0% found this document useful (0 votes)
48 views1 page

ADIT 3_Trees Data (1)

Uploaded by

shamroz khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views1 page

ADIT 3_Trees Data (1)

Uploaded by

shamroz khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

E: 774800.

036

42 1
N: 31061343.4 6
64

0+
3.2

06
0
9 6 .
SLOPE A3N

: 16+ 0

0+
118

04
0
START POINT ADIT 3
STATION=+43.06
NORTHING=3106172.7097

15
EASTING=774879.3148

EP

.07
BURNING AREA
LOCATION NOT

0+
02
0
CONFIRM

10m TE
PLA
m (SE
CHE E
QUE
NOT
RED
E-13
)
ED

PLA
10m (SE
TE
m
IST OM

CHE NOT
E
QUE E-13
EX Y RO SLOPE A3S

RED )
LL
TA
2#
M

117 TA
LL YR
OO

106

0+
004
E

06
RIDG

ENC ESS
ACC

ASE
D
LAD
DER
H B

SE
CU
G

RIT
WEI

YA
RE
A

EXISTED WA
1 3
EA

TREATMEN R
8 .9
76
R

92

T
TREATMEN
A

TANK
7.
NG

76

T WATER
TATION
NI

2
29

WASHOU
GATE

SEDIMEN
8.
R

76
B U

32
TO

TE
6
13

T
7.

92
7.

76
EXI D

76

0
13

8.

9
A 101

.5
76
STE

8.
LIC F
RO

9
PO ICE O

76

76
S.
E
Y

MT
URIT
SEC OM .

00
D

F
OF

X3.
RO .40 MTS

3.00
ROOGENE 104
X2

4
2.40

82
W

112 500KVA DG AREA

2
BR EIGH

9.
63
R IDGE
500KVA

76
M RATO
3.00 OO

100

8.
M

111
X3.

105
00

76
MT
S

WA
.

TER
R
TE
CONCRE INT
K PO .
CHECX5.0 TAN 1250KVA
0 MTS
5.00

G.L K 10 500KVA 1000KVA


0m³
110

500KVA

500KVA
2
=76

13
9.1

9.
0

76

57
1250KVA 1250KVA 1000KVA 1000KVA

.5
9
76

10

OP AND
102

2.0

.7
%

0
S

77
WA 7 NOS.WATER TANK 200 M3 CAPACITY

LO

12
2.0
P

3# IN ATOR
TER

1
TAN HOISTING AREA

SL

1.

5
OP

6
(15) TRUCK/MACHINE PARKING

77

7
K 4*

LET T
1
E
E

109

3
LIN

103

6
OP

0
50m

DISH

ADITO GENER
ST

END
5

2
.5
³

WA

0
LA
T

PE
DD TRIA POR
ER

77
BR
DE E SU

5
ER

5
MP

ID

6
S
TA

6
RA

7
G

04

7
1

1
NK

65

3
N

4
6
P

6
BR

DISH

DISH
5.0

52

END
ID

END
2.
0

89
GE
T

2
%

2
0.

77
9
SL

6
77

T
0.
OP

2.

5
77
E

ROAD
77
10

1
0m

3
m

6
DIA

DISH
ME MBE
70

END
E
TA DD

72

2
5.0
L T ED
.2

UB

8
E
0

3.
LO
77

77
ING

44
PE

1
2.

48
92

29
77

4
.6

5.0

5.

1
2.

6
5

4
%
9

60

16
2

38

56

56

81

9
77
76

SL

77
RK

.0

.1

.7

.3

.9

.9

.7

.3

.0

.4
OP

8.

8.
9.

2.

6.

2.
24

3
E

77

78
77

77

78

78

78

78

78

78

78

78

79

79

79

79
0

12
2

2.
85

7
P76A

77

3.

84
8.00

8.00

8.00
9.

77

6
3.
8.0

79
8
MAX. CA

28
0 PACITY

E
TRUC 32000

5.
L

41

6
5

4
K PARK

HIN

77
ING

00
86

22

01

60

40

20

80

94

40

80

60

15

65

65
4
8.

0
8.
6.

9.

0.

1.

2.

3.

4.

5.

6.

8.

9.

1.

2.

3.
SLOPE

SLOPE
G.L=77

10
77

78
77

77

78

78

78

78

78

78

78

78

78

79

79

79
5000 LI

4
TRE
4.50

2.

84
ING 1#
14

79
4

G 2#

3.
MP
98

2.
100mm Thick

AC

79
4nos. waste containers and

FIRE PU
77

PARK
0

PARKIN
1.
5000 LI
94
TR E

77
5000 LI
RC Concrete pad 4nos. hazardous waste container

8
1.

