Surkhandarya CCGT Power Projec1
Surkhandarya CCGT Power Projec1
Task:
Company/Dept./Division:
HE GONGYE JINHUA JIANSHE Vazifas
Kompaniya/Bo'lim: 公司/部门/部门: PILING WORK Burg’ilash ishlari 打桩工程
i:
Job Safety Analysis (JSA) No: Ish
Date:
xavfsizligi tahlili (JSA) №: 工作安全分析
Sana:
(JSA) 编号:
3. Refueling /Greasing Potential run-off of harmful chemicals used Ensure the use of drip trays under all heavy equipment’s that could
in refuelling and maintenance of the piling rig provided a drip
and equipment affecting the surrounding Make sure field heavy equipment are visually inspected DAILY to identify
ground
any leaks or damage that could cause a leak
Ensure all materials are kept as far away from standing water/flood
-chemicals running into watercourses
water/ rivers as possible to reduce risk of contamination.
resulting in water course pollution.
Spill Kits must be in near vicinity to equipment that has the potential to
-Leaking fuel resulting in harmful pollution
cause a hazardous spill.
Conduct noise monitoring
Heavy noise of machinery can cause Subcontractor should provide Hearing protection while in the specified
4.
General / Pile Boring chronical disease to hearing organs vicinity of the rigs (specified by noise assessments) if noise level above
of 85 db
Only certificated persons must erect The Piling Rig as stated in the
manufacturers manual
Failure of the piling rig or its components An experienced and certified piling rig operative will be the only person
5.
Erecting the Piling Rig resulting in injuries getting trapped in moving permitted to operate the Piling rig.
parts HSE department should inspect valid passport and insurance of pile rig.
The Rig pre-start checklist must be filled out and up to date
Banksman must be present at all times
Competent persons must thoroughly inspect and check Full body
When erecting the sling from piling pipe, the
Harnesses prior to use. Harnesses must be of the correct fit
6. Working at height piling operative could fall from a height and
A restraint double lanyard must be used to restrict the piling operative
cause serious injury and endanger others
from coming too close to the edge of the rig
around them.
When cranes work together, the horizontal distance between them,
their booms, the moving load and moving loads on the boom of one
crane and the boom of another crane should be at least 5 m. The same
distance must be observed when operating cranes with other
mechanisms.
When crane and piling machines working in
The dimensions of the danger zone can be reduced by limiting the
one area may hit each other and cause
7. SIMOPS freedom of movement of the crane or by changing the parameters of its
serious personal injury and property damage
Crane lifting and rebar tighten, Piling working parts (turning angle of the crane boom, length of the
Poor supervision.
movement path along the crane track). , the maximum lifting height of
the load), as well as by installing protective screens at the limits of the
crane's service area.
Full time flagman need to control the cranes, all equipment working in
one area. Full time supervision.
All changes to auger teeth/pins are to be carried out using the following
8. Replacing Teeth and inserting Pins Tungsten may fracture when struck and
equipment; High impact eye protection, copper hammers,
into Auger Heads seriously injure personnel.
All PPE must be worn correctly
9. Boring of pile Operation of Rig Improper operation of the piling Rig could Ensure all personnel operating the piling rig are qualified and deemed
cause severe damage to equipment and competent
injury to personnel Banksman to be clearly visible to Rig operative at all times
Failure of the Piling Rig causing Damage to
Piling rig to be Operated in conjunction with the operator's manual
property or injury
Banksman to be the only person to signal the movement of the
Crushing or making contact with people
Rig
working around Rig
All recently bored and concreted piles are to be covered with hard
Falling down an open or recently concreted
barrication
pile could cause injury.
Open Bore Personnel not involved with piling should be segregated from the piling
10. Machinery toppling over after driving over
mat area.
an open bore
Machine drivers shall backfill the open bore to make them safe at the
end of every day
Piling operatives and/or uncontrolled
personnel under crane lifting radius Operatives must refer to the lift plan before any lifts take place
Failure of lifting gear causing severe injury Piling rig only to lift piling pipes only
Lifting Reinforcement cage
11. Failure of piling rig Causing injury All other lifts are to be carried out by crane
Improper use of lifting gear causing loads to
fall
Damage to nearby equipment and structures
If concrete comes into contact with skin it Provided MSDS for working with concrete to get the correct PPE.
can cause skin burn injuries Provided daily visual inspection for concrete pouring pipes and bucket
Pouring concrete using pipes and If a concrete pipe were to burst, it would Other vehicles and employee do not allowed under the line of fire (Radius
12.
bucket cause severe damage to property, and could of crane)
cause sinjury to personnel
Before Starting the Piling work need to provide hard barricading, signage's
blinking lights for night
A valid night work permit issued by authorised personnel.
Undertake effective daily Pre-start briefing before conducting works.
Extended Hours/ Night Work Insufficient Illumination
Obtain signatures and forward copies to the HSE department at the end of
13. Slipping, tripping hazards due to poor
the shift.
illumination and material managemnet
Provide adequate illumination for the work area & work access.
If using a tower light, it must be inspected and should always be properly
grounded.
SAFETY EQUIPMENT REQUIRED TO DO THIS JOB BU ISHNI BAJARISH UCHUN XAVFSIZLIK USKUNALARI KERAK 这项工作需要安全设备
Hard Hats? Hearing Protection? Barricades Other (List):
Ximoya kaskalari? Eshitish himoyasi? Tosiqlar Boshqa (ro'yxat):
安安全帽?全帽? 听力保护? 路障 其他(列表)
Safety Shoes Xavfsizlik Work Vests? Fire Extinguisher
poyabzali Havfsizlik jiletlari Yong'in o'chirish HSE Orientation and work at height Training.
安全鞋 工作背心? moslamasi HSE yo'nalishi va balandlikda ishlash bo'yicha trening
Safety Goggles? Xavfsiz Safety Harness? 灭火器 HSE 指导和高空作业培训
ko'zoynaklarmi? Xavfsizlik kamarmi? Lock-Out Tag Out
安全护目镜? 安全带? Yesich qulfi
Face Shield? 上锁挂牌
Yuz qimoyasi/ 面罩? Cotton Gloves Hot Work Permit?
Leather Gloves? Charm Paxta qo'lqoplar Issiq ish ruxsat?
qo'lqopmi? 棉手套 动火作业许可证?
皮手套? Entry Permit? Kirish
ruxsatnomasi?
入境许可?
DATE:
ADOPTED BY (SUPERVISOR) Sana:
TOMONIDAN QABUL OLGAN
日期
(SUPERVIZOR) 由(主管)采纳
DATE:
REVIEWED BY (HGJJ HSE DEP) Sana:
ko'rib chiqildi (HGJJ HSE DEP) 日期