0% found this document useful (0 votes)
14 views47 pages

ACFrOgA9C0flzO6iEr07wB1fxv5m9GTBZcwlKu 9acrKshXRa - Tm3wF VZ8rIrd5 qCHS1Ct5YyYMc8zxTQCfQWzjflIqy0Svlym7cRuTwf5f7nKKgwHqcAD1rKJ 7RXhc8jXxZtIwwci5JKVt5

Uploaded by

dagumoaizen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views47 pages

ACFrOgA9C0flzO6iEr07wB1fxv5m9GTBZcwlKu 9acrKshXRa - Tm3wF VZ8rIrd5 qCHS1Ct5YyYMc8zxTQCfQWzjflIqy0Svlym7cRuTwf5f7nKKgwHqcAD1rKJ 7RXhc8jXxZtIwwci5JKVt5

Uploaded by

dagumoaizen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 47

PHILIPPINE BIDDING DOCUMENTS

(As Harmonized with Development Partners)

Procurement of Wash
Facility for Sta. Maria ES
in Alicia and Basalem ES in
Buug, Zamboanga Sibugay

Government of the Republic of the Philippines

Sixth Edition
July 2020
TABLE OF CONTENTS

Glossary of Terms, Abbreviations, and Acronyms..........................................4


Section I. Invitation to Bid .................................................................................7
Section II. Instructions to Bidders.....................................................................8
1. Scope of Bid ............................................................................................................11
2. Funding Information ...............................................................................................11
3. Bidding Requirements.............................................................................................11
4. Corrupt, Fraudulent, Collusive, Coercive, and Obstructive Practices ....................11
5. Eligible Bidders.......................................................................................................12
6. Origin of Associated Goods ....................................................................................12
7. Subcontracts ............................................................................................................12
8. Pre-Bid Conference .................................................................................................13
9. Clarification and Amendment of Bidding Documents............................................13
10. Documents Comprising the Bid: Eligibility and Technical Components ...............13
11. Documents Comprising the Bid: Financial Component .........................................14
12. Alternative Bids ......................................................................................................14
13. Bid Prices ................................................................................................................14
14. Bid and Payment Currencies ...................................................................................14
15. Bid Security.............................................................................................................14
16. Sealing and Marking of Bids...................................................................................15
17. Deadline for Submission of Bids ............................................................................15
18. Opening and Preliminary Examination of Bids ......................................................15
19. Detailed Evaluation and Comparison of Bids .........................................................15
20. Post Qualification ....................................................................................................16
21. Signing of the Contract ...........................................................................................16
Section III. Bid Data Sheet .............................................................................. 17
Section IV. General Conditions of Contract ................................................. 19
1. Scope of Contract ....................................................................................................20
2. Sectional Completion of Works ..............................................................................20
3. Possession of Site ....................................................................................................20
4. The Contractor’s Obligations ..................................................................................20
5. Performance Security ..............................................................................................21
6. Site Investigation Reports .......................................................................................21

2
7. Warranty ..................................................................................................................21
8. Liability of the Contractor .......................................................................................21
9. Termination for Other Causes .................................................................................21
10. Dayworks ................................................................................................................22
11. Program of Work.....................................................................................................22
12. Instructions, Inspections and Audits .......................................................................22
13. Advance Payment....................................................................................................22
14. Progress Payments ..................................................................................................22
15. Operating and Maintenance Manuals......................................................................22
Section V. Special Conditions of Contract..................................................... 24
Section VI. Specifications ................................................................................ 26
Section VII. Drawings ...................................................................................... 27
Section VIII. Bill of Quantities ........................... Error! Bookmark not defined.
Section IX. Checklist of Technical and Financial Documents ..................... 45

3
Glossary of
Terms, Abbreviations, and Acronyms

ABC – Approved Budget for the Contract.

ARCC – Allowable Range of Contract Cost.

BAC – Bids and Awards Committee.

Bid – A signed offer or proposal to undertake a contract submitted by a bidder in response to


and in consonance with the requirements of the bidding documents. Also referred to as
Proposal and Tender. (2016 revised IRR, Section 5[c])

Bidder – Refers to a contractor, manufacturer, supplier, distributor and/or consultant who


submits a bid in response to the requirements of the Bidding Documents. (2016 revised IRR,
Section 5[d])

Bidding Documents – The documents issued by the Procuring Entity as the bases for bids,
furnishing all information necessary for a prospective bidder to prepare a bid for the Goods,
Infrastructure Projects, and/or Consulting Services required by the Procuring Entity. (2016
revised IRR, Section 5[e])

BIR – Bureau of Internal Revenue.

