0% found this document useful (0 votes)
18 views

Pressurization Calc

Uploaded by

Ruban Raj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

Pressurization Calc

Uploaded by

Ruban Raj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 11

Project DIGITAL EDGE Page Number 1

Revision R0
Area Of Project Mumbai Prepared by B.S
Date 05.07.24
Element Description Valet Lift Lobby Pressurisation Calculation GF to LEVEL-07 Checked by BK
Date 05.07.24

Input Output Calculated

Wall Leakage Wall Lekage Floor Floor/Ceili ng Door Leakage Based Total Factor of Factored Required Airflow Airflow
Factor area/floor Leakage Leakage Area on 2 mm Gaps Leakage Safety On Leakage Pressure Through Through
Slab To Slab Factor Area Leakage Area Differential Leakage (Ql) Open Doors Total Required Airflow
Item Floor Area Perimeter
Height Area (Qod) Qt=Ql+Qod

Units m2 m m A/AW m2 A/AF m2 m2 m2 m2 Pa m3/s m3/s m3/s CFM

53.0 36.0 6.5 0.00011 0.005 0.000052 0.003 0.031 0.039 0% 0.039 25 0.160 2.02 2.18 4611

Velocity m/s 0.75 Selected Fan Capacity 5000 CFM


No. of doors open 1 Selected Fan QTY 1 No
Airflow Through 2.016
Open Doors m3/s
Leakage Through 0.031 Invreco Selected Fan 5000 CFM
Closed Doors m3/s Capacity
Selected Fan QTY 1 No

Door Schedule
Parameter Single Leaf Door Double Leaf Door
Size 1.2m (W) 2.4m (H) 1.8m (W) 2.4m (H)
No. of Closed Doors Per floor
0 1

No. of Open Doors 0 1


Velocity Through
Open Doors 0.75 m/s

Data from BS 5588 Part 4


Table 3 - Typical leakage areas for four types of door

Crack Leakage
Type of door Size Door Size Leakage
length(m) area(m2)
Type of Door Door area (m2) Crack length (m) area
m2
Single - leaf in rebated frame 2 m high 5.6 0.01
opening 800mm wide Height Width
into a pressurized space
Single - leaf in rebated frame 2 m high 5.6 0.02 Double Leaf
opening 800mm wide 2.4 1.12 2.7 9.4 0.031
Door
outwards from a pressurized
Double-leafspace
with or without 2 m high 9.2 0.03
centre 1.6m wide
2 m high
Lift landing door (see 5.3.2.3) 8.0 0.06
2m wide
Project DIGITAL EDGE Page Number 1
Revision R0
Area Of Project Mumbai Prepared by B.S
Date 05.07.24
Element Description Valet Lift Lobby Pressurisation Calculation GF to LEVEL-07 Checked by BK
Date 05.07.24

Input Output Calculated

Wall Leakage Wall Lekage Floor Floor/Ceili ng Door Leakage Based Total Factor of Factored Required Airflow Airflow
Factor area/floor Leakage Leakage Area on 2 mm Gaps Leakage Safety On Leakage Pressure Through Through
Slab To Slab Factor Area Leakage Area Differential Leakage (Ql) Open Doors Total Required Airflow
Item Floor Area Perimeter
Height Area (Qod) Qt=Ql+Qod

Units m2 m m A/AW m2 A/AF m2 m2 m2 m2 Pa m3/s m3/s m3/s CFM

11.0 14.0 6.5 0.00011 0.005 0.000052 0.001 0.029 0.035 0% 0.035 25 0.145 1.62 1.76 3740

Velocity m/s 0.75 Selected Fan Capacity 0 CFM


No. of doors open 1 Selected Fan QTY 1 No
Airflow Through 1.62
Open Doors m3/s
Leakage Through 0.029 Invreco Selected Fan 4000 CFM
Closed Doors m3/s Capacity
Selected Fan QTY 1 No

Door Schedule
Parameter Single Leaf Door Double Leaf Door
Size 1.2m (W) 2.4m (H) 1.8m (W) 2.4m (H)
No. of Closed Doors Per floor
0 1

