic FSS WWedbIng) Le ne tVialeL FTG (Chains) sorz2r2021 “py nanvil ) 22> —: a Putahi anaes LEE L1iALins,, pete MeO ag aLiadortovoghe Adnan Seana rb beobbey dS (Reach)GlsKe * di 3 3 : ik Bswrp be é aaguhibs Sb ActyLnde § Lyle tI 204d Lend reli yl Be Jimitew * ¢ rore2m021 eee ee SES. Selection Criteria of Wire Rope Slings wen Erne Ld al IL ribet pho fice fie 2 EEE LY 9 ERATE 4 BEZEL 5 KGxLnil 6 ae benteners >cabin te OIEX PR ToRi EE, cht Chsen in, Malm ee LIER PAO Rag wtb bmabncade races a SES Wire Rope . ne Fatt sai yntag Bedi hg Ab 6x37 patti t nee iN geSL nT pur bgate 2 sdeutnankes ar tiigd ES tinlerba 9 geSLn(civre coraphés ¢ eB EM Bedell, PORECORE WRC Fy a fotyvnL yunfyh ire rope core § sia Su tt8RC) Independent eds 2 eLulebrom asonbigw tear tits lh SOR {W 1ONS) = O'X8 (0 12 diameter of rope mm inches) 2x2xb = 22 tone feuude Ay smn C2 gL Je Lasomuidatoniich sn sKsushn S14 2 ses Wire Rope Strength ie 2 0122/2021,Jace” acu” aa Tene ea Webbing Sings orzzi2021i orzare021 i, PERI I Hag POLY Sodgestsiy, abeehag fnieuiyllerbouvanltiat, 5 SLING STORE"lathe, Pie, We an. 45 SUS BI Ph Leva Si bee 20 BLE sorzare021 S&S Sling Load Capacity and Sling Angles E LunMenlitne ge Mactentonitze8981 Ca Ads dyS68 Finding Tension in Sling Leg -1 WAL a a afor:L le 20° al tebe ity SeeemensUea & ear AP Load Angle Factor (LAF) H Example: Load =1.5x500=750 Ibs HSMP AGEL S00 kg it 2/04M Quke * oer al Examples Hitches 2 0| Lint fiswe VOL, betel Le ne | Bede L BLM A LOW Bg Sn ALB ALL ee Lean tios Tensionin sing leg = LAF x H2sd | 3022/2021 2BIE ifn tect “taal bw so eben = 7001 Tension in @=300 bz Flexible or Fig Load Pann wis, Esiwacay oo ae ‘SVL Grade 8 Chain Slings (Tons) = [loo oe ron so sorz2/2021 25\ \ iy ye OX | om ee cee SRP By aoe ; eee a of oiet emt RD f PS enthey Tee te SLUSUE rye ee ag test ty pen MSRM ELI Lily 3 pp EsSoung iSO Ey 6 Safe Use of Shackles verrn wherirbPrede a wahoo ratabdentaht 2 fe Mall wrernas cE Pamtopptinn Lou 3 Tits SsctebunLngig nls lettend ich, + oe “pated 6 awfidertantieb 6 nF regainattinstiyghea h + thee asaiidieg «| A® ON ~ (in - o-0 owt “Rhea LI Let ESAS 2 ELE CHSTG 3 S&S Safe Use of Eye Bots xs ep Pr bse Je» afte SALE » wehhrrondtlérpmeses tug «—! © stforte tin fA eat ALAS 2 sty ishanny& 5 Sere OP 1012212021 Seber 12 Sey GUEL LL Biss TL asor2re021 Fadi Lo INKL ahasighan eee RoR Leith ni oe BrotemL aspire TT S Pfu eat $ i fee Susie Fim sibeatns 2 ~<- Bb 65% <2 1560 ELI Book) LSE ESGD 3 Ip a Slen(l 18% Ee nas achtecbebelie Sees a SéS Inspections - Crane & Lifting Tackle S&S EAE SiS pu ‘SWLTURNBUGKLES: ESAS BE Lia Tum Buces S=0 ; Teranatescan oy fam 1024, ne D-a one eat igh oes Daily or 2 oaks 28350035 EVE or JAW ends. , Monthy 3 Ie oar ich Pet aw Pid 5 eager foe aas 2Discard Wie Rope Sting =f Yaw 8nas Crown ie Breaks piplienautngt Soren eet na en eld Discard Wire Rope Sling - aby -tilay 0722/2021 a1S Double Hast Hest IZoSs ‘Wisk Octomedandercked Vicar Damaged set oeking SS ain Hoist Various Hand Operated Hoists Lever Rope Type Haake Lever hoist a) Chain Hoist 1022/2021© sey cso sloop ction ihelhes ha Levert Ispeton ois ses Operation Panning & Executing 2 Lift high» Abi wFirs8SPYaBl Lhe cot) * At puts at linded Ln Li88 + UL PLL Corsboense ior * (Erie eemasoilemsenSahboh + AL Pre IEE ? LOLA LORE + euiec ee, wna hir toh fi constr Ai Bide PuMbaiiden 2 QZ OQ erates Upper Limit switensbrodd Ce Frere WM SeinvsentsbratD Hoist contre! Broken Ze (te PD REL tLe Reverse Plugging Speed control Mie Shree LSPA GAL De eh FecsaD (tg tine Mg PLES TIERBLIE B S&S, Slinging