BSP – Bangko Sentral ng Pilipinas.

CDA – Cooperative Development Authority.

Consulting Services – Refer to services for Infrastructure Projects and other types of projects
or activities of the GOP requiring adequate external technical and professional expertise that
are beyond the capability and/or capacity of the GOP to undertake such as, but not limited to:
(i) advisory and review services; (ii) pre-investment or feasibility studies; (iii) design; (iv)
construction supervision; (v) management and related services; and (vi) other technical services
or special studies. (2016 revised IRR, Section 5[i])

Contract – Refers to the agreement entered into between the Procuring Entity and the Supplier
or Manufacturer or Distributor or Service Provider for procurement of Goods and Services;
Contractor for Procurement of Infrastructure Projects; or Consultant or Consulting Firm for
Procurement of Consulting Services; as the case may be, as recorded in the Contract Form
signed by the parties, including all attachments and appendices thereto and all documents
incorporated by reference therein.

Contractor – is a natural or juridical entity whose proposal was accepted by the Procuring
Entity and to whom the Contract to execute the Work was awarded. Contractor as used in these
Bidding Documents may likewise refer to a supplier, distributor, manufacturer, or consultant.

CPI – Consumer Price Index.

DOLE – Department of Labor and Employment.


4
DTI – Department of Trade and Industry.

Foreign-funded Procurement or Foreign-Assisted Project – Refers to procurement whose


funding source is from a foreign government, foreign or international financing institution as
specified in the Treaty or International or Executive Agreement. (2016 revised IRR, Section
5[b]).

GFI – Government Financial Institution.

GOCC – Government-owned and/or –controlled corporation.

Goods – Refer to all items, supplies, materials and general support services, except Consulting
Services and Infrastructure Projects, which may be needed in the transaction of public
businesses or in the pursuit of any government undertaking, project or activity, whether in the
nature of equipment, furniture, stationery, materials for construction, or personal property of
any kind, including non-personal or contractual services such as the repair and maintenance of
equipment and furniture, as well as trucking, hauling, janitorial, security, and related or
analogous services, as well as procurement of materials and supplies provided by the Procuring
Entity for such services. The term “related” or “analogous services” shall include, but is not
limited to, lease or purchase of office space, media advertisements, health maintenance
services, and other services essential to the operation of the Procuring Entity. (2016 revised
IRR, Section 5[r])

GOP – Government of the Philippines.

Infrastructure Projects – Include the construction, improvement, rehabilitation, demolition,


repair, restoration or maintenance of roads and bridges, railways, airports, seaports,
communication facilities, civil works components of information technology projects,
irrigation, flood control and drainage, water supply, sanitation, sewerage and solid waste
management systems, shore protection, energy/power and electrification facilities, national
buildings, school buildings, hospital buildings, and other related construction projects of the
government. Also referred to as civil works or works. (2016 revised IRR, Section 5[u])

LGUs – Local Government Units.

NFCC – Net Financial Contracting Capacity.

NGA – National Government Agency.

PCAB – Philippine Contractors Accreditation Board.

PhilGEPS - Philippine Government Electronic Procurement System.

Procurement Project – refers to a specific or identified procurement covering goods,


infrastructure project or consulting services. A Procurement Project shall be described,
detailed, and scheduled in the Project Procurement Management Plan prepared by the agency
which shall be consolidated in the procuring entity's Annual Procurement Plan. (GPPB Circular
No. 06-2019 dated 17 July 2019)

PSA – Philippine Statistics Authority.

SEC – Securities and Exchange Commission.


5
SLCC – Single Largest Completed Contract.

UN – United Nations.

6
Section I. Invitation to Bid

7
Invitation to Bid for Procurement of Wash Facility for Sta. Maria ES
in Alicia and Basalem ES in Buug, Zamboanga Sibugay
1. The Department of Education – Schools Division of Zamboanga Sibugay, through the
General Appropriations Act (GAA) 2024 intends to apply the sum of Three Hundred
Thirty-Six Thousand Four Hundred Twenty-One Pesos and 88/100 cent
(Php336,421.88) being the Approved Budget for the Contract (ABC) to payments
under the contract for each lot. Bids received in excess of the ABC for each lot shall be
automatically rejected at bid opening.