No. of Open Doors 0 1


Velocity Through
Open Doors 0.75 m/s

Data from BS 5588 Part 4


Table 3 - Typical leakage areas for four types of door

Crack Leakage
Type of door Size Door Size Leakage
length(m) area(m2)
Type of Door Door area (m2) Crack length (m) area
m2
Single - leaf in rebated frame 2 m high 5.6 0.01
opening 800mm wide Height Width
into a pressurized space
Single - leaf in rebated frame 2 m high 5.6 0.02 Double Leaf
opening 800mm wide 2.4 0.9 2.2 9.0 0.029
Door
outwards from a pressurized
Double-leafspace
with or without 2 m high 9.2 0.03
centre 1.6m wide
2 m high
Lift landing door (see 5.3.2.3) 8.0 0.06
2m wide
Project Provenance Land, commercial Tower (B4+G+P10+29F). Page Number 1
Revision R0
Area Of Project Mumbai Prepared by GSRJ
Date 05.07.23
Element Description Valet LiftWell Pressurization B4-P10 Checked by BK
Date 05.07.23
Input Output Calculated

Door Leakage Total Leakage Area / Floor dP At Bottom


Wall Area Per Floor Wall Leakage Factor Based on 2 mm Gaps Temp Differential dP at Top

Parameter A
lsb A
lbo A/Awsb A/Awbo A
dsb A
sb A
bo To Ts y Ql Q
od Qt=Ql+Qod Q +10%Q
Liftwell ΔP
sbb B B ΔP
sbt
Perimeter Number Of
Building Floors Airflow Due To Airflow Through Total Required Total Required Airflow
Detail Liftwell Building Exterior Liftwell Lift Doors Liftwell Building Exterior Outside Temp. Shaft Temp. Liftwell Height
Exterior Leakage Open Doors Airflow With Safety Factor

Units m m 2 m 2 m 2 m 2 m 2 Pa K K Pa/m Pa/m m Pa m3/s m3/s m3/s m3/s CFM

Tag Basement
Summer
15.00 97.5 2307.5 0.00084 0.00017 0.0653 0.08190 0.392 12.5 308.8 303.8 7 -0.18 0.1844 53 21.1 3.53034 3.78 7.31 8.04 17039
Winter
15.00 97.5 2307.5 0.00084 0.00017 0.0653 0.08190 0.392 12.5 304.2 309.2 7 0.18 0.1839 53 21.1 3.52920 3.78 7.31 8.04 17036

Lift Perimeter in m 9.6 Velocity m/s 0.75 Per liftwell required Air flow 17100 CFM
Building Perimeter in m 355 No. of doors open 2 No.of Liftwell 1 Nos
Airflow Through 3.78 Selected Fan Capacity 17100 CFM
Building Height in m 53.2 Open Doors m3/s
Number of Floor 7 Total No.of Fan QTY 1 Nos
Each Floor Height avg 6.50

Door Schedule
Parameter Single Leaf Door Double Leaf Door
Size 1.1m (W) 2.1m (H) 1.8m (W) 2.4m (H)
No. of Closed Doors Per floor 0 1
No. of Open Doors 0 0
Velocity Through
Open Doors 0.75 m/s

Data from BS 5588 Part 4


Table 3 - Typical leakage areas for four types of door
Crack
Type of door Size Leakage area(m2) Door Size
length(m) Leakage area
Type of Door Door area (m2) Crack length (m)
Single - leaf in rebated frame opening 2 m high 5.6 0.01 m2
into a pressurized space 800mm wide Height Width

Single - leaf in rebated frame opening 2 m high 800mm 5.6 0.02


outwards from a pressurized space wide Single Leaf Door 2.1 1.2 2.5 8.7 0.065

Double-leaf with or without centre 2 m high 9.2 0.03


Lift landing rebate
door (see 5.3.2.3) 1.6m wide
2 m high 8.0 0.06
2m wide
Project Provenance Land, commercial Tower (B4+G+P10+29F). Page Number 1
Revision R0
Area Of Project Mumbai Prepared by GSRJ
Date 05.07.23
Element Description Valet LiftWell Pressurization B4-P10 Checked by BK
Date 05.07.23
Input Output Calculated