Hazards eTieWuey sorzzrz024 35+88" SVLL SIE IS tended OF rorzzrz021 ~f bya, £ | (mousing) sure Seth asorzzi2021 Use ropa pull =e ee ‘ t Le Sie rth tt SIA GALI 2 bala Light Sebald 2 wart +_| EAD -untit 6 PS FNLE Sirgen £6 Finishing the Job eB Lge » wi Bo Ef 2 Lh So SEs * PLDSLLS 4 DUZELW S ebFiret 6 UPB RPLS et Giese? weet Aah 0 why 9 29{ s0r222021 Al iS oes ita Coat eased . ses LIFTING & RIGGING OPERATIONS: LIFTING & RIGGING OPERATIONS: 2. Equipment 4. Environment elect 5. Personnel if | 5. Personnel fee ee tT ee ea a ee C a1 i 3, Task 4, Environment 5, Personnel Load Equipment Load Equipment - Task Environment. Personnel S85 serie & RIGGING OPERATIONS Five Components of Rigging 4. Load 2. Equipment 3. Task 4. Environment 5. Personnel LIFTING & RIGGING OPERATIONS Potential Hazards vena powaros ‘Overhead series ines a8 tam, So, wa ephone Unseoundseriss Leven snr si ground ‘er wrk urousingbubdingshessotancte acre trie arizadee nade gng ror22/2021 aSSousiareetoretens straint ats an ne atl Nal [eptevemintoaatdteameyens cons staat weune ee items omen ming nds noe 2 Amastse swoon eee Pomme Oe ea eee sorzere2tjad ‘ se ‘SGS. Safe Operation Guidelines Wan ~Flae geet EBA Sheet 2 ewes 2 ait fitepiley Lah wera Ue ness WPS Fat GLE SP AS 6 eA E death Ein Set g. PLA LAS ELD Pay adic 7 teat Bein$ 9 pears tS KurKipmslelegs » 1072212021 a7
You might also like
Hydraulic Jack Inspection Form: Choose A Type of Inspection
PDF
No ratings yet
Hydraulic Jack Inspection Form: Choose A Type of Inspection
1 page
Handbook For Riggers PDF
PDF
100% (2)
Handbook For Riggers PDF
65 pages
Powerpoint Training q4 2016 Lifting and Rigging
PDF
100% (4)
Powerpoint Training q4 2016 Lifting and Rigging
35 pages
Peabody Rigging Program
PDF
100% (1)
Peabody Rigging Program
36 pages
Welding Alloys USA Inc. Safety Data Sheet: Section 1: Product and Company Identification
PDF
No ratings yet
Welding Alloys USA Inc. Safety Data Sheet: Section 1: Product and Company Identification
9 pages
Rigging Handbook
PDF
No ratings yet
Rigging Handbook
234 pages
Slinging, Rigging & Manual Handling: Prepared By: Masood-Ur-Rehman
PDF
100% (2)
Slinging, Rigging & Manual Handling: Prepared By: Masood-Ur-Rehman
72 pages
SAFE Material Handling
PDF
No ratings yet
SAFE Material Handling
92 pages
Asme B30.9-2006
PDF
No ratings yet
Asme B30.9-2006
74 pages
Rigging & Slinging
PDF
No ratings yet
Rigging & Slinging
66 pages
RIGGING SAFETY Training
PDF
No ratings yet
RIGGING SAFETY Training
43 pages
X550AJ Operation and Safety Manual
PDF
100% (1)
X550AJ Operation and Safety Manual
78 pages
Safe-Rigging Handbook-J G Sankar-Nfl-Nangal Unit
PDF
No ratings yet
Safe-Rigging Handbook-J G Sankar-Nfl-Nangal Unit
28 pages
Rigging
PDF
100% (6)
Rigging
97 pages
Ipt s2
PDF
0% (1)
Ipt s2
719 pages
DOE 1090 Chap11
PDF
No ratings yet
DOE 1090 Chap11
45 pages
Erection Tailing Lift of Precast by Used of Crane
PDF
No ratings yet
Erection Tailing Lift of Precast by Used of Crane
6 pages
Safety Guidelines for Rigging & Sling
PDF
No ratings yet
Safety Guidelines for Rigging & Sling
23 pages
Safe Rigging Handbook
PDF
No ratings yet
Safe Rigging Handbook
30 pages
Basic Rigging
PDF
100% (3)
Basic Rigging
156 pages
A62 Crane Supervisor
PDF
No ratings yet
A62 Crane Supervisor
6 pages
Safe Lifting Book
PDF
No ratings yet
Safe Lifting Book
22 pages
Rigging Awareness Workshop
PDF
No ratings yet
Rigging Awareness Workshop
34 pages
Rigging Safety
PDF
No ratings yet
Rigging Safety
36 pages
Rigging Safety Training Program
PDF
No ratings yet
Rigging Safety Training Program