School District Physical Target ABC


Sta. Maria ES Alicia 1unit – Temporary Wash Facility 168,210.94
Basalem ES Buug 1unit – Temporary Wash Facility 168,210.94
TOTAL 4cl - TLS 336,421.88

2. The Department of Education – Schools Division of Zamboanga Sibugay now invites


bids for the above Procurement Project. Completion of the Works is required Forty-
Five Calendar Days (45CD). Bidders should have completed a contract similar to the
Project. The description of an eligible bidder is contained in the Bidding Documents,
particularly, in Section II (Instructions to Bidders).

3. Bidding will be conducted through open competitive bidding procedures using non-
discretionary “pass/fail” criterion as specified in the 2016 revised Implementing Rules
and Regulations (IRR) of Republic Act (RA) No. 9184.

4. Interested bidders may obtain further information from DepEd Schools Division of
Zamboanga Sibugay and inspect the Bidding Documents at the address given below
from 8:00 a.m. to 5:00 p.m.

5. A complete set of Bidding Documents may be acquired by interested bidders on August


24, 2024 from given address and website/s below and upon payment of the applicable
fee for the Bidding Documents, pursuant to the latest Guidelines issued by the GPPB,
in the amount of Five Hundred Pesos (Php500.00).The Procuring Entity shall allow the
bidder to present its proof of payment for the fees either to be presented in person or
through e-mail at [email protected]

6. The Department of Education Schools Division of Zamboanga Sibugay will hold a Pre-
Bid Conference1 on August 30, 2024, 1:30 p.m. at DepEd Division Office, Pangi, Ipil,
Zamboanga Sibugay and/or through videoconferencing/webcasting via Google Meet
Online Application, which shall be open to prospective bidders.

7. Bids must be duly received by the BAC Secretariat either through (i) manual
submission at the office address as indicated below or (ii) online or electronic

8
submission as indicated below on or before September 13, 2024, 1:00 p.m. Late bids
shall not be accepted.

8. All bids must be accompanied by a bid security in any of the acceptable forms and in
the amount stated in ITB Clause 16.

9. Bid opening shall be on September 13, 2024, 1:30 p.m. at the given address below
and/or through Google Meet Online Application. Bids will be opened in the presence
of the bidders’ representatives who choose to attend the activity.

10. The Department of Education Schools Division of Zamboanga Sibugay reserves the
right to reject any and all bids, declare a failure of bidding, or not award the contract at
any time prior to contract award in accordance with Sections 35.6 and 41 of the 2016
revised Implementing Rules and Regulations (IRR) of RA No. 9184, without thereby
incurring any liability to the affected bidder or bidders.

11. For further information, please refer to the BAC Secretariats:

Liezel Capitanea/Cherrie Mae Jumao-as


DepEd Schools Division of Zamboanga Sibugay
Pangi, Ipil, Zamboanga Sibugay
[email protected]
062-333-5492/ 0936-662-1498
www.depedzamboangasibugay.ph

12. You may visit the following websites:

For downloading of Bidding Documents: www.notices.philgeps.gov.ph

______________________________________
Ma. Colleen L. Emoricha, Ed.D, CESO VI
BAC Chairman

9
Section II. Instructions to Bidders

10
1. Scope of Bid
The Procuring Entity, Department of Education Schools Division of Zamboanga
Sibugay invites Bids for the Procurement of Wash Facility for Sta. Maria ES in Alicia
and Basalem ES in Buug, Zamboanga Sibugay, with Project Identification Number
ZSY-2024WashFacilities-01.

The Procurement Project (referred to herein as “Project”) is for the construction of


Works, as described in Section VI (Specifications).

2. Funding Information
2.1. The GOP through the source of funding as indicated below for Procurement of
Wash Facility for Sta. Maria ES in Alicia and Basalem ES in Buug,
Zamboanga Sibugay in the amount of Three Hundred Thirty-Six Thousand
Four Hundred Twenty-One Pesos and 88/100 cent (Php336,421.88).

2.2. The source of funding is:

a. NGA, the General Appropriations Act or Special Appropriations.

3. Bidding Requirements
The Bidding for the Project shall be governed by all the provisions of RA No. 9184 and
its 2016 revised IRR, including its Generic Procurement Manual and associated
policies, rules and regulations as the primary source thereof, while the herein clauses
shall serve as the secondary source thereof.

Any amendments made to the IRR and other GPPB issuances shall be applicable only
to the ongoing posting, advertisement, or invitation to bid by the BAC through the
issuance of a supplemental or bid bulletin.