Door Leakage Total Leakage Area / Floor dP At Bottom


Wall Area Per Floor Wall Leakage Factor Based on 2 mm Gaps Temp Differential dP at Top

Parameter A
lsb A
lbo A/Awsb A/Awbo A
dsb A
sb A
bo To Ts y Ql Q
od Qt=Ql+Qod Q +10%Q
Liftwell ΔP
sbb B B ΔP
sbt
Perimeter Number Of
Building Floors Airflow Due To Airflow Through Total Required Total Required Airflow
Detail Liftwell Building Exterior Liftwell Lift Doors Liftwell Building Exterior Outside Temp. Shaft Temp. Liftwell Height
Exterior Leakage Open Doors Airflow With Safety Factor

Units m m 2 m 2 m 2 m 2 m 2 Pa K K Pa/m Pa/m m Pa m3/s m3/s m3/s m3/s CFM

Tag Basement
Summer
15.00 97.5 2307.5 0.00084 0.00017 0.0653 0.08190 0.392 12.5 308.8 303.8 7 -0.18 0.1844 53 21.1 3.53034 3.78 7.31 8.04 17039
Winter
15.00 97.5 2307.5 0.00084 0.00017 0.0653 0.08190 0.392 12.5 304.2 309.2 7 0.18 0.1839 53 21.1 3.52920 3.78 7.31 8.04 17036

Lift Perimeter in m 9.6 Velocity m/s 0.75 Per liftwell required Air flow 17100 CFM
Building Perimeter in m 355 No. of doors open 2 No.of Liftwell 1 Nos
Airflow Through 3.78 Selected Fan Capacity 17100 CFM
Building Height in m 53.2 Open Doors m3/s
Number of Floor 7 Total No.of Fan QTY 1 Nos
Each Floor Height avg 6.50

Door Schedule
Parameter Single Leaf Door Double Leaf Door
Size 1.1m (W) 2.1m (H) 1.8m (W) 2.4m (H)
No. of Closed Doors Per floor 0 1
No. of Open Doors 0 0
Velocity Through
Open Doors 0.75 m/s

Data from BS 5588 Part 4


Table 3 - Typical leakage areas for four types of door
Crack
Type of door Size Leakage area(m2) Door Size
length(m) Leakage area
Type of Door Door area (m2) Crack length (m)
Single - leaf in rebated frame opening 2 m high 5.6 0.01 m2
into a pressurized space 800mm wide Height Width

Single - leaf in rebated frame opening 2 m high 800mm 5.6 0.02


outwards from a pressurized space wide Single Leaf Door 2.1 1.2 2.5 8.7 0.065

Double-leaf with or without centre 2 m high 9.2 0.03


Lift landing rebate
door (see 5.3.2.3) 1.6m wide
2 m high 8.0 0.06
2m wide
Project Provenance Land, commercial Tower (B4+G+P10+29F). Page Number 1
Revision R0
Area Of Project Mumbai Prepared by GSRJ
Date 05.07.23
Element Description Valet LiftWell Pressurization B4-P10 Checked by BK
Date 05.07.23
Input Output Calculated

Door Leakage Total Leakage Area / Floor dP At Bottom


Wall Area Per Floor Wall Leakage Factor Based on 2 mm Gaps Temp Differential dP at Top

Parameter A
lsb A
lbo A/Awsb A/Awbo A
dsb A
sb A
bo To Ts y Ql Q
od Qt=Ql+Qod Q +10%Q
Liftwell ΔP
sbb B B ΔP
sbt
Perimeter Number Of
Building Floors Airflow Due To Airflow Through Total Required Total Required Airflow
Detail Liftwell Building Exterior Liftwell Lift Doors Liftwell Building Exterior Outside Temp. Shaft Temp. Liftwell Height
Exterior Leakage Open Doors Airflow With Safety Factor

Units m m 2 m 2 m 2 m 2 m 2 Pa K K Pa/m Pa/m m Pa m3/s m3/s m3/s m3/s CFM

Tag Basement
Summer
9.30 60.5 2307.5 0.00084 0.00017 0.0717 0.05078 0.392 12.5 308.8 303.8 7 -0.18 0.1844 53 21.4 2.95271 5.13 8.09 8.90 18850
Winter
9.30 60.5 2307.5 0.00084 0.00017 0.0717 0.05078 0.392 12.5 304.2 309.2 7 0.18 0.1839 53 21.4 2.95173 5.13 8.09 8.89 18847

Lift Perimeter in m 9.6 Velocity m/s 0.75 Per liftwell required Air flow 18900 CFM
Building Perimeter in m 355 No. of doors open 2 No.of Liftwell 1 Nos
Airflow Through 5.1345 Selected Fan Capacity 18900 CFM
Building Height in m 53.2 Open Doors m3/s
Number of Floor 7 Total No.of Fan QTY 1 Nos
Each Floor Height avg 6.50

Door Schedule
Parameter Single Leaf Door Double Leaf Door
Size 1.1m (W) 2.1m (H) 1.8m (W) 2.4m (H)
No. of Closed Doors Per floor 0 1
No. of Open Doors 0 0
Velocity Through
Open Doors 0.75 m/s

Data from BS 5588 Part 4


Table 3 - Typical leakage areas for four types of door
Crack
Type of door Size Leakage area(m2) Door Size
length(m) Leakage area
Type of Door Door area (m2) Crack length (m)
Single - leaf in rebated frame opening 2 m high 5.6 0.01 m2
into a pressurized space 800mm wide Height Width

Single - leaf in rebated frame opening 2 m high 800mm 5.6 0.02


outwards from a pressurized space wide Single Leaf Door 2.1 1.6 3.4 9.6 0.072

Double-leaf with or without centre 2 m high 9.2 0.03


Lift landing rebate
door (see 5.3.2.3) 1.6m wide
2 m high 8.0 0.06
2m wide
Project Provenance Land, commercial Tower (B4+G+P10+29F). Page Number 1
Revision R0
Area Of Project Mumbai Prepared by GSRJ
Date 05.07.23
Element Description Basement Staircase Pressurization (B4-B1 Mezz) Checked by BK
Date 05.07.23
Input Output Calculated

Door Leakage Total Leakage Area / Floor dP At Bottom


Wall Area Per Floor Wall Leakage Factor Based on 2 mm Gaps Temp Differential dP at Top

Parameter A
lsb A
lbo A/Awsb A/Awbo A
dsb A
sb A
bo To Ts y Ql Q
od Qt=Ql+Qod Q +10%Q
Staircase ΔP
sbb B B ΔP
sbt
Perimeter Number Of
Building Floors Airflow Due To Airflow Through Total Required Total Required Airflow
Detail Staircase Building Exterior Staircase Stair Doors Staircase Building Exterior Outside Temp. Shaft Temp. Stairwell Height
Exterior Leakage Open Doors Airflow With Safety Factor

Units m m 2 m 2 m 2 m 2 m 2 Pa K K Pa/m Pa/m m Pa m3/s m3/s m3/s m3/s CFM

Tag Basement
Summer 35.99 233.9 1202.5 0.00011 0.00017 0.0126 0.02573 0.204 12.5 308.8 303.8 7 -0.18 0.1844 53 22.0 0.93049 2.02 2.95 3.24 6868
Winter 35.99 233.9 1202.5 0.00011 0.00017 0.0126 0.02573 0.204 12.5 304.2 309.2 7 0.18 0.1839 53 22.0 0.93017 2.02 2.95 3.24 6867

Stair Perimeter in m 35.99 Velocity m/s 0.75 Selected Fan Capacity 7000 CFM
Building Perimeter in m 185 No. of doors open 1 No.of staircase 1 No
Airflow Through 2.016 total No.of Fan QTY
Building Height in m 53.2 Open Doors m3/s 1 No

Leakage Through 0.013


Number of Floor 7 Closed Doors m3/s
Each Floor Height avg 6.50

Door Schedule
Parameter Single Leaf Door Double Leaf Door
Size 1.2m (W) 2.4m (H) 1.8m (W) 2.4m (H)
No. of Closed Doors Per floor 1
No. of Open Doors 2
Velocity Through
Open Doors 0.75 m/s

Data from BS 5588 Part 4


Table 3 - Typical leakage areas for four types of door
Crack
Type of door Size Leakage area(m2) Door Size
length(m) Leakage area
Type of Door Door area (m2) Crack length (m)
Single - leaf in rebated frame opening 2 m high 5.6 0.01 m2
into a pressurized space 800mm wide Height Width

Single - leaf in rebated frame opening 2 m high 800mm 5.6 0.02


outwards from a pressurized space wide Single Leaf Door 2.4 1.12 2.7 7.0 0.013

Double-leaf with or without centre 2 m high 9.2 0.03


Lift landing rebate
door (see 5.3.2.3) 1.6m wide
2 m high 8.0 0.06
2m wide
Project Provenance Land, commercial Tower (B4+G+P10+29F). Page Number 1
Revision R0
Area Of Project Mumbai Prepared by GSRJ
Date 05.07.23
Element Description Basement Staircase Pressurization (B4-B1 Mezz) Checked by BK
Date 05.07.23
Input Output Calculated

Door Leakage Total Leakage Area / Floor dP At Bottom


Wall Area Per Floor Wall Leakage Factor Based on 2 mm Gaps Temp Differential dP at Top

Parameter A
lsb A
lbo A/Awsb A/Awbo A
dsb A
sb A
bo To Ts y Ql Q
od Qt=Ql+Qod Q +10%Q
Staircase ΔP
sbb B B ΔP
sbt
Perimeter Number Of
Building Floors Airflow Due To Airflow Through Total Required Total Required Airflow
Detail Staircase Building Exterior Staircase Stair Doors Staircase Building Exterior Outside Temp. Shaft Temp. Stairwell Height
Exterior Leakage Open Doors Airflow With Safety Factor

Units m m 2 m 2 m 2 m 2 m 2 Pa K K Pa/m Pa/m m Pa m3/s m3/s m3/s m3/s CFM

Tag Basement
Summer 23.75 154.4 2307.5 0.00011 0.00017 0.0126 0.01698 0.392 12.5 308.8 303.8 7 -0.18 0.1844 53 22.3 0.72068 2.02 2.74 3.01 6379
Winter 23.75 154.4 2307.5 0.00011 0.00017 0.0126 0.01698 0.392 12.5 304.2 309.2 7 0.18 0.1839 53 22.2 0.72043 2.02 2.74 3.01 6378

Stair Perimeter in m 23.75 Velocity m/s 0.75 Selected Fan Capacity 6500 CFM
Building Perimeter in m 355 No. of doors open 1 No.of staircase 1 No
Airflow Through 2.016 total No.of Fan QTY
Building Height in m 53.2 Open Doors m3/s 1 No

Leakage Through 0.013


Number of Floor 7 Closed Doors m3/s
Each Floor Height avg 6.50

Door Schedule
Parameter Single Leaf Door Double Leaf Door
Size 1.2m (W) 2.4m (H) 1.8m (W) 2.4m (H)
No. of Closed Doors Per floor 1
No. of Open Doors 1
Velocity Through
Open Doors 0.75 m/s

Data from BS 5588 Part 4


Table 3 - Typical leakage areas for four types of door
Crack
Type of door Size Leakage area(m2) Door Size
length(m) Leakage area
Type of Door Door area (m2) Crack length (m)
Single - leaf in rebated frame opening 2 m high 5.6 0.01 m2
into a pressurized space 800mm wide Height Width

Single - leaf in rebated frame opening 2 m high 800mm 5.6 0.02


outwards from a pressurized space wide Single Leaf Door 2.4 1.12 2.7 7.0 0.013

Double-leaf with or without centre 2 m high 9.2 0.03


Lift landing rebate
door (see 5.3.2.3) 1.6m wide
2 m high 8.0 0.06
2m wide
Project Provenance Land, commercial Tower (B4+G+P10+29F). Page Number 1
Revision R0
Area Of Project Mumbai Prepared by GSRJ
Date 05.07.23
Element Description Basement Staircase Pressurization (B4-B1 Mezz) Checked by BK
Date 05.07.23
Input Output Calculated

