0% found this document useful (0 votes)
23 views

SGS Rigging Material

SGS Rigging Material

Uploaded by

Umar Yaqoob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
23 views

SGS Rigging Material

SGS Rigging Material

Uploaded by

Umar Yaqoob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 25
TRAINING Awareness Training Held at FPCL Karachi On October 25”- 26% 2021 ‘nigh you neeo0 8¢ SURE whe YoU NEED TO BE SURE 10/22/2021 S6S COURSE OBJECTIVE A sie and cara se cn pang te service equipment fe and ede ‘omnes Forth pups wrt of opto 38d ew sent ‘fate hemos aa te reiatar ina pofesionl anne + ‘bec lthetistningszean you sul be ale to: ~ herpes oreg geo lng thi spec beets = twine ene tains = Fallow slehanding and age proces ain gorcan bead wor erupmenteres reg ad | ‘oacig bos ae era ines aches cn, oe eaten SES RIGGING or SLINGING enbsroebibienanaennesffigrSt “eine ueSIehsle praeehelnns edna AB bo AVE DP LL pliartabie hte iach eben irre l L201 Rigging or SLinging Pit, Bie TL LL Abs ile nL SNE bitC Go elt eS early ef igasn Lipte ses ined he mes arg Sings tots upended nf, sin ete mos conn Sedpmcctitieensonen Ses SOP's FOR RIGGERS + Aes are obo made for safety of rane & personnel + Make su at crane operator & Magers understand the hand. sonal + Keep your self evar of obstruction within cane rach and work + Make yourself fariar about SW of wie ropes sings and other ng gras +B» cr while ing personnel and fo know the use of saety factor 10 + Singto be chacke for proper hoking wah load {| 1022/2021 ‘8 50P’s FOR RIGGERS us 209 wh 008 i vt RANGE et es + ees ats sc neameeteanotignifing erento be ce 7 tnt alt ig, posse = on po 1 osteitis 1 ogo cnrsiatto operator os ssettonss het be ed, mustretbe hed sh wept oe cer ad ere eran 9 tod a ye mcm ae nk beg tray ttt te crs coer ha en oon PH oy ‘tone one ale vie har snon a sation Brac. MM 4 Raves = rane orate mms Others ts eran orn wth 9 ak anges | Wnen poping aloud tor tig. kanye hak wal ler foe proper ceentang + Donot ne alow any bay ri on hook or at SES sop’s ror RIGGERS + Mate & cer crane operator, when fad is to be moved and pat + Dom stow ny body 0 tad betwoen ited fad 8 any aon * Mot eon ay bdo and underneath the sir + Tec eae cts cing on in the area and aarst ry pst wtrsaanhazas, + Hany eq 2 0 “Sop and Check seer ooescis) a SOP’s FOR RIGGERS ‘Tha roe rst py hs rer tte, cameron sana. a expan n ‘snboting wa wi happen en toad med Tha eeepc ‘mnt tke ace bare wok tes in anor to emus eon | {Ble snteticentaytom tw nger mat anwar th gseon os 1, hatin be done wen oa? 2 utube tera pat fe odo rach Pe dosed eatin? 5 How wt node st ram a ered eon 4 Hwan haku be mae” 5 Wags a nea parlor he deed ak? 6. Winstone licors a oed (mater occa tes, spe rae, say? 1 Batts have he copsey o hace fe oats arcs ch? 1 foc noona pareve! nwtnd conte tnd stay ame ating 1072272001 pe Slaclad Ps rai Vo Soe ella rent Wo Slnclad, r impecpion 7 de Wien. fe Ja Q rat, IS Repuivest P (coun Ac SOP’s FOR RIGGERS : betty Sag [ass] ScHA INE BOS H —27, an S6S ‘SOP’s FOR RIGGERS Resp Competontiavalitiod Personyt0ilos! arin Seh setbsguhbise | rigger Whiess VGN wbachtnll a Wernretise 2 Afineibarlt 5 Moa hi 3 ob § Sobignbnd 1 Papen bight Pope eee os . 