The Bidder, by the act of submitting its Bid, shall be deemed to have inspected the site,
determined the general characteristics of the contracted Works and the conditions for
this Project, such as the location and the nature of the work; (b) climatic conditions;
(c) transportation facilities; (c) nature and condition of the terrain, geological conditions
at the site communication facilities, requirements, location and availability of
construction aggregates and other materials, labor, water, electric power and access
roads; and (d) other factors that may affect the cost, duration and execution or
implementation of the contract, project, or work and examine all instructions, forms,
terms, and project requirements in the Bidding Documents.

4. Corrupt, Fraudulent, Collusive, Coercive, and Obstructive Practices


The Procuring Entity, as well as the Bidders and Contractors, shall observe the highest
standard of ethics during the procurement and execution of the contract. They or
through an agent shall not engage in corrupt, fraudulent, collusive, coercive, and
obstructive practices defined under Annex “I” of the 2016 revised IRR of RA No. 9184
or other integrity violations in competing for the Project.

11
5. Eligible Bidders
5.1. Only Bids of Bidders found to be legally, technically, and financially capable
will be evaluated.

5.2. The Bidder must have an experience of having completed a Single Largest
Completed Contract (SLCC) that is similar to this Project, equivalent to at least
fifty percent (50%) of the ABC adjusted, if necessary, by the Bidder to current
prices using the PSA’s CPI, except under conditions provided for in Section
23.4.2.4 of the 2016 revised IRR of RA No. 9184.

A contract is considered to be “similar” to the contract to be bid if it has the


major categories of work stated in the BDS.

5.3. For Foreign-funded Procurement, the Procuring Entity and the foreign
government/foreign or international financing institution may agree on another
track record requirement, as specified in the Bidding Document prepared for
this purpose.

5.4. The Bidders shall comply with the eligibility criteria under Section 23.4.2 of the
2016 IRR of RA No. 9184.

6. Origin of Associated Goods


There is no restriction on the origin of Goods other than those prohibited by a decision
of the UN Security Council taken under Chapter VII of the Charter of the UN.

7. Subcontracts
7.1. The Bidder may subcontract portions of the Project to the extent allowed by the
Procuring Entity as stated herein, but in no case more than fifty percent (50%)
of the Project.

The Procuring Entity has prescribed that:

a. Subcontracting is not allowed.

7.1. The Supplier may identify its subcontractor during the contract implementation
stage. Subcontractors identified during the bidding may be changed during the
implementation of this Contract. Subcontractors must submit the documentary
requirements under Section 23.1 of the 2016 revised IRR of RA No. 9184 and
comply with the eligibility criteria specified in ITB Clause 5 to the
implementing or end-user unit.

7.2. Subcontracting of any portion of the Project does not relieve the Contractor of
any liability or obligation under the Contract. The Supplier will be responsible
for the acts, defaults, and negligence of any subcontractor, its agents, servants,
12
or workmen as fully as if these were the Contractor’s own acts, defaults, or
negligence, or those of its agents, servants, or workmen.

8. Pre-Bid Conference
The Procuring Entity will hold a pre-bid conference for this Project on the specified
date and time and either at its physical address DepEd Schools Division of Zamboanga
Sibugay, Pangi, Ipil, Zamboanga Sibugay and/or through
videoconferencing/webcasting as indicated in paragraph 6 of the IB.

9. Clarification and Amendment of Bidding Documents


Prospective bidders may request for clarification on and/or interpretation of any part of
the Bidding Documents. Such requests must be in writing and received by the
Procuring Entity, either at its given address or through electronic mail indicated in the
IB, at least ten (10) calendar days before the deadline set for the submission and receipt
of Bids.

10. Documents Comprising the Bid: Eligibility and Technical


Components
10.1. The first envelope shall contain the eligibility and technical documents of the
Bid as specified in Section IX. Checklist of Technical and Financial
Documents.

10.2. If the eligibility requirements or statements, the bids, and all other documents
for submission to the BAC are in foreign language other than English, it must
be accompanied by a translation in English, which shall be authenticated by the
appropriate Philippine foreign service establishment, post, or the equivalent
office having jurisdiction over the foreign bidder’s affairs in the Philippines.
For Contracting Parties to the Apostille Convention, only the translated
documents shall be authenticated through an apostille pursuant to GPPB
Resolution No. 13-2019 dated 23 May 2019. The English translation shall
govern, for purposes of interpretation of the bid.

10.3. A valid PCAB License is required, and in case of joint ventures, a valid special
PCAB License, and registration for the type and cost of the contract for this
Project. Any additional type of Contractor license or permit shall be indicated
in the BDS.