Door Leakage Total Leakage Area / Floor dP At Bottom


Wall Area Per Floor Wall Leakage Factor Based on 2 mm Gaps Temp Differential dP at Top

Parameter A
lsb A
lbo A/Awsb A/Awbo A
dsb A
sb A
bo To Ts y Ql Q
od Qt=Ql+Qod Q +10%Q
Staircase ΔP
sbb B B ΔP
sbt
Perimeter Number Of
Building Floors Airflow Due To Airflow Through Total Required Total Required Airflow
Detail Staircase Building Exterior Staircase Stair Doors Staircase Building Exterior Outside Temp. Shaft Temp. Stairwell Height
Exterior Leakage Open Doors Airflow With Safety Factor

Units m m 2 m 2 m 2 m 2 m 2 Pa K K Pa/m Pa/m m Pa m3/s m3/s m3/s m3/s CFM

Tag Basement
Summer 23.75 154.4 2307.5 0.00011 0.00017 0.0126 0.01698 0.392 12.5 308.8 303.8 7 -0.18 0.1844 53 22.3 0.72068 2.02 2.74 3.01 6379
Winter 23.75 154.4 2307.5 0.00011 0.00017 0.0126 0.01698 0.392 12.5 304.2 309.2 7 0.18 0.1839 53 22.2 0.72043 2.02 2.74 3.01 6378

Stair Perimeter in m 23.75 Velocity m/s 0.75 Selected Fan Capacity 6500 CFM
Building Perimeter in m 355 No. of doors open 1 No.of staircase 1 No
Airflow Through 2.016 total No.of Fan QTY
Building Height in m 53.2 Open Doors m3/s 1 No

Leakage Through 0.013


Number of Floor 7 Closed Doors m3/s
Each Floor Height avg 6.50

Door Schedule
Parameter Single Leaf Door Double Leaf Door
Size 1.2m (W) 2.4m (H) 1.8m (W) 2.4m (H)
No. of Closed Doors Per floor 1
No. of Open Doors 1
Velocity Through
Open Doors 0.75 m/s

Data from BS 5588 Part 4


Table 3 - Typical leakage areas for four types of door
Crack
Type of door Size Leakage area(m2) Door Size
length(m) Leakage area
Type of Door Door area (m2) Crack length (m)
Single - leaf in rebated frame opening 2 m high 5.6 0.01 m2
into a pressurized space 800mm wide Height Width

Single - leaf in rebated frame opening 2 m high 800mm 5.6 0.02


outwards from a pressurized space wide Single Leaf Door 2.4 1.12 2.7 7.0 0.013

Double-leaf with or without centre 2 m high 9.2 0.03


Lift landing rebate
door (see 5.3.2.3) 1.6m wide
2 m high 8.0 0.06
2m wide
Project Provenance Land, commercial Tower (B4+G+P10+29F). Page Number 1
Revision R0
Area Of Project Mumbai Prepared by GSRJ
Date 05.07.23
Element Description Basement Staircase Pressurization (B4-B1 Mezz) Checked by BK
Date 05.07.23
Input Output Calculated

Door Leakage Total Leakage Area / Floor dP At Bottom


Wall Area Per Floor Wall Leakage Factor Based on 2 mm Gaps Temp Differential dP at Top

Parameter A
lsb A
lbo A/Awsb A/Awbo A
dsb A
sb A
bo To Ts y Ql Q
od Qt=Ql+Qod Q +10%Q
Staircase ΔP
sbb B B ΔP
sbt
Perimeter Number Of
Building Floors Airflow Due To Airflow Through Total Required Total Required Airflow
Detail Staircase Building Exterior Staircase Stair Doors Staircase Building Exterior Outside Temp. Shaft Temp. Stairwell Height
Exterior Leakage Open Doors Airflow With Safety Factor

