0% found this document useful (0 votes)
21 views5 pages

ITP & CL LT Cables 05.05.22

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views5 pages

ITP & CL LT Cables 05.05.22

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

INSPECTION & TEST PLAN for Testing and commissioning of LT Cables

PROJECT: INDIA INTERNATIONAL CONVENTION & EXPO CENTRE (IICC) PROJECT Form No. L&T-IICC-QAQC-ITP-TMP-003

L&T/IICC/QAQC/MEP/MST/ELEC/T&C/008/R2
NAME OF CLIENT: IICC LTD MST / ITP NO:
L&T-IICC-QAQC-ITP-MEP-ELEC-T&C-008-R2

NAME OF PMC : AECOM INDIA PVT LTD REV NO: 0


NAME OF CONTRACTOR: L&T CONSTRUCTION DATE: 05.05.2022
INSPECTION TEST PLAN FOR TESTING AND COMMISSIONING OF LT CABLES
Verification
personal/agency/Surveillance/Review/Hold &
Witness points
COMPONENTS/OPERATIO PARAMETER/CHARATERIS
S. No. METHOD OF CHECK QCP QHP FREQUENCY REFERENCE DOCUMENTS ACCEPTANCE NORM RECORD REFERENCE Remarks
N TICS TO BE CHECKED
Vendor/Sub- Employer/Employe
EPCC
contractor r's Engineer

1 Incoming Testing Equipments

Calibration Certificates, Technical Specs,


a. HV Test Kit Verifying validity of Calibration Inspection Yes Yes Per set Valid Calibration Report. Calibration Report E/W/R R R
Method Statement.

Calibration Certificates, Technical Specs,


b Earth Tester Verifying validity of Calibration Inspection Yes Yes Per set Valid Calibration Report. Calibration Report E/W/R R R
Method Statement.

Calibration Certificates, Technical Specs,


c Megger Verifying validity of Calibration Inspection Yes Yes Per set Valid Calibration Report. Calibration Report E/W/R R R
Method Statement.

Calibration Certificates, Technical Specs,


d Continuity Tester Verifying validity of Calibration Inspection Yes Yes Per set Valid Calibration Report. Calibration Report E/W/R R R
Method Statement.

Calibration Certificates, Technical Specs,


e Polarity Tester Verifying validity of Calibration Inspection Yes Yes Per set Valid Calibration Report. Calibration Report E/W/R R R
Method Statement.

Calibration Certificates, Technical Specs,


f LOTO Kit Verifying validity of Calibration Inspection Yes Yes Per set Valid Calibration Report. Calibration Report E/W/R R R
Method Statement.

Verification as per approved Approved method statement for Verification as per approved
2 Pre Commissioning Checks Inspection Yes Yes Once Checklist Ref.:IICC/MEP/ELEC/LTC/01 E/W/R R W
Checklist. commissioning of LT Panels Checklist.

3 Testing

Approved method statement for


a. Cable Continuity Test Continuity Tester Yes Yes Once Passed. Checklist Ref.:IICC/MEP/ELEC/LTC/01 E/W/R W W
commissioning of LT Panels

Approved method statement for Greater than 25 Meg Ohm +/-


b Cable Insulation Resistance Test Megger Yes Yes Once Checklist Ref.:IICC/MEP/ELEC/LTC/02 E/W/R W W
commissioning of LT Panels Correction factor for temperature

Approved method statement for


c Cable Polarity Test Polarity Tester Yes Yes Once Passed. Checklist Ref.:IICC/MEP/ELEC/LTC/04 E/W/R W W
commissioning of LT Panels

Approved method statement for


d Cable Earthing Value Earth Tester Yes Yes Once Less than 5 Ohms Checklist Ref.:IICC/MEP/ELEC/LTC/01 E/W/R W W
commissioning of LT Panels

Approved method statement for


e Cable HV test Megger Yes Yes Once Pass .Leakage current negligible Checklist Ref.:IICC/MEP/ELEC/LTC/03 E/W/R W W
commissioning of LT Panels

Approved method statement for


4 Cable Installation Final Inspection Inspection Yes Yes Once Passed. Found OK Checklist Ref.:IICC/MEP/ELEC/LTC/01 E/W/R W W
commissioning of LT Panels

