0% found this document useful (0 votes)
26 views2 pages

battery AT Report of Lon

Uploaded by

anarsaiah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views2 pages

battery AT Report of Lon

Uploaded by

anarsaiah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

BHA SANR NIG LIM

( A Govt of India Enterprise )


Office of the Sub-Divisional Engineer, Sirznagar -504200.

1. Offering Memo & Date: SDE /PPZ/AT/2023-24/ dated at 13/08/2023

2. Accepting Testing of : Battery AT

3. To :SDE(Groups)- Sirp aznagar

4. The following tests are offered/reoffered for the equpt/media/batt below:

Sl.No Equipment Location Qty in Sets Test

Lonavelli BTS –

1 HBL 400AH Battery SUUU SDCA 1 set Test Discharge

Station: : LonBTS
Date: 13-08-2023 Signature of Installer

(To be filled by A/T Officer)

To,
The Installer

1. The Eqpt/media/batt mentioned above has been accepted tested from


............................08:00 AM to18:00 PM.................And
2. Accepted provisionally
3. Returned for the individual fault indicated on reverse
4. Returned for 100% attention due to the following deviation/reasons

Station:UPZ
Date: 13-08-2023 AT Officer

___________________________
Test Discharge Report

Make : HBL Capacity : 400 AH Date of Installation : 11 -08-2023

Location : Lolli BTS, SPUUU Date of Test Discharge : 13-08-2023

9th 10th
Cell 1st 2nd 3rd 4th 5th 6th 7th 8th
initial hour hour
no hour hour hour hour Hour hour hour hour
.'
Time 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00
1 2.27 2.17 2.11 2.08 2.06 2.04 2.01 1.98 1.96 1.92 1.92
2 2.26 2.15 2.11 2.07 2.04 2.01 1.99 1.96 1.93 1.90 1.88
3 2.25 2.14 2.09 2.06 2.03 2.00 1.98 1.96 1.93 1.90 1.89
4 2.26 2.16 2.12 2.08 2.04 2.01 1.99 1.94 1.91 1.87 1.85
5 2.24 2.16 2.10 2.07 2.05 2.01 1.98 1.95 1.91 1.89 1.88
6 2.25 2.14 2.10 2.06 2.03 2.02 1.98 1.94 1.91 1.89 1.86
7 2.25 2.17 2.11 2.06 2.04 2.03 1.99 1.93 1.90 1.88 1.84
8 2.26 2.18 2.14 2.07 2.04 2.01 1.98 1.94 1.90 1.88 1.86
9 2.25 2.17 2.12 2.07 2.02 2.02 1.98 1.94 1.91 1.88 1.85
10 2.24 2.16 2.12 2.07 2.05 2.01 1.97 1.94 1.91 1.88 1.85
11 2.26 2.17 2.10 2.08 2.03 2.00 1.97 1.94 1.91 1.90 1.87
12 2.24 2.15 2.10 2.08 2.02 2.0 1.97 1.94 1.91 1.89 1.85
13 2.24 2.17 2.10 2.06 2.03 2.00 1.97 1.94 1.91 1.89 1.85
14 2.25 2.15 2.13 2.06 2.04 2.01 1.98 1.94 1.92 1.89 1.80
15 2.25 2.16 2.12 2.07 2.04 2.01 1.98 1.94 1.90 1.89 1.86
16 2.25 2.16 2.13 2.09 2.03 2.01 1.97 1.93 1.90 1.88 1.87
17 2.26 2.17 2.14 2.08 2.03 2.00 1.98 1.93 1.90 1.87 1.85
18 2.26 2.18 2.10 2.07 2.04 2.01 1.98 1.93 1.90 1.88 1.85
19 2.25 2.17 2.10 2.07 2.05 2.00 1.97 1.93 1.89 1.87 1.85
20 2.24 2.16 2.12 2.08 2.03 2.0 1.98 1.94 1.89 1.87 1.85
21 2.25 2.16 2.10 2.08 2.03 2.01 1.97 1.94 1.91 1.87 1.84
22 2.25 2.16 1.97
2.12 2.07 2.03 2.00 1.93 1.90 1.87 1.84
23 2.26 2.16 2.10 2.06 2.03 2.00 1.97 1.93 1.89 1.86 1.84
24
2.25 2.18 2.14 2.07 2.04 2.01 1.97 1.93 1.89
1.87 1.85
Total
53.97 51.88 50.68 49.72 48.85 48.22 47.49 46.57 45.77 44.38 44.13