Units m m 2 m 2 m 2 m 2 m 2 Pa K K Pa/m Pa/m m Pa m3/s m3/s m3/s m3/s CFM

Tag Basement
Summer 23.75 154.4 2307.5 0.00011 0.00017 0.0126 0.01698 0.392 12.5 308.8 303.8 7 -0.18 0.1844 53 22.3 0.72068 2.02 2.74 3.01 6379
Winter 23.75 154.4 2307.5 0.00011 0.00017 0.0126 0.01698 0.392 12.5 304.2 309.2 7 0.18 0.1839 53 22.2 0.72043 2.02 2.74 3.01 6378

Stair Perimeter in m 23.75 Velocity m/s 0.75 Selected Fan Capacity 6500 CFM
Building Perimeter in m 355 No. of doors open 1 No.of staircase 1 No
Airflow Through 2.016 total No.of Fan QTY
Building Height in m 53.2 Open Doors m3/s 1 No

Leakage Through 0.013


Number of Floor 7 Closed Doors m3/s
Each Floor Height avg 6.50

Door Schedule
Parameter Single Leaf Door Double Leaf Door
Size 1.2m (W) 2.4m (H) 1.8m (W) 2.4m (H)
No. of Closed Doors Per floor 1
No. of Open Doors 1
Velocity Through
Open Doors 0.75 m/s

Data from BS 5588 Part 4


Table 3 - Typical leakage areas for four types of door
Crack
Type of door Size Leakage area(m2) Door Size
length(m) Leakage area
Type of Door Door area (m2) Crack length (m)
Single - leaf in rebated frame opening 2 m high 5.6 0.01 m2
into a pressurized space 800mm wide Height Width

Single - leaf in rebated frame opening 2 m high 800mm 5.6 0.02


outwards from a pressurized space wide Single Leaf Door 2.4 1.12 2.7 7.0 0.013

Double-leaf with or without centre 2 m high 9.2 0.03


Lift landing rebate
door (see 5.3.2.3) 1.6m wide
2 m high 8.0 0.06
2m wide
Project Provenance Land, commercial Tower (B4+G+P10+29F). Page Number 1
Revision R0
Area Of Project Mumbai Prepared by GSRJ
Date 05.07.23
Element Description Basement Staircase Pressurization (B4-B1 Mezz) Checked by BK
Date 05.07.23
Input Output Calculated

Door Leakage Total Leakage Area / Floor dP At Bottom


Wall Area Per Floor Wall Leakage Factor Based on 2 mm Gaps Temp Differential dP at Top

Parameter A
lsb A
lbo A/Awsb A/Awbo A
dsb A
sb A
bo To Ts y Ql Q
od Qt=Ql+Qod Q +10%Q
Staircase ΔP
sbb B B ΔP
sbt
Perimeter Number Of
Building Floors Airflow Due To Airflow Through Total Required Total Required Airflow
Detail Staircase Building Exterior Staircase Stair Doors Staircase Building Exterior Outside Temp. Shaft Temp. Stairwell Height
Exterior Leakage Open Doors Airflow With Safety Factor

Units m m 2 m 2 m 2 m 2 m 2 Pa K K Pa/m Pa/m m Pa m3/s m3/s m3/s m3/s CFM

Tag Basement
Summer 23.75 154.4 2307.5 0.00011 0.00017 0.0119 0.01698 0.392 12.5 308.8 303.8 7 -0.18 0.1844 53 22.3 0.70329 3.31 4.02 4.42 9359
Winter 23.75 154.4 2307.5 0.00011 0.00017 0.0119 0.01698 0.392 12.5 304.2 309.2 7 0.18 0.1839 53 22.2 0.70304 3.31 4.02 4.42 9358

Stair Perimeter in m 23.75 Velocity m/s 0.75 Selected Fan Capacity 9500 CFM
Building Perimeter in m 355 No. of doors open 2 No.of staircase 1 No
Airflow Through 3.312 total No.of Fan QTY
Building Height in m 53.2 Open Doors m3/s 1 No

