Cost Estimation Report

This report presents the cost estimations for various components of the construction project,

including earthwork, building, and additional costs. Charts and tables summarize the findings for

each section.
Question 1: Cost Estimation of Earthwork Excavation

**Summary**:

The total excavated volume is 766.38 cubic meters, and costs are calculated based on standard

schedule rates.

**Insights**:

Earthwork is critical and cost-intensive. Efficient resource allocation can reduce costs significantly.
Question 2: Cost Estimation of the Two-Storied Building

**Summary**:

This includes costs for foundation, slab, beams, and other components, amounting to significant

project expenditures.

**Insights**:

Material selection and design efficiency play a key role in optimizing costs.
Question 3: Cost Estimation of the Kitchen and Toilet

**Summary**:

The combined cost of kitchen and toilet construction, focusing on structural and finishing elements.

**Insights**:

Proper planning can balance functionality and budget efficiency.


Question 4: Cost Estimation of Poultry Farms

**Summary**:

Includes construction and furnishing costs, tailored for scalability.

**Insights**:

Efficient use of materials and labor can minimize costs.


Question 5: Cost Estimation of Septic Tank and Tubewell

**Summary**:

Breakdown of excavation, materials, and labor costs for both elements.

**Insights**:

Focus on sustainable designs and long-term maintenance savings.


Question 6: Additional Costs Estimation

**Summary**:

A lump-sum allocation for miscellaneous and unforeseen project expenses.

**Insights**:

Careful contingency planning is essential to avoid budget overruns.