2-Day “Shapection Honclacds 77 promtiot fe dik Ciouict : - See, sd) dds 3- "a Pa) Cut PERSONAL PROTECTIVE EQUIPMENT (PPE) Personal pitectve epee he ang safe retenwe vet Fg. 7 = Earand ae protection Fig. 5% 6 y 2 Fig. 182 ose. overs or ches an coca ting eater gov. Fig. 2 84 Np aude nd ey | id Riski2c1 HO PIS ss Safety:* Sees Accident: £36 SrtewnL ee orezre024 Prefer steps | isk assessment Eliminates esl DEEL aS Ail Isubstiturer/(hie LICH aware eMerre been! tsottethe rNBtedmE Ste SibghGGEM contrat” ah fsa] c Rigging 2 1 Kor the iia 2 Know he Conary ATLAS A StI A LIEN foo ede Laide DoLss Four vase ries ioe 99.4 ee Otiggert Sate 3; fants and tu sex} 4 Goel oneness, RSet | seex eetok sett ond ee toate oe Zl a UFTING PLAN aoe 37 + Alifting plan is developed every time a heavy load is, being lifted. The basic idea behind a rigging plan is to have control and establish safety precautions. It is an important planning process that will identify all hazardous situations that might be encountered during lifting. orz2m2021 Load Genter of Gravity - CG nee LTE et NPLSEP: § Load Estimation setbbonly wader DCincanheforletranergiCi Gabber Ife Go) “PPh gbiih a OILY 5 Lusi « rs, beth s ate Bethe s aL Shame Ab uplat AL ABT 2 Benne | 1 ona to stisig- 05 one 1003-20455 {Secon gine, Using Thumb Rules ari approximately equa to 38 volume ay euata V2vlume eho bos etey round, kgs as per shape shown on ight "teal handing (ones) aunt i | SES Factor of Safety & SWL IS PELE NG 60 Ben L AIFS aE LiAn SLL te ie CLE VEI Wr omih AME eat Mets whe. aS LAF IE Rh BIE (ele ig tle IL LPL ce venue Sad aap PLS hor08 2 kapiph Gea Sate Working Loa netic FSS WWedbIng) Le ne tVialeL FTG (Chains) sorz2r2021 “py n anvil ) 22> —: a Putahi anaes LEE L1iALins,, pete MeO ag aLiadortovoghe Adnan Seana rb beobbey dS (Reach)GlsKe * di 3 3 : ik Bswrp be é aaguhibs Sb ActyLnde § Lyle tI 204d Lend reli yl Be Jimitew * ¢ rore2m021 eee ee SES. Selection Criteria of Wire Rope Slings wen Erne Ld al IL ribet pho fice fie 2 EEE LY 9 ERATE 4 BEZEL 5 KGxLnil 6 ae benteners > cabin te OIEX PR ToRi EE, cht Chsen in, Malm ee LIER PAO Rag wtb bmabncade races a SES Wire Rope . ne Fatt sai yntag Bedi hg Ab 6x37 patti t nee iN geSL nT pur bgate 2 sdeutnankes ar tiigd ES tinlerba 9 geSLn(civre coraphés ¢ eB EM Bedell, PORECORE WRC Fy a fotyvnL yunfyh ire rope core § sia Su tt8RC) Independent eds 2 eLulebrom asonbigw tear tits lh SOR {W 1ONS) = O'X8 (0 12 diameter of rope mm inches) 2x2xb = 22 tone feuude Ay smn C2 gL Je Lasomuidatoniich sn sKsushn S14 2 ses Wire Rope Strength ie 2 0122/2021, Jace” acu” aa Tene ea Webbing Sings orzzi2021 i orzare021 i, PERI I Hag POLY Sodgestsiy, abeehag fnieuiyllerbouvanltiat, 5 SLING STORE "lathe, Pie, We an. 45 SUS BI Ph Leva Si bee 20 BLE sorzare021 S&S Sling Load Capacity and Sling Angles E LunMenlitne ge Mactentonitze8981 Ca Ads dy S68 Finding Tension in Sling Leg -1 WAL a a afor:L le 20° al tebe ity SeeemensUea & ear AP Load Angle Factor (LAF) H Example: Load =1.5x500=750 Ibs HSMP AGEL S00 kg it 2/04M Quke * oer al Examples Hitches 2 0| Lint fiswe VOL, betel Le ne | Bede L BLM A LOW Bg Sn ALB ALL ee Lean tios Tensionin sing leg = LAF x H2sd | 3022/2021 2B IE ifn tect “taal bw so eben = 7001 Tension in @=300 bz Flexible or Fig Load Pann wis, Esiwacay oo ae ‘SVL Grade 8 Chain Slings (Tons) = [loo oe ron so sorz2/2021 25 \ \ iy ye OX | om ee cee SRP By aoe ; eee a of oiet emt RD f PS enthey Tee te SLUSUE rye ee ag test ty pen MSRM ELI Lily 3 pp EsSoung iSO Ey 6 Safe Use of Shackles verrn wherirbPrede a wahoo ratabdentaht 2 fe Mall wrernas cE Pamtopptinn Lou 3 Tits SsctebunLngig nls lettend ich, + oe “pated 6 awfidertantieb 6 nF regainattinstiyghea h + thee asaiidieg «| A® ON ~ (in - o-0 owt “Rhea LI Let ESAS 2 ELE CHSTG 3 S&S Safe Use of Eye Bots xs ep Pr bse Je» afte SALE » wehhrrondtlérpmeses tug «—! © stforte tin fA eat ALAS 2 sty ishanny& 5 Sere OP 1012212021 Seber 12 Sey GUEL LL Biss TL a sor2re021 Fadi Lo INKL ahasighan eee RoR Leith ni oe BrotemL aspire TT S Pfu eat $ i fee Susie Fim sibeatns 2 ~<- Bb 65% <2 1560 ELI Book) LSE ESGD 3 Ip a Slen(l 18% Ee nas achtecbebelie Sees a SéS Inspections - Crane & Lifting Tackle S&S EAE SiS pu ‘SWLTURNBUGKLES: ESAS BE Lia Tum Buces S=0 ; Teranatescan oy fam 1024, ne D-a one eat igh oes Daily or 2 oaks 28350035 EVE or JAW ends. , Monthy 3 Ie oar ich Pet aw Pid 5 eager foe aas 2 Discard Wie Rope Sting =f Yaw 8nas Crown ie Breaks piplienautngt Soren eet na en eld Discard Wire Rope Sling - aby -tilay 0722/2021 a 1S Double Hast Hest IZoSs ‘Wisk Octomedandercked Vicar Damaged set oeking SS ain Hoist Various Hand Operated Hoists Lever Rope Type Haake Lever hoist a) Chain Hoist 1022/2021 © sey cso sloop ction ihelhes ha Levert Ispeton ois ses Operation Panning & Executing 2 Lift high» Abi wFirs8SPYaBl Lhe cot) * At puts at linded Ln Li88 + UL PLL Corsboense ior * (Erie eemasoilemsenSahboh + AL Pre IEE ? LOLA LORE + euiec ee, wna hir toh fi constr Ai Bide PuMbaiiden 2 QZ OQ erates Upper Limit switensbrodd Ce Frere WM SeinvsentsbratD Hoist contre! Broken Ze (te PD REL tLe Reverse Plugging Speed control Mie Shree LSPA GAL De eh FecsaD (tg tine Mg PLES TIERBLIE B S&S, Slinging Hazards eTieWuey sorzzrz024 35 +88" SVLL SIE IS tended OF rorzzrz021 ~f bya, £ | (mousing) sure Seth a sorzzi2021 Use ropa pull =e ee ‘ t Le Sie rth tt SIA GALI 2 bala Light Sebald 2 wart +_| EAD -untit 6 PS FNLE Sirgen £6 Finishing the Job eB Lge » wi Bo Ef 2 Lh So SEs * PLDSLLS 4 DUZELW S ebFiret 6 UPB RPLS et Giese? weet Aah 0 why 9 29 { s0r222021 Al iS oes ita Coat eased . ses LIFTING & RIGGING OPERATIONS: LIFTING & RIGGING OPERATIONS: 2. Equipment 4. Environment elect 5. Personnel if | 5. Personnel fee ee tT ee ea a ee C a 1 i 3, Task 4, Environment 5, Personnel Load Equipment Load Equipment - Task Environment. Personnel S85 serie & RIGGING OPERATIONS Five Components of Rigging 4. Load 2. Equipment 3. Task 4. Environment 5. Personnel LIFTING & RIGGING OPERATIONS Potential Hazards vena powaros ‘Overhead series ines a8 tam, So, wa ephone Unseoundseriss Leven snr si ground ‘er wrk urousingbubdingshessotancte acre trie arizadee nade gng ror22/2021 a SSousiareetoretens straint ats an ne atl Nal [eptevemintoaatdteameyens cons staat weune ee items omen ming nds noe 2 Amastse swoon eee Pomme Oe ea eee sorzere2t jad ‘ se ‘SGS. Safe Operation Guidelines Wan ~Flae geet EBA Sheet 2 ewes 2 ait fitepiley Lah wera Ue ness WPS Fat GLE SP AS 6 eA E death Ein Set g. PLA LAS ELD Pay adic 7 teat Bein$ 9 pears tS KurKipmslelegs » 1072212021 a7

You might also like