Leakage Through 0.012


Number of Floor 7 Closed Doors m3/s
Each Floor Height avg 6.50

Door Schedule
Parameter Single Leaf Door Double Leaf Door
Size 1.2m (W) 2.4m (H) 1.8m (W) 2.4m (H)
No. of Closed Doors Per floor 1
No. of Open Doors 2
Velocity Through
Open Doors 0.75 m/s

Data from BS 5588 Part 4


Table 3 - Typical leakage areas for four types of door
Crack
Type of door Size Leakage area(m2) Door Size
length(m) Leakage area
Type of Door Door area (m2) Crack length (m)
Single - leaf in rebated frame opening 2 m high 5.6 0.01 m2
into a pressurized space 800mm wide Height Width

Single - leaf in rebated frame opening 2 m high 800mm 5.6 0.02


outwards from a pressurized space wide Single Leaf Door 2.4 0.92 2.2 6.6 0.012

Double-leaf with or without centre 2 m high 9.2 0.03


Lift landing rebate
door (see 5.3.2.3) 1.6m wide
2 m high 8.0 0.06
2m wide
Project Provenance Land, commercial Tower (B4+G+P10+29F). Page Number 1
Revision R0
Area Of Project Mumbai Prepared by GSRJ
Date 05.07.23
Element Description Basement Staircase Pressurization (B4-B1 Mezz) Checked by BK
Date 05.07.23
Input Output Calculated

Door Leakage Total Leakage Area / Floor dP At Bottom


Wall Area Per Floor Wall Leakage Factor Based on 2 mm Gaps Temp Differential dP at Top

Parameter A
lsb A
lbo A/Awsb A/Awbo A
dsb A
sb A
bo To Ts y Ql Q
od Qt=Ql+Qod Q +10%Q
Staircase ΔP
sbb B B ΔP
sbt
Perimeter Number Of
Building Floors Airflow Due To Airflow Through Total Required Total Required Airflow
Detail Staircase Building Exterior Staircase Stair Doors Staircase Building Exterior Outside Temp. Shaft Temp. Stairwell Height
Exterior Leakage Open Doors Airflow With Safety Factor

Units m m 2 m 2 m 2 m 2 m 2 Pa K K Pa/m Pa/m m Pa m3/s m3/s m3/s m3/s CFM

Tag Basement
Summer 21.10 137.2 2307.5 0.00011 0.00017 0.0126 0.01509 0.392 12.5 308.8 303.8 7 -0.18 0.1844 53 22.3 0.67454 4.03 4.71 5.18 10970
Winter 21.10 137.2 2307.5 0.00011 0.00017 0.0126 0.01509 0.392 12.5 304.2 309.2 7 0.18 0.1839 53 22.2 0.67430 4.03 4.71 5.18 10969

Stair Perimeter in m 21.1 Velocity m/s 0.75 Selected Fan Capacity 11000 CFM
Building Perimeter in m 355 No. of doors open 2 No.of staircase 1 No
Airflow Through 4.032 total No.of Fan QTY
Building Height in m 53.2 Open Doors m3/s 1 No

Leakage Through 0.013


Number of Floor 7 Closed Doors m3/s
Each Floor Height avg 6.50

Door Schedule
Parameter Single Leaf Door Double Leaf Door
Size 1.2m (W) 2.4m (H) 1.8m (W) 2.4m (H)
No. of Closed Doors Per floor 1
No. of Open Doors 2
Velocity Through
Open Doors 0.75 m/s

Data from BS 5588 Part 4


Table 3 - Typical leakage areas for four types of door
Crack
Type of door Size Leakage area(m2) Door Size
length(m) Leakage area
Type of Door Door area (m2) Crack length (m)
Single - leaf in rebated frame opening 2 m high 5.6 0.01 m2
into a pressurized space 800mm wide Height Width

Single - leaf in rebated frame opening 2 m high 800mm 5.6 0.02


outwards from a pressurized space wide Single Leaf Door 2.4 1.12 2.7 7.0 0.013

Double-leaf with or without centre 2 m high 9.2 0.03


Lift landing rebate
door (see 5.3.2.3) 1.6m wide
2 m high 8.0 0.06
2m wide