10.4. A List of Contractor’s key personnel (e.g., Project Manager, Project Engineers,
Materials Engineers, and Foremen) assigned to the contract to be bid, with their
complete qualification and experience data shall be provided. These key
personnel must meet the required minimum years of experience set in the BDS.

10.5. A List of Contractor’s major equipment units, which are owned, leased, and/or
under purchase agreements, supported by proof of ownership, certification of
availability of equipment from the equipment lessor/vendor for the duration of
the project, as the case may be, must meet the minimum requirements for the
contract set in the BDS.

13
11. Documents Comprising the Bid: Financial Component
11.1. The second bid envelope shall contain the financial documents for the Bid as
specified in Section IX. Checklist of Technical and Financial Documents.

11.2. Any bid exceeding the ABC indicated in paragraph 1 of the IB shall not be
accepted.

11.3. For Foreign-funded procurement, a ceiling may be applied to bid prices


provided the conditions are met under Section 31.2 of the 2016 revised IRR of
RA No. 9184.

12. Alternative Bids


Bidders shall submit offers that comply with the requirements of the Bidding
Documents, including the basic technical design as indicated in the drawings and
specifications. Unless there is a value engineering clause in the BDS, alternative Bids
shall not be accepted.

13. Bid Prices


All bid prices for the given scope of work in the Project as awarded shall be considered
as fixed prices, and therefore not subject to price escalation during contract
implementation, except under extraordinary circumstances as determined by the NEDA
and approved by the GPPB pursuant to the revised Guidelines for Contract Price
Escalation guidelines.

14. Bid and Payment Currencies


14.1. Bid prices may be quoted in the local currency or tradeable currency accepted
by the BSP at the discretion of the Bidder. However, for purposes of bid
evaluation, Bids denominated in foreign currencies shall be converted to
Philippine currency based on the exchange rate as published in the BSP
reference rate bulletin on the day of the bid opening.

14.2. Payment of the contract price shall be made in:

a. Philippine Pesos.
15. Bid Security
15.1. The Bidder shall submit a Bid Securing Declaration or any form of Bid Security
in the amount indicated in the BDS, which shall be not less than the percentage
of the ABC in accordance with the schedule in the BDS.

15.2. The Bid and bid security shall be valid until One Hundred Twenty Calendar
Days (120 CD). Any bid not accompanied by an acceptable bid security shall
be rejected by the Procuring Entity as non-responsive.

14
16. Sealing and Marking of Bids
Each Bidder shall submit one copy of the first and second components of its Bid.

The Procuring Entity may request additional hard copies and/or electronic copies of the
Bid. However, failure of the Bidders to comply with the said request shall not be a
ground for disqualification.

If the Procuring Entity allows the submission of bids through online submission to the
given website or any other electronic means, the Bidder shall submit an electronic copy
of its Bid, which must be digitally signed. An electronic copy that cannot be opened or
is corrupted shall be considered non-responsive and, thus, automatically disqualified.

17. Deadline for Submission of Bids


The Bidders shall submit on the specified date and time and either at its physical address
or through online submission as indicated in paragraph 7 of the IB.

18. Opening and Preliminary Examination of Bids


18.1. The BAC shall open the Bids in public at the time, on the date, and at the place
specified in paragraph 9 of the IB. The Bidders’ representatives who are present
shall sign a register evidencing their attendance. In case videoconferencing,
webcasting or other similar technologies will be used, attendance of participants
shall likewise be recorded by the BAC Secretariat.

In case the Bids cannot be opened as scheduled due to justifiable reasons, the
rescheduling requirements under Section 29 of the 2016 revised IRR of RA No.
9184 shall prevail.

18.2. The preliminary examination of Bids shall be governed by Section 30 of the


2016 revised IRR of RA No. 9184.

19. Detailed Evaluation and Comparison of Bids


19.1. The Procuring Entity’s BAC shall immediately conduct a detailed evaluation of
all Bids rated “passed” using non-discretionary pass/fail criteria. The BAC
shall consider the conditions in the evaluation of Bids under Section 32.2 of
2016 revised IRR of RA No. 9184.

19.2. If the Project allows partial bids, all Bids and combinations of Bids as indicated
in the BDS shall be received by the same deadline and opened and evaluated
simultaneously so as to determine the Bid or combination of Bids offering the
lowest calculated cost to the Procuring Entity. Bid Security as required by ITB
Clause 16 shall be submitted for each contract (lot) separately.

