M1
M1
9. Write down the generic process framework that is applicable to any software project /
relationship between work product, task, activity and system.
13. Discuss about software process and umbrella activities with diagram.
17. Discuss the prototyping model. What is the effect of designing a prototype on the overall cost of
the software project?
18. Describe the types of situations where iterative enhancement model might lead to difficulties.
19. Elucidate the key features of the software process models with suitable examples.