Step up Transformer Sizing Calculation
Step up Transformer Sizing Calculation
Kwon
E 16. Aug.2013 ISSUED FOR APPROVAL D. H. Kim H. B. Kim Y. K. Kwon
D 18. Jul.2013 ISSUED FOR APPROVAL D. H. Kim H. B. Kim Y. K. Kwon
C 30.May.2013 ISSUED FOR APPROVAL D. H. Kim H. B. Kim Y. K. Kwon
B 02.Apr.2013 ISSUED FOR APPROVAL D. H. Kim H. B. Kim Y. K. Kwon
REV. DATE DESCRIPTION DESIGNED CHECKED APPROVED
OWNER
PROJECT
ENGINEER
CONTRACTOR
\
Step-Up Transformer Sizing Calculation
10-BAT-E-49-001-001
31121106/00 23 0
(Old No. : AT-E-49-001-001)
Doc. No. : 10-BAT-E-49-001-001
Rev. No. : 0
INDEX
1. GENERAL .......................................................................................................................................... 2
2. ASSUMPTION ................................................................................................................................... 2
3. SIZING CRITERIA........................................................................................................................... 3
6. ATTACHMENTS .............................................................................................................................. 8
Doc. No. : 10-BAT-E-49-001-001
Rev. No. : 0
1. GENERAL
1.1 PURPOSE
This calculation comply with the latest revision or edition of the following applicable codes and
standards based on SEC-GP-001-R3.
IEC 60076 : Power Transformers
IEEE C 57.116 : IEEE Guide for Transformers Directly Connected to Generators
2. ASSUMPTION
1) Ambient Temperature : 5℃~ 50℃ (according to ITB vol. 2 Technical Schedules – refer to
attachment #3)
2) The calculation is made when the Steam Turbine generator are operated with its rated voltage
3) The Transformer rating shall allow for the full generator utilization (both lag and lead).
8) The transformer will be equipped with number of cooler assemblies to dissipate total losses consisting
of no-load losses and the load losses of the transformer at 1.15 p.u full load at the tap with the highest
Doc. No. : 10-BAT-E-49-001-001
Rev. No. : 0
load losses, without exceeding a hottest spot temperature of 98°C at a design Ambient temperature of
50°C. (according to SEC Standard requested in Addendum 12 – refer to attachment #6)
3. SIZING CRITERIA
The Generator Unit Transformer capacity at ODAF cooling and at specified temperature rises, as well as the
tap changer rating, shall be identical or above the steam turbine capacity at the specified ambient
temperature range.
The STG output capabilities cooling water temperature are as listed below.(Refer to attachment #1)
24.5 757.35
Generator 30 757.35
Operation
35 757.35
39.5 757.35
Actually, however, generator output power is limited by turbine output power.
1) Case 1 : Generator Operation at Rated MW and Rated Power factor (pf : 0.85)
* ST = PN / Power factor = 740.6MW/0.85 = 871.3MVA
In case of IEEE standard, transformer sizing is calculated based on transformer output and by trial
and error method.
RT : Transformer Output(MVA)
1) Case 1 : Generator Operation at Rated MW and Rated Power factor (pf : 0.85)
- Refer to attachment #7 GUT Sizing Sheet
* RT = 820.2MVA
Generator Unit Transformer rated capacity has been calculated in accordance with no loss base
requested by owner. That is selected to be 904 MVA (ODAF) at cooling water temperature
24.5~39.5℃, which has the output capabilities by ambient temperature as listed below.
The Generator Unit Transformer rated capacity has been selected to be 904 MVA (ODAF) at an
ambient air temperature 50 ℃, which has the output capabilities by ambient temperature as listed
below. The transformer will be equipped with number of cooler assemblies to dissipate total losses
consisting of no-load losses and the load losses of the transformer at 1.15 p.u full load.