15
19.3. In all cases, the NFCC computation pursuant to Section 23.4.2.6 of the 2016
revised IRR of RA No. 9184 must be sufficient for the total of the ABCs for all
the lots participated in by the prospective Bidder.

20. Post Qualification


Within a non-extendible period of five (5) calendar days from receipt by the Bidder of
the notice from the BAC that it submitted the Lowest Calculated Bid, the Bidder shall
submit its latest income and business tax returns filed and paid through the BIR
Electronic Filing and Payment System (eFPS), and other appropriate licenses and
permits required by law and stated in the BDS.

21. Signing of the Contract


The documents required in Section 37.2 of the 2016 revised IRR of RA No. 9184 shall
form part of the Contract. Additional Contract documents are indicated in the BDS.

16
Section III. Bid Data Sheet

17
Bid Data Sheet
ITB Clause
5.2 For this purpose, contracts similar to the Project refer to contracts which have
the same major categories of work, which shall be:
*Construction of any vertical projects.

7.1 Subcontracting is not allowed.

10.3 At least PCAB License Small B Category C&D


10.4 The key personnel must meet the required minimum years of experience set
below:
Key Personnel General Experience Relevant Experience
Civil Engineer 2yrs 1yr
General Foreman 2yrs 1yr

10.5 The minimum major equipment requirements are the following:


Equipment Capacity Number of Units
Hand Tools Planer, Hand Drill, Sander & etc 3

12 No further instruction.

15.1 The bid security shall be in the form of a Bid Securing Declaration or any of the
following forms and amounts:
a. The amount of not less than Six Thousand Seven Hundred Twenty-
Eight Pesos & 44/100 cent (Php 6,728.44) (2% of ABC), if bid security
is in cash, cashier’s/manager’s check, bank draft/guarantee or
irrevocable letter of credit:
b. The amount of not less than Sixteen Thousand Eight Hundred
Twenty-One Pesos & 10/100 cent (Php 16,821.10) (5% of ABC), if
bid security is in Surety Bond.
19.2 Not applicable.
20 No further instruction.
21 Additional contract documents relevant to the Project: performance security,
construction schedule and S-curve, manpower schedule, construction methods,
equipment utilization schedule, construction safety and health program
approved by the DOLE, PERT/CPM (Project Evaluation Technique/Critical
Path Method).

18
Section IV. General Conditions of Contract

19
1. Scope of Contract
This Contract shall include all such items, although not specifically mentioned, that can
be reasonably inferred as being required for its completion as if such items were
expressly mentioned herein. All the provisions of RA No. 9184 and its 2016 revised
IRR, including the Generic Procurement Manual, and associated issuances, constitute
the primary source for the terms and conditions of the Contract, and thus, applicable in
contract implementation. Herein clauses shall serve as the secondary source for the
terms and conditions of the Contract.

This is without prejudice to Sections 74.1 and 74.2 of the 2016 revised IRR of RA No.
9184 allowing the GPPB to amend the IRR, which shall be applied to all procurement
activities, the advertisement, posting, or invitation of which were issued after the
effectivity of the said amendment.

2. Sectional Completion of Works


If sectional completion is specified in the Special Conditions of Contract (SCC),
references in the Conditions of Contract to the Works, the Completion Date, and the
Intended Completion Date shall apply to any Section of the Works (other than
references to the Completion Date and Intended Completion Date for the whole of the
Works).

3. Possession of Site
4.1. The Procuring Entity shall give possession of all or parts of the Site to the
Contractor based on the schedule of delivery indicated in the SCC, which
corresponds to the execution of the Works. If the Contractor suffers delay or
incurs cost from failure on the part of the Procuring Entity to give possession in
accordance with the terms of this clause, the Procuring Entity’s Representative
shall give the Contractor a Contract Time Extension and certify such sum as fair
to cover the cost incurred, which sum shall be paid by Procuring Entity.

4.2. If possession of a portion is not given by the above date, the Procuring Entity
will be deemed to have delayed the start of the relevant activities. The resulting
adjustments in contract time to address such delay may be addressed through
contract extension provided under Annex “E” of the 2016 revised IRR of RA
No. 9184.

4. The Contractor’s Obligations


The Contractor shall employ the key personnel named in the Schedule of Key Personnel
indicating their designation, in accordance with ITB Clause 10.3 and specified in the
BDS, to carry out the supervision of the Works.

