0% found this document useful (0 votes)
159 views1 page

pcc 148

Uploaded by

sanjureddy0717
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
159 views1 page

pcc 148

Uploaded by

sanjureddy0717
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

S

Index-code Description Unit Quantity Rate Rs. Amount Rs.


No
1 2 3 4 5 6

Plain Cement concrete (1:4:8) using 40 mm


BLD-CSTN-2-4 12 metal with hand mixing upto Plinth level
nominal mix
Unit = 1cum
A. MATERIALS:
Cement kg 162.00 4.22 683.64
Coarse aggregate 40 mm cum 0.90 1370.20 1233.18
Fine aggregate (Sand) cum 0.45 2081.00 936.45
Seigniorage charges for C.A cum 0.90
Seigniorage charges for F.A cum 0.45
Water (including for curing) kl 1.20 125.00 150.00
B. LABOUR:
Mason 1st class day 0.10 630.00 63.00
Mazdoor (unskilled) day 2.36 525.00 1239.00
Grand Total 4305.27
Contractor proftit @13.615% 586.16
MA @ 40% 520.80
Grand Total 5412.23

Plain Cement concrete (1:4:8) using 40 mm


BLD-CSTN-2-5 13 metal with concrete mixture. All work
upto plinth level.
Unit = 1cum
A. MATERIALS:
Cement kg 162.00 4.22 683.64
Coarse aggregate 40 mm cum 0.90 1370.20 1233.18
Fine aggregate (Sand) cum 0.45 2081.00 936.45
Seigniorage charges for C.A cum 0.90
Seigniorage charges for F.A cum 0.45
Water (including for curing) kl 1.20 125.00 150.00
B. MACHINERY
Concrete Mixer 10 / 7 cft (02/0.8 cum) capacity hour 1.000 667.50 667.50
C. LABOUR:
Mason 1st class day 0.10 630.00 63.00
Mazdoor (unskilled) day 1.39 525.00 729.75
Grand Total 4463.52
Contractor proftit @13.615% 607.71
MA @ 40% 317.10
Grand Total 5388.33
Grand Total Cum 5388.33