Copy of Ticket Form-Busira
Copy of Ticket Form-Busira
Co
Chemical team
Satellite Unit
10/6/2024
Must install two chemical rooms as
External
Eng.Aya
Busira
10/6/2024
safety site
External
Eng.Aya
Busira
High
Boiler area Facilicty There is unsafe leader 2 Day
2
Safety Site/Houeskeeping
Satellite Unit
10/6/2024
External
Eng.Aya
Poor clean electrical panel (there is
Busira
High
All Area Electrical dust build up inside the electrical 1 Week
3
Safety Management
Satellite Unit
10/6/2024
External
Eng.Aya
There is a manhole in front of the
Busira
High
Utility area Fire emergency exit door, which does
4
Chemical Team
Satellite Unit
External
Eng.Aya
for an eyewash bottle are not sufficient
Busira
changed.
wash the eye, so more should be added
or an eye wash station arranged.
During a safety inspection,
Chemical Team
Satellite Unit
10/6/2024
damage was observed on several
External
Eng.Aya
Busira
respiratory masks(Some filters Should be replaced damaged
high
Boiler area Chemical 1 week
6
Houeskeeping/Safety Site
Satellite Unit
10/6/2024
Poor housekeeping Practices(scrap
External
Eng.Aya
Busira
high
Boiler area Fire 1 Week
7
10/6/2024
Safety Site
External
Eng.Aya
Busira
High
Boiler area Confined Space 1 Week
8
Safety Team
10/6/2024
External
Eng.Aya
Busira
High
Boiler area Fire 1 Week
9
10/6/2024
The hot water and diesel tank need Secondary containers, warning
External
Eng.Aya
Busira
Houeskeeping/Safety Site
Satellite Unit
10/6/2024
External
Eng.Aya
Medium
Busira
cleaned.
Satellite Unit
10/6/2024
Safety Site
External
Eng.Aya
Busira
The metal gloves is defective need new ones, and enhanced monitoring
High
10/6/2024
External
Eng.Aya
Busira
The PPE box and eye wash bottles The PPE box and eye wash bottles
High
10/6/2024
Poor carton storage, as per the
Safety Site
External
Eng.Aya
Busira
safety recommendation, the
High
Ground Floor Fall The carton should be stored properly. 1 Week
14
Chemical Team
Satellite Unit
10/6/2024
External
Eng.Aya
The chemical storage room is
Busira
High
Chemical Store Chemical inadequate (too small), and 2 Week
15
properly.
chemicals are improperly stored.
Mechanical Team
Satellite Unit
10/6/2024
External
Eng.Aya
The HVAC unit and associated piping
Busira
High
Production Floor Mechanical overhead should be securely fastened 2 week
16
condition.
and regularly inspected to ensure they
are not at risk of falling.
Satellite Unit
CBD Team
10/6/2024
External
Eng.Aya
The angle metal sheet needs to be
Busira
High
Cutting area Facility installed properly to prevent 1 Month
17
installed properly
tripping hazards.
Maintanance team
Satellite Unit
10/6/2024
External
Eng.Aya
Busira
The exhaust fans are not securely The exhaust fans should be securely
Spot Cleaning Room Mechanical High 1 Month
18
CBD Team
10/6/2024
External
Eng.Aya
Busira
High
Production Floor Facility False Ceiling is damaged. False Ceiling should be repaired. 1 Month
19
Satellite Unit
10/6/2024
Safety Site
External
Eng.Aya
Busira
10/6/2024
Safety Site
External
Eng.Aya
Busira
10/6/2024
The control panel should be regularly
External
Eng.Aya
Medium
Poor clean control panel (there is
Busira
cleaned to avoid any dirt build-up, and
Packing area Fire dust build up inside the control 3 Days
22
10/6/2024
Safety Site
External
Eng.Aya
Busira
Exit arrows are missing and there Exit arrows should be exist and proper
High
Packing area Fire 1 Week
23
CBD Team
10/6/2024
External
Eng.Aya
Busira
High
Canteen Facility There is a crack in the wall. The crack should be repaired. 1 Month
24
Satellite Unit
CBD Team
10/6/2024
External
Eng.Aya
Medium
Busira
Maintenance team
Satellite Unit
10/6/2024
External
Eng.Aya
Medium
Busira
Cartoon area Facility Push bar is missing Push bar should be installed 1 Week
26
Safety Site/HealthPillar
Satellite Unit
10/6/2024
External
Eng.Aya
The insect killer should be checked to
Busira
High
Canteen Health The insect killer is not working. see if it's working or not and 2 Week
27
10/6/2024
Safety Site
External
Eng.Aya
Medium
Busira
CBD Team
10/6/2024
External
Eng.Aya
Busira
Main electrical room Electrical The hole pit should be closed. 1 Month
29
closed.
Satellite Unit
10/6/2024
Safety Site
External
Eng.Aya
Busira
There is scrap material inside Should be removed any scrap material
High
Main electrical room Electrical 2 Days
30
10/6/2024
Safety Site
External
Eng.Aya
Medium
Busira
damaged. replaced.
Satellite Unit
10/6/2024
Safety Site
External
Eng.Aya
Medium
Busira
External
Eng.Aya
cables outside need to be checked
Busira
Team
The high-voltage cables outside should
High
Outside Electrical (could potentially electrocute 2 Week
33
10/6/2024
Safety Site
External
Eng.Aya
Enhancing monitoring to prevent the
Busira
10/6/2024
External
Eng.Aya
Medium
Busira
The steam pipe container is filled kept clean, and a cover should be
team
Outside Mechanical 1 Week
35
Safety Site/Maintenance
Satellite Unit
External
Eng.Aya
shirt caught on the conveyor and unsafe acts and ensure the avoidance of
Busira
Team
High
Outside Mechanical places their shoes in front of it, and recurrence of this issue, as well as 1 Week
36
the rotating part ( wheel) is installing a cover for the wheel of the
without cover. conveyor.
Maintenance Team
Satellite Unit
10/6/2024
External
Eng.Aya
Busira
The lift control panel needs to be The lift control panel should be
High
Safety Team
10/6/2024
External
Eng.Aya
The fire extinguisher is placed too
Busira
The fire extinguisher should be placed
High
Child care Fire high and could fall, posing a 3 Days
38
in a safe place.
danger to children.
Satellite Unit
10/6/2024
Safety Site
External
Eng.Aya
There is a plant hanging on the
Busira
High
Production Floor Facility ceiling in an inappropriate location 2 Days
39
should be removed.
it could fall.
Houeskeeping/Safety Site
Satellite Unit
10/6/2024
External
Eng.Aya
Busira
High
Stairs Facility The stairs should be maintained clean.
40
10/6/2024
External
Eng.Aya
Busira
The elevator room lacks detectors, The elevator room should be installed
High
Lift room Fire 2 Week
41
10/6/2024
The door to the lift room lacks The lift room should be installed
Safety Site
External
Eng.Aya
Busira
10/6/2024
Safety Site
External
Eng.Aya
Medium
Busira
the roof.
Satellite Unit
Safety Team
10/6/2024
External
Eng.Aya
door needs to change direction The door direction should be changed,
Busira
High
CTPAT area Fire install a push bar and add and a push bar and emergency lights 2 Week
44
10/6/2024
External
Eng.Aya
Busira
10/6/2024
External
Eng.Aya
Busira
The fire extinguisher is not The fire extinguisher should be fixed
High
Second Floor Fire 2 Days
46
Houeskeeping/Safety Site
Satellite Unit
10/6/2024
External
Eng.Aya
Medium
Busira
be cleaned.
Satellite Unit
10/6/2024
Safety Site
External
Eng.Aya
Busira
High
Accommodation Electrical 1 Day
48
10/6/2024
SafetySite
External
Eng.Aya
The water test board should be
Busira
High
Accommodation Health changed, and the date should be 2 Days
49
of date.
mentioned.
Satellite Unit
10/6/2024
Safety Site
External
Eng.Aya
Busira
The board is not properly secured; The board should be properly secured
Some area Facility 2 Week
50
Safety Team
10/6/2024
External
Eng.Aya
Busira
10/6/2024
External
Eng.Aya
Diesel tank should be placed in a
Busira
10/6/2024
Safety Site
External
Eng.Aya
Busira
Hot water tank without warning Hot water tank should be installed
High
10/6/2024
Unsafe condition: There is an
External
Eng.Aya
Busira
electrical panel in bad condition
High
Boiler area Electrical Electrical panel should bemaintained. 2 Week
54
10/6/2024
Safety Site
External
Eng.Aya
The door to the transformer area The door to the transformer area
Busira
High
Transformer area Electrical needs to be properly closed, and should be properly closed, and there 1 Week
55
Safety Team
10/6/2024
External
Eng.Aya
Busira
High
Outside Electrical The earth line should be fixed properly. 1 Week
56
properly.
Satellite Unit
10/6/2024
Safety Site
External
Eng.Aya
Busira
High
Outside Confined Space Warning signages should be installed. 3 Days
57
warning signages.
Satellite Unit
Safrty Team
10/6/2024
External
Eng.Aya
Busira
There are no heat detectors and Should be installed heat detectors and
Prayer Room Fire High 2 Week
58
exit lights inside the prayer room. exit lights inside the prayer room.
Satellite Unit
Safety Site
External
Eng.Aya
alcohol from entering the workplace
Busira
10/6/2024
External
Eng.Aya
Busira
10/6/2024
External
Eng.Aya
Busira
61