The Procuring Entity will approve any proposed replacement of key personnel only if
their relevant qualifications and abilities are equal to or better than those of the
personnel listed in the Schedule.

20
5. Performance Security
5.1. Within ten (10) calendar days from receipt of the Notice of Award from the
Procuring Entity but in no case later than the signing of the contract by both
parties, the successful Bidder shall furnish the performance security in any of
the forms prescribed in Section 39 of the 2016 revised IRR.

5.2. The Contractor, by entering into the Contract with the Procuring Entity,
acknowledges the right of the Procuring Entity to institute action pursuant to RA
No. 3688 against any subcontractor be they an individual, firm, partnership,
corporation, or association supplying the Contractor with labor, materials and/or
equipment for the performance of this Contract.

6. Site Investigation Reports


The Contractor, in preparing the Bid, shall rely on any Site Investigation Reports
referred to in the SCC supplemented by any information obtained by the Contractor.

7. Warranty
7.1. In case the Contractor fails to undertake the repair works under Section 62.2.2
of the 2016 revised IRR, the Procuring Entity shall forfeit its performance
security, subject its property(ies) to attachment or garnishment proceedings, and
perpetually disqualify it from participating in any public bidding. All payables
of the GOP in his favor shall be offset to recover the costs.

7.2. The warranty against Structural Defects/Failures, except that occasioned-on


force majeure, shall cover the period from the date of issuance of the Certificate
of Final Acceptance by the Procuring Entity. Specific duration of the warranty
is found in the SCC.

8. Liability of the Contractor


Subject to additional provisions, if any, set forth in the SCC, the Contractor’s liability
under this Contract shall be as provided by the laws of the Republic of the Philippines.
If the Contractor is a joint venture, all partners to the joint venture shall be jointly and
severally liable to the Procuring Entity.

9. Termination for Other Causes


Contract termination shall be initiated in case it is determined prima facie by the
Procuring Entity that the Contractor has engaged, before, or during the implementation
of the contract, in unlawful deeds and behaviors relative to contract acquisition and
implementation, such as, but not limited to corrupt, fraudulent, collusive, coercive, and
obstructive practices as stated in ITB Clause 4.

21
10. Dayworks
Subject to the guidelines on Variation Order in Annex “E” of the 2016 revised IRR of
RA No. 9184, and if applicable as indicated in the SCC, the Dayworks rates in the
Contractor’s Bid shall be used for small additional amounts of work only when the
Procuring Entity’s Representative has given written instructions in advance for
additional work to be paid for in that way.

11. Program of Work


11.1. The Contractor shall submit to the Procuring Entity’s Representative for
approval the said Program of Work showing the general methods, arrangements,
order, and timing for all the activities in the Works. The submissions of the
Program of Work are indicated in the SCC.

11.2. The Contractor shall submit to the Procuring Entity’s Representative for
approval an updated Program of Work at intervals no longer than the period
stated in the SCC. If the Contractor does not submit an updated Program of
Work within this period, the Procuring Entity’s Representative may withhold
the amount stated in the SCC from the next payment certificate and continue to
withhold this amount until the next payment after the date on which the overdue
Program of Work has been submitted.

12. Instructions, Inspections and Audits


The Contractor shall permit the GOP or the Procuring Entity to inspect the Contractor’s
accounts and records relating to the performance of the Contractor and to have them
audited by auditors of the GOP or the Procuring Entity, as may be required.

13. Advance Payment


The Procuring Entity shall, upon a written request of the Contractor which shall be
submitted as a Contract document, make an advance payment to the Contractor in an
amount not exceeding fifteen percent (15%) of the total contract price, to be made in
lump sum, or at the most two installments according to a schedule specified in the SCC,
subject to the requirements in Annex “E” of the 2016 revised IRR of RA No. 9184.

14. Progress Payments


The Contractor may submit a request for payment for Work accomplished. Such
requests for payment shall be verified and certified by the Procuring Entity’s
Representative/Project Engineer. Except as otherwise stipulated in the SCC, materials
and equipment delivered on the site but not completely put in place shall not be included
for payment.

15. Operating and Maintenance Manuals


15.1. If required, the Contractor will provide “as built” Drawings and/or operating
and maintenance manuals as specified in the SCC.
22
15.2. If the Contractor does not provide the Drawings and/or manuals by the dates
stated above, or they do not receive the Procuring Entity’s Representative’s
approval, the Procuring Entity’s Representative may withhold the amount stated
in the SCC from payments due to the Contractor.