NAME Manikandan S Rajesh Kumar L


SIGNATURE
SENIOR MANAGER - MEP Senior DGM - MEP EMPLOYER'S ENGINEER
Prepared By REVIEWED BY APPROVED BY
QCP- Quality Control Point, QHP- Quality Hold Point, W- Witness Point, E- Execute, R- Record Review, RW- Random Witness, TDS: Technical data sheet.
Sensitivity: LNT Construction Internal Use
#
PRECOMMISSIONING OF LT CABLE – Checklist No. IICC/ MEP/ ELEC/ LTC /01

1 Cable Details Date:


i Make :
ii Type :
iii Cable Tag No. :
iv Location / building :
v Size / Length :
vi Rated Volts :
vii Rated Current :
viii Mfg Year :
2 Location & Feeder Name :
3 General Inspection :
Reference Measured
Sl No Check Point Check Point Description Value Value Remarks

Ensure that the LT Cable installation is complete and all civil & electrical
1 Check point-1 Yes
comments on installation IR's are completed & approved.
Ensure that no damage has occurred between mechanical completion & pre
2 Check point-2 Yes -
commissioning.
3 Check point-3 Repair or Replace damaged components, if any. Yes

4 Check point-4 All the cables shall be provided with proper identification/Tagging. Yes -

5 Check point-5 Check & record insulation and continuity values of the cable. Yes

6 Check point-6 Inspect the Cables for correct connection in line with the Single line diagrams Yes -

2degC to 50
7 Check point-7 Ambient Air Temperature in degree C deg C
-

8 Check point-8 Earth Test Value < 5 Ohms -


9 Check point-9 Continuity test Pass/ Fail Pass -

Employer/Emplo
Vendor EPCC
yer's Engineer

NAME

SIGNATURE

DATE

# Sensitivity: LNT Construction Internal Use


TEST REPORT FOR INSULATION RESISTANCE TEST Check List Number : IICC/MEP/ELEC/LTC/02

1 Cable Details Date:


i Make :
ii Type :
iii Cable Tag No. :
iv Location / building :
v Size / Length :
vi Rated Volts :
vii Rated Current :
viii Mfg Year :
2 Location & Feeder Name :
3 General Inspection :
4 Insulation Resistance Test Equipment details
i Make :
ii Range :
iii Serial No. :
iv Calibration Date :

Acceptance
Ref Before HV Test After HV Test
Criterion

R ph to Earth >= 25 M Ohms


Y ph to Earth >= 25 M Ohms
B ph to Earth >= 25 M Ohms
R ph to Y ph >= 25 M Ohms
Y ph to B ph >= 25 M Ohms
B ph to R ph >= 25 M Ohms
R ph to Neutral >= 25 M Ohms
B ph to Neutral >= 25 M Ohms
Y ph to Neutral >= 25 M Ohms

Vendor EPCC Employer/Employer's Engineer

NAME

SIGNATURE

DATE

# Sensitivity: LNT Construction Internal Use


DC High Voltage Test: Check List Number : IICC/MEP/ELEC/LTC/03

1 Cable Details
i Make :
ii Type :
iii Cable Tag No. :
iv Location / building :
v Size / Length :
vi Rated Volts :
vii Rated Current :
viii Mfg Year :
2 Location & Feeder Name :
3 General Inspection :
4 HV Test Equipment details
i Make :
ii Range :
iii Serial No. :
iv Calibration Date :
v Tested Voltage : 3 KV
vi Duration : 15 Minutes

Voltage Applied Leakage Current Acceptance


Result
Ref Criterion
Between in milli Amps
Start Finish
R ph to Earth + Y +
B +N < 20 m A
Y ph to Earth + R +
B+N < 20 m A
B ph to Earth + R
+ Y+ N < 20 m A
Neutral to Earth +
R + Y+ B < 20 m A

Vendor EPCC Employer/Employer's Engineer

NAME

SIGNATURE

DATE
TEST REPORT FOR LT CABLE POLARITY Check List Number : IICC/MEP/ELEC/LTC/04
1 Cable Details
i Make :
ii Type :
iii Cable Tag No. :
iv Location / building :
v Size / Length :
vi Rated Volts :
vii Rated Current :
viii Mfg Year :
2 Location & Feeder Name :
3 General Inspection :
4 Polarity Tester Equipment details
i Make :
ii Range :
iii Serial No. :
iv Calibration Date :

R ph Y ph B ph

Core-1

Core-2

Core-3

Core-4

Core-5

Acceptance Criterion - Positive deflection on the galvanometer

Vendor EPCC Employer/Employer's Engineer