Doc. No. : 10-BAT-E-49-001-001
Rev. No. : 0
Ambient air
5 10 20 30 40 50
Temperature [℃]
Transformer Output
1348 1304 1217 1113 1026 904
[MVA]
Transformer
continuous operating
1550 1500 1400 1280 1180 1040
capability (1.15pu)
[MVA]
The Generator Unit Transformer rated capacity have 3.8% margin on 50degree C.
Demand Maximum
Transformer Output Margin
Temperature [℃] Transformer Output Remark
[MVA] [%]
[MVA]
50 871.3 (IEC, 0.85 lag) 904 3.8
To verify the adequacy of selected Generator Unit Transformer, the “Coordination Curves
for ST Capability & Generator Unit Transformer Capacity” has been prepared based on the ST
manufacturer’s performance data sheet and the Generator Unit Transformer manufacturer’s
capability curve attached herein.
Doc. No. : 10-BAT-E-49-001-001
Rev. No. : 0
Doc. No. : 10-BAT-E-49-001-001
Rev. No. : 0
6. ATTACHMENTS
ATTACHMENT #1
757.35MW STG Water Cooling Turbine Generator Output Curve.
Doc. No. : 10-BAT-E-49-001-001
Rev. No. : 0
ATTACHMENT #2
Ambient Temperature Curve for GUT transformer
Doc. No.JED-CAC-01-r1
Capacity versus Ambient Temperature Curve for GSU Transformer, 26/380, 904MVA
1800
- Condition-
Max. Ambient temperature : 50℃
1700
Min. Ambient temperature : 0℃
Cooling type : ODAF
1600 Hot spot temperature at abmient temperature
50℃ shall be below 98℃
Continuous loading capability[MVA]
1500
Based on 1.15pu fullload of 904MVA
1400 with spare cooler assemblies
1300
1200
Based on 904MVA without spare cooler assemblies
1100
1000
900
800
0 10 20 30 40 50
Ambient temperature [℃]
Doc. No. : 10-BAT-E-49-001-001
Rev. No. : 0
ATTACHMENT #3
Schedule AA1. Site particulars in ITB Vol.2 Technical Schedules
SCHEDULE AA
GENERAL PARTICULARS
Relative humidity:
1.14 Minimum % 5
Precipitation:
Wind speed:
ATTACHMENT #4
MOM dated 24/25, July. 2013
Doc. No. : 10-BAT-E-49-001-001
Rev. No. : 0
ATTACHMENT #5
STG Vendor E-mail for Generator Output
From: [email protected]
[mailto:[email protected]]
Sent: Friday, July 12, 2013 9:44 PM
To: 김태훈(KIM TAE HUN)/대리/발전플랜트설계부; 김제엽(KIM JE YEOB)/차장/전장설계부;
김대희(KIM DAE HEE)/4 급/전장설계부
Cc: [email protected]; [email protected]; [email protected];
[email protected]; 서정관(SEO JEONG KWAN)/부대/발전플랜트설계부;
김흥복(KIM HEUNG BOK)/부대/전장설계부; 박준영(PARK JUN YOUNG)/대리/전장설계부;
김정수(KIM JEONG SOO)/부장/전장설계부; 한영민(HAN YOUNG MIN)/4 급/전장설계부; a-
[email protected]
Subject: RE: [JSTPP] Request for STG capability (phase arrangement)
Dear Sirs,
When turbine output is maximum (751.6MW), the generator output (not capability) is as follows;
<Calculation condition>
Turbine output : 751.6MW
Power factor : 0.85
<Calculation result>
Generator gross output = Turbine output - Generator loss
743.6MW = 751.6MW - approx. 8MW
****************************
We would like to instruct how to open the attached encryption file that we sent with this e-mail.
Best regards,
N. Kobayashi of MELCO
Doc. No. : 10-BAT-E-49-001-001
Rev. No. : 0
ATTACHMENT #6
SEC Standard for ODAF (item 5 in “GENERATOR UNIT TRANSFORMER Requirements for
ODAF Cooling (Rating ≥ 700MVA)” that is SEC Specification provided by owner at Addendum 12)
GENERATOR UNIT TRANSFORMER Requirements for ODAF Cooling (Rating ≥ 700MVA)
The pump shall be installed in the downstream of oil flow of each unit cooler, not
at top end of unit coolers.
Voltage as given in Layout B, 60 Hz, 3-phase
Insulation class B
Test voltage 2.5 kV
ATTACHMENT #7
GUT Sizing Sheet (Based on IEEE)
STEAM TURBINE GENERATOR(for JSTPP) TRANSFORMER SIZING
3.CALCULATION
G. Output TR Input(TIN(M)) TR Loss(TL1(M)) TR Output(TOUT1(M)) TR Loss(TL2(M)) TR Output(TOUT2(M))
Temp
MW PF MW MVAR MVA MW MVAR MW MVAR MVA MW MVAR MW MVAR MVA
Deg.℃
GOUT(P) GOUT(P) GOUT(Q) TIN(M) TL1(P) TL1(Q) TOUT1(P) TOUT1(Q) TOUT1(M) TL1(P) TL1(Q) TOUT2(P) TOUT2(Q) TOUT2(M)
0.85 740.6 459.0 871.3 1.8297 109.7831 738.7703 349.1996 817.1425 1.7160 102.9600 738.8840 356.0227 820.1840
5 740.6 1 740.6 0.0 740.6 1.5553 114.0524 739.0447 -114.0524 747.7935 1.5704 94.2220 739.0296 -94.2220 745.0118
0.95 740.6 -243.4 779.6 1.6371 120.0552 738.9629 -363.4786 823.5186 1.7294 103.7633 738.8706 -347.1868 816.3752
0.85 740.6 459.0 871.3 1.8297 109.7831 738.7703 349.1996 817.1425 1.7160 102.9600 738.8840 356.0227 820.1840
15 740.6 1 740.6 0.0 740.6 1.5553 114.0524 739.0447 -114.0524 747.7935 1.5704 94.2220 739.0296 -94.2220 745.0118
0.95 740.6 -243.4 779.6 1.6371 120.0552 738.9629 -363.4786 823.5186 1.7294 103.7633 738.8706 -347.1868 816.3752
0.85 740.6 459.0 871.3 1.8297 109.7831 738.7703 349.1996 817.1425 1.7160 102.9600 738.8840 356.0227 820.1840
30 740.6 1 740.6 0.0 740.6 1.5553 114.0524 739.0447 -114.0524 747.7935 1.5704 94.2220 739.0296 -94.2220 745.0118
0.95 740.6 -243.4 779.6 1.6371 120.0552 738.9629 -363.4786 823.5186 1.7294 103.7633 738.8706 -347.1868 816.3752
0.85 740.6 459.0 871.3 1.8297 109.7831 738.7703 349.1996 817.1425 1.7160 102.9600 738.8840 356.0227 820.1840
40 740.6 1 740.6 0.0 740.6 1.5553 114.0524 739.0447 -114.0524 747.7935 1.5704 94.2220 739.0296 -94.2220 745.0118
0.95 740.6 -243.4 779.6 1.6371 120.0552 738.9629 -363.4786 823.5186 1.7294 103.7633 738.8706 -347.1868 816.3752
0.85 740.6 459.0 871.3 1.8297 109.7831 738.7703 349.1996 817.1425 1.7160 102.9600 738.8840 356.0227 820.1840
50 740.6 1 740.6 0.0 740.6 1.5553 114.0524 739.0447 -114.0524 747.7935 1.5704 94.2220 739.0296 -94.2220 745.0118
0.95 740.6 -243.4 779.6 1.6371 120.0552 738.9629 -363.4786 823.5186 1.7294 103.7633 738.8706 -347.1868 816.3752