23
Section V. Special Conditions of Contract

24
Special Conditions of Contract
GCC Clause
2 Not applicable.
3 The Procuring Entity shall give possession of all parts of the Site to the
Contractor after submission of the notarized Contract by the Contractor
to the Procuring Entity and on or before date of receipt of the NTP by the
Contractor.
4 No further instruction.
6 Not applicable.
7.2 The warranty against Structural Defects/ Failures

The warranty against Structural Defects/ Failures, except those


occasioned-on force majeure, shall cover the period stated hereunder and
shall be reckoned from the date of issuance of the Certificate of Final
Acceptance by the Procuring Entity.
1 year.

10 No dayworks are applicable to the contract.


11.1 The Contractor shall submit the Program of Work to the Procuring
Entity’s Representative within 10 calendar days of delivery of the Notice
of Award.
11.2 The period between Program of Work updates is every fifteen (15) days.
13 The amount of the advance payment is 15% of the Contract Amount.
14 Materials and equipment delivered on the site but not completely put in
place shall not be included for payment.
15.1 The date by which operating and maintenance manuals are required, 5
calendar days after the issuance of COC.

The date by which “as built” drawings are required, 5 calendar days after
the issuance of COC.
15.2 The amount to be withheld for failing to produce “as built” drawings
and/or operating and maintenance manuals by the date required is the
final billing.

25
Section VI. Specifications

26
Section VII. Drawings

27
Basalem ES, Brgy. Basalem, Buug, Zamboanga Sibugay

28
29
30
31
Sta. Maria ES, Brgy. Sta. Maria, Alicia, Zamboanga Sibugay

32
33
34
35
Section VIII. Bill of Quantities

36
Basalem ES, Brgy. Basalem, Buug, Zamboanga Sibugay

37
38
39
40
Sta. Maria ES, Brgy. Sta. Maria, Alicia, Zamboanga Sibugay

41
42
43
44
Section IX. Checklist of Technical and Financial
Documents

45
Checklist of Technical and Financial Documents
I. TECHNICAL COMPONENT ENVELOPE

Class “A” Documents

Legal Documents
(a) Valid PhilGEPS Registration Certificate (Platinum Membership) (all pages) in
accordance with Section 8.5.2 of the IRR;

Technical Documents
(b) Statement of the prospective bidder of all its ongoing government and private
contracts, including contracts awarded but not yet started, if any, whether similar or
not similar in nature and complexity to the contract to be bid; and

(c) Statement of the bidder’s Single Largest Completed Contract (SLCC) similar to
the contract to be bid, except under conditions provided under the rules; and

(d) Special PCAB License in case of Joint Ventures and registration for the type and
cost of the contract to be bid; and

(e) Original copy of Bid Security. If in the form of a Surety Bond, submit also a
certification issued by the Insurance Commission or original copy of
Notarized Bid Securing Declaration; and

(f) Project Requirements, which shall include the following:


a. Organizational chart for the contract to be bid;
b. List of contractor’s key personnel (e.g., Project Manager, Project
Engineers, Materials Engineers, and Foremen), to be assigned to the
contract to be bid, with their complete qualification and experience
data;
c. List of contractor’s major equipment units, which are owned, leased,
and/or under purchase agreements, supported by proof of ownership or
certification of availability of equipment from the equipment
lessor/vendor for the duration of the project, as the case may be; and

(g) Original duly signed Omnibus Sworn Statement (OSS) and if applicable,
Original Notarized Secretary’s Certificate in case of a corporation,
partnership, or cooperative; or Original Special Power of Attorney of all
members of the joint venture giving full power and authority to its officer to
sign the OSS and do acts to represent the Bidder.

Financial Documents
(h) The prospective bidder’s computation of Net Financial Contracting Capacity
(NFCC).

46
Class “B” Documents
(i) If applicable, duly signed joint venture agreement (JVA) in accordance with
RA No. 4566 and its IRR in case the joint venture is already in existence or
duly notarized statements from all the potential joint venture partners stating
that they will enter into and abide by the provisions of the JVA in the instance
that the bid is successful.

II. FINANCIAL COMPONENT ENVELOPE


(j) Original of duly signed and accomplished Financial Bid Form; and

Other documentary requirements under RA No. 9184


(k) Original of duly signed Bid Prices in the Bill of Quantities; and
(l) Duly accomplished Detailed Estimates Form, including a summary sheet
indicating the unit prices of construction materials, labor rates, and equipment
rentals used in coming up with the Bid; and
(m) Cash Flow by Quarter.