0% found this document useful (0 votes)
15 views2 pages

Checklist for Water Bound Macadam

Uploaded by

shyammistry37
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views2 pages

Checklist for Water Bound Macadam

Uploaded by

shyammistry37
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

ACTIVITY CHECKLISTS

Date :
Checklist for Water Bound Macadam
WIR No. :
Project :
Dwg Name :
Zone/Stretch Location :
Dwg No. & Revision :

Status (Tick mark on applicable


SL. cell)
No.
Checking Points Comments

Yes No NA

General items checklist Where applicable to this section.

1 Shop drawing/working drawings available


2 Method Statement available
3 MAR/MIR available

Are the lay out plan, grade & subgrade sections cross checked
4 with drawings before Spreading of aggregates?

5 Has the subgrade been prepared as per the given camber?

Are the undulations/irregularities been rectified before


6
aggregates spreading?
Has the aggregates been spread for uniform thickness in first
7
layer?
8 Is dry rolling ensured for the first layer?
Screenings & binding materials are spread evenly as per the
9
specifications?
10 Water sprinkling been done over the aggregates?
11 Is wet rolling carried out over that?
Have the aggregates compacted properly & required slope been
12
obtained?
13 Dust control managed
14 Relevant PPEs
15 Proper Housekeeping is done?

829838307.xlsx Page 1
ACTIVITY CHECKLISTS

Project-Specific Items:

Comments:

Vendor Name:
Date:
Vendor Rep Signature :

Inspected. OK to proceed.
Date:
SYN Rep: