Clearance Study for Pushup (1)
Clearance Study for Pushup (1)
section of OHE in
Pantograph used (n)
difeerent speeds
Calculated Push
Measured Push
Contact wire in
Effective cross
up in mm(p1)
locomotive in
up in mm at
Tension in
Sq.mm(a)
Speed of
Span (d)
kmph(s)
Number of
kgf(t)
(p2)
kgf sq-mm m mm mm
160 140 100 65 15
3 1000 100 172 72.0 260
1 1000 160 140 100 65 15 172 72.0 138.7 121.3 86.7 56.3 13.0
3 1000 100 172 67.5 235
1 1000 160 140 100 65 15 172 67.5 125.3 109.7 78.3 50.9 11.7
3 1000 100 172 63.0 210
1 1000 160 140 100 65 15 172 63.0 112.0 98.0 70.0 45.5 10.5
3 1000 100 172 58.5 190
1 1000 160 140 100 65 15 172 58.5 101.3 88.7 63.3 41.2 9.5
3 1000 100 172 54.0 170
1 1000 160 140 100 65 15 172 54.0 90.7 79.3 56.7 36.8 8.5
3 1000 100 172 49.5 150
1 1000 160 140 100 65 15 172 49.5 80.0 70.0 50.0 32.5 7.5
3 1000 100 172 45.0 130
1 1000 160 140 100 65 15 172 45.0 69.3 60.7 43.3 28.2 6.5
3 1000 100 172 40.5 115
1 1000 160 140 100 65 15 172 40.5 61.3 53.7 38.3 24.9 5.7
3 1000 100 172 36.0 100
1 1000 160 140 100 65 15 172 36.0 53.3 46.7 33.3 21.7 5.0
3 1000 100 172 31.5 87
1 1000 160 140 100 50 15 172 32.5 47.9 41.9 29.9 15.0 4.5
3 1000 100 172 27.0 76
3 1000 160 140 100 65 15 172 17.1 77.0 67.4 48.1 31.3 7.2
Note: (i) n1,t1,s1,a1,d1,p1 highlighted with purple colour are the fixed values and n2,t2,s2,a2,d2 highlighted with orange colour are variable.
(ii) It is assumed that pushup of contact wire due to pantograph will result in same push up of catenary wire also
Clearance Study
UP-1
Encumbrance meter H 0.5 0.5 0.5
Dia of Catenary mm D1 10.5 10.5 10.5
Dia of Contact mm D2 12.24 12.24 12.24
Pre-sag of Contact mm/m S2 0.8 0.8 0.8
Unit wt of contact kg/m q 0.9512 0.9512 0.9512
Unit wt of catenary kg/m p 0.5973 0.5973 0.5973
p1 0.89400404 0.95993827 0.95993827
1.05*(p+q)
Weight of OHE per meter length kg/m P 1.93746424 2.00669519 2.00669519
Span Length meter a 49.5 40.5 40.5
Unsupported wt of CW kg/m w 8*S2*a*T*(a-4.5)*(a-4.5)*1000 0.156 0.200 0.200
32.00 32
Sag of contac wire at mid point mm Smid
4600.00 4690
Height of contact wire at mid span mm Hmid
4270.00 4420
Rolling Stock height mm Hr
Clearance between Contact wire and rolling stock mm Hmid-Hr 330.00 270.00
Clearance Study
UP-1
Encumbrance meter H 0.5 0.5 0.5
Dia of Catenary mm D1 10.5 10.5 10.5
Dia of Contact mm D2 12.24 12.24 12.24
Pre-sag of Contact mm/m S2 0.8 0.8 0.8
Unit wt of contact kg/m q 0.9512 0.9512 0.9512
Unit wt of catenary kg/m p 0.5973 0.5973 0.5973
p1 0.7580842 0.7580842 0.7580842
1.05*(p+q)
Weight of OHE per meter length kg/m P 1.79474841 1.79474841 1.79474841
Span Length meter a 40.5 40.5 40.5
Unsupported wt of CW kg/m w 8*S2*a*T*(a-4.5)*(a-4.5)*1000 0.200 0.200 0.200
32.00 32
Sag of contac wire at mid point mm Smid
4690.00 4690
Height of contact wire at mid span mm Hmid
4420.00 4420
Rolling Stock height mm Hr
Clearance between Contact wire and rolling stock mm Hmid-Hr 270.00 270.00