Index-code Description Unit Quantity Rate Rs. Amount Rs.
No 1 2 3 4 5 6
Plain Cement concrete (1:4:8) using 40 mm
BLD-CSTN-2-4 12 metal with hand mixing upto Plinth level nominal mix Unit = 1cum A. MATERIALS: Cement kg 162.00 4.22 683.64 Coarse aggregate 40 mm cum 0.90 1370.20 1233.18 Fine aggregate (Sand) cum 0.45 2081.00 936.45 Seigniorage charges for C.A cum 0.90 Seigniorage charges for F.A cum 0.45 Water (including for curing) kl 1.20 125.00 150.00 B. LABOUR: Mason 1st class day 0.10 630.00 63.00 Mazdoor (unskilled) day 2.36 525.00 1239.00 Grand Total 4305.27 Contractor proftit @13.615% 586.16 MA @ 40% 520.80 Grand Total 5412.23
Plain Cement concrete (1:4:8) using 40 mm
BLD-CSTN-2-5 13 metal with concrete mixture. All work upto plinth level. Unit = 1cum A. MATERIALS: Cement kg 162.00 4.22 683.64 Coarse aggregate 40 mm cum 0.90 1370.20 1233.18 Fine aggregate (Sand) cum 0.45 2081.00 936.45 Seigniorage charges for C.A cum 0.90 Seigniorage charges for F.A cum 0.45 Water (including for curing) kl 1.20 125.00 150.00 B. MACHINERY Concrete Mixer 10 / 7 cft (02/0.8 cum) capacity hour 1.000 667.50 667.50 C. LABOUR: Mason 1st class day 0.10 630.00 63.00 Mazdoor (unskilled) day 1.39 525.00 729.75 Grand Total 4463.52 Contractor proftit @13.615% 607.71 MA @ 40% 317.10 Grand Total 5388.33 Grand Total Cum 5388.33