35 pages
PC130-84
PDF
No ratings yet
PC130-84
10 pages
Lifting Manual
PDF
No ratings yet
Lifting Manual
119 pages
JSA for
PDF
No ratings yet
JSA for
8 pages
Lifting Operations
PDF
100% (1)
Lifting Operations
45 pages
ASME B30.9 Slings - Jan 2010 PDF
PDF
100% (1)
ASME B30.9 Slings - Jan 2010 PDF
80 pages
Hoisting Rigging Fundamentals
PDF
100% (2)
Hoisting Rigging Fundamentals
89 pages
Rigging Techniques
PDF
100% (2)
Rigging Techniques
37 pages
LEEA (New Rigging Manual)
PDF
97% (34)
LEEA (New Rigging Manual)
106 pages
LEEA New Rigging Manual
PDF
100% (1)
LEEA New Rigging Manual
106 pages
Hyster Nova
PDF
No ratings yet
Hyster Nova
473 pages
16 MATERIAL HANDLING - Master
PDF
No ratings yet
16 MATERIAL HANDLING - Master
55 pages
rigging and sling safety guidelines
PDF
No ratings yet
rigging and sling safety guidelines
23 pages
Rigging & Sling Safety Guidelines
PDF
No ratings yet
Rigging & Sling Safety Guidelines
23 pages
Rigging Guide
PDF
100% (2)
Rigging Guide
72 pages
Basic Rigging
PDF
100% (18)
Basic Rigging
156 pages
Rigger
PDF
100% (7)
Rigger
156 pages
Slings-Rigging-and-Lifting-Equipment - 1 - 8
PDF
No ratings yet
Slings-Rigging-and-Lifting-Equipment - 1 - 8
1 page
Basic Rigging Book
PDF
No ratings yet
Basic Rigging Book
156 pages
Specs Wire Rope MPJ - DSR 6x36
PDF
No ratings yet
Specs Wire Rope MPJ - DSR 6x36
3 pages
HoistingRigging Fundamentals (1)
PDF
No ratings yet
HoistingRigging Fundamentals (1)
89 pages
Safe Rigging Practices
PDF
94% (34)
Safe Rigging Practices
86 pages
Rigging and Lifting Safety
PDF
No ratings yet
Rigging and Lifting Safety
70 pages
RLTTTTT
PDF
No ratings yet
RLTTTTT
33 pages
Innhold: User Manual For Steel Wire Slings, Single Leg and Multiple Legs
PDF
No ratings yet
Innhold: User Manual For Steel Wire Slings, Single Leg and Multiple Legs
6 pages
lifting and rigging equipments legislation matrix
PDF
No ratings yet
lifting and rigging equipments legislation matrix
1 page
Asme b30 9 2010 Slings PDF
PDF
No ratings yet
Asme b30 9 2010 Slings PDF
76 pages
Crane Basic Safety
PDF
No ratings yet
Crane Basic Safety
116 pages
RLT
PDF
No ratings yet
RLT
35 pages
Umar Yaqoob Resume
PDF
No ratings yet
Umar Yaqoob Resume
2 pages
Feasibility Report For Production & Supply/Sale of Fly Ash Bricks in Pakistan
PDF
No ratings yet
Feasibility Report For Production & Supply/Sale of Fly Ash Bricks in Pakistan
5 pages
Operations and Electrical Engineers Information: S/No. Name Position Experience (Y) Nationality
PDF
No ratings yet
Operations and Electrical Engineers Information: S/No. Name Position Experience (Y) Nationality
11 pages
Untitled
PDF
No ratings yet
Untitled
28 pages
Repair Parts Sheet Hydraulic Cylinders RD-166 and RD-1610
PDF
No ratings yet
Repair Parts Sheet Hydraulic Cylinders RD-166 and RD-1610
4 pages
Identify Colors Tracing Activity Printable Worksheets
PDF
No ratings yet
Identify Colors Tracing Activity Printable Worksheets
3 pages
AkzoNobel Aerospace QPL 02 21
PDF
No ratings yet
AkzoNobel Aerospace QPL 02 21
168 pages
Operator Instruction Manual - HP350SD, HP550SD, HP1000SD Double Acting Hydraulic Sealed Hand Pumps
PDF
No ratings yet
Operator Instruction Manual - HP350SD, HP550SD, HP1000SD Double Acting Hydraulic Sealed Hand Pumps
20 pages
Circular Mesh: %................ 2nd Ring Element Nodes Pointing Downword
PDF
No ratings yet
Circular Mesh: %................ 2nd Ring Element Nodes Pointing Downword
5 pages
JSA - Repair or Replacement of Coal Shed Sheets
PDF
No ratings yet
JSA - Repair or Replacement of Coal Shed Sheets
1 page