0% found this document useful (0 votes)
5 views

Electrical Inspection report BA Side 02 July 2024

Uploaded by

murtazamahar1996
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views

Electrical Inspection report BA Side 02 July 2024

Uploaded by

murtazamahar1996
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

KFCA Project – Inspection Report

Location: BA Side Service Type: Electrical Date 02/07/2024

Preventive Maintenance Inspection


Sr. Bldg. No:
N W.O Number Description Observations Photo Required Action Status Remarks
o Location:

Preventive Maintenance of External


M228-BA-ZN4- PM Completed
1 WO26816983 Lightings-ZN4-BRD2-TRUCK EXIT ROAD PM tasks have Been Done
BRD2
TO CAUSEWAY BRIDGE

M228-BA-ZN4- Routine Inspection Maintenance of Exit PM Completed


2 WO26819058 PM tasks have Been Done
B25A Light-ZN4-Bldg.# B25A

M228-BA-ZN4- Routine Inspection Maintenance of Exit PM Completed


3 WO26819072 PM tasks have Been Done
SVIP Light-ZN4-Bldg.# SVIP

Preventive Maintenance of Fire Alarm


M228-BA-ZN3- PM Completed
4 WO26817269 System-ZN3-Bldg.# BA04-Insurance & PM tasks have Been Done
BA04
Commercial Bldg.

Preventive Maintenance of Fire Alarm


M228-BA-ZN3- PM Completed
5 WO26817281 System-ZN3-Bldg.# BA05-National PM tasks have Been Done
BA05-00
Security Bldg. Ground Flr.

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-GEN-FR-1-00 Revision: 00 Page 1 of 6
KFCA Project – Inspection Report

Preventive Maintenance of Fire Alarm


M228-BA-ZN3- PM Completed
6 WO26817293 System-ZN3-Bldg.# BA05-National PM tasks have Been Done
BA05-01
Security Bldg. First Flr.

Preventive Maintenance of Glass Sliding


M228-BA-ZN3- PM Completed
7 WO26821336 Door-ZN2-Bldg.# BA15-MOSQUE-GENTS PM tasks have Been Done
BA15
& LADIES AREA

Reactive/Corrective Maintenance
Sr. Bldg. No:
N W.O Number Description Observations Photo Required Action Status Remarks
Location
o

Flashlights not working Statistics cabinet


1 M228-BA-ZN1 WO27180119 RM Task has Been Done RM completed
TOLL GATE

Replace busted bulb for Traffic Signal


M228-BA-ZN3- Lights at BICA - INSURANCE ARRIVAL
2 BAIC WO27336349 CABIN # 4 Location: BICA INSURANCE RM Task has Been Done RM completed
ARRIVAL CABIN # 4

M228-BA-ZN3- Repair of faulty Road Barrier at CUSTOM


3 BCCD WO27336304 CABIN DEPARTURE - Student line RM Task has Been Done RM completed

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-GEN-FR-1-00 Revision: 00 Page 2 of 6
KFCA Project – Inspection Report

Additional Reactive/Corrective Maintenance


Sr.
N Bldg. No: W.O Number Description Observations Photo Required Action Status Remarks
o
M228-BA-ZN3- Additional Work - Repair of faulty ROAD
BICA BARRIER at IMMIGRATION CABIN
1 WO27336307 RM Task has Been Done RM completed
ARRIVAL K5

General Observation
S. Location Observations
Department Photo Action required Status Updated Status Remarks
N0

M228-BA-ZN4-
BA12 Observed the truck yard area near the Need to Cover the Cables
1 Electrical exit gate exposed wire. with a junction box.

M228-BA-ZN4-
BA12 Observed the truck yard area near the Need to replace broken
2 Electrical exit gate, a broken junction box. Junction Box with new
one.

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-GEN-FR-1-00 Revision: 00 Page 3 of 6
KFCA Project – Inspection Report

Cargo Arrival
Observed the insect's killer machine BLK Need to replace Busted
3 Security Cabin Electrical tube light was found busted. Light with new one.
BA Side

M228-BA-ZN4-
B10A-Custom
Inspection Observed the Exposed wire.
4 Area Electrical Need To fix it properly.

M228-BA-ZN4-
B10A-Custom
Inspection Observed the tube light was found Need to replace it with a
5 Area Electrical busted. new one.

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-GEN-FR-1-00 Revision: 00 Page 4 of 6
KFCA Project – Inspection Report

M228-BA-ZN4-
B10A-Custom
Inspection Observed the socket outlet safety cover Need to Fix the Safety
6 Area Electrical missing. Cover, resolve the issue.

M228-BA-ZN3- Observed the first-floor front of room


Need to close with a blank
7 BA03 Electrical
# 115 was found open socket outlet. cover sheet.

M228-BA-ZN3- Observed the ground floor corridor near Need to close with a blank
8 BA03 Electrical room 124 was found open socket outlet. cover sheet.

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-GEN-FR-1-00 Revision: 00 Page 5 of 6
KFCA Project – Inspection Report

M228-BA-ZN3- Observed the ground floor room # 124 Need to fix the cover
9 BA03 Electrical was found socket outlet cover missing. plate.

Observed the first-floor corridor


M228-BA-ZN3- Need to remove Almirahs
10 Electrical Electrical DB was found covered with to Make a space for
BA03
Almirahs Electrical Panel.

Inspected By

Olive Arabia O&M Contractor

Muhammad Farhaj & Yasir Ali Safari

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-GEN-FR-1-00 Revision: 00 Page 6 of 6