2
2

4
TRE

GATE

50
55

99

19
36

31
TRUCK
79

)M

0.
TRUCK

0.

3.

4.
0.

0.
MEETING ROOM

33
OFFICE OFFICE OFFICE

GATE

79
MP

78

78

78
78

79
3.75X12.0 MTS. 3.75X12.0 MTS. 3.75X12.0 MTS.

8
5000 LI

9.
TRE

91

FIRE PU

3
DIESEL

78
5000 LI

3.50X9.0 MTS.
96

3
TRE

6
DIESEL

6
8.

12

32
16
6.
76

90
(12
33.9395

7.
77

2.

6
2.

6
1.
77

94
79

10
FENCE 5000 LI

79
8.00

79
WITH TRE

3.
GATE
4.00

4.
07

79
4.00

79
9.
DIESEL S

SLOPE/1:1
8.00

76
SEPTIC TANK

5
TORAGE 8.00

40

47
3

6
24000 LITRE

87
115

52

68

93

09
8.

DINING HALL

6
.4

0.
GENERATOR

0.

0.

3.

4.
76

0
3.50X9.00 MTS.

79
78

78

78

78

79
ROOM
6.00X10.00 MTS.

GATE

1
4

1
OFFICE OFFICE OFFICE

56
51

72
3.75X12.0 MTS. 3.75X12.0 MTS. 3.75X12.0 MTS.

7.
6.
4

7.

STORAGE AREA 1#
06

77
77

STORAGE AREA 3#
77

STORAGE AREA 1#
GENERATOR

4
41

STORAGE AREA 3#
1
1
90

0
2.
FOR

3.00X3.00 MTS.
PRAYER

36
15
73
.9

76
WORKSHOP

77
1.
108 9

9.0X14.5 MTS.
0.
0.
9.
5.00X5.00 MTS.

0
8.

77
78

9.0X13.5 MTS.
50

00

9.0X14.5 MTS.
79
79
78
8.00

9.0X13.5 MTS.
76

7.

0.
77

78
116

5
TOILET

94
(16)TRUCK PARKING

78
2.44.X6.0 MTS.
MEDICAL

2.
2.

79
79
TOILET ROOM

6
6

33
4.00X6.50 MTS.
5.00X8.50 MTS.

49
10
2.44.X6.0 MTS.

4.
4.
TOILET

OP

79
79
41

2
93

35

56
.1
S H OFFICE OFFICE OFFICE 0

9.

0.

0.
79
K

3
3.75X12.0 MTS. 3.75X12.0 MTS. 3.75X12.0 MTS.

78
114

79

79
SEPTIC TANK
R

RESERVED ROOM

96
81

97

77

93
1.7995
3

LADIES TOILET
WMOTS.

TEA ROOM
24000 LITRE

81

GENTS TOILET

0.
0.

0.

3.

3.
EXISTING CRCC OFFICE

STORAGE AREA 4#
9.

79
78

78

78

78
REFRIGERATOR
1.0000

STORAGE AREA 4#
E

STORAGE AREA 2#
78

D
8.00

STORAGE AREA 2#
HINX35.00
8.00

D
TOILET

9.0X13.5 MTS.
2.44.X6.0 MTS.

1.2m HIGH WALL PARTITION


1.2m HIGH WALL PARTITION

9.0X13.5 MTS.
AC 25.00

D
COMMERCIAL MANAGER
AREA 100㎡.

9.0X15 MTS.
SITE MANAGER

SLOPE/1:1

9.0X15 MTS.
W
M

W
W
W
98
9

4
82

1.2000
1.
2.44.X6.0 MTS.

92
77
TOILET

1.

CONSTRUCTION MANAGER

0.
1

W
77
EXISTING

79
00

COMMERCIAL DEPARTMENT

W
113

3.00X3.00 MTS.
PRAYER
CONSTRUCTION &ENGINEERING TEAM
7.

1.2m HIGH WALL PARTITION


77

1.2m HIGH WALL PARTITION

D
SLOPE

1
1
OFFICE OFFICE OFFICE

62
6

46
19
3.75X6.00 MTS. 3.75X6.00 MTS. 3.75X6.00 MTS.

3.
3.
W
RECEPTION

3.
DD

79
79
MATERIAL

79
W

7
7
DINING HALL

72
STORAGE AREA 5#
D

88
STORAGE

STORAGE AREA 5#
3.50X9.00 MTS.
W

4.
4.
D

79
79
ADMIN DEPARTMENT

1.2m HIGH WALL PARTITION

9.0X13.5 MTS.
1.2m HIGH WALL PARTITION

D
14

9.0X13.5 MTS.
W
STORAGE AREA 11

HSE TRAINING
W
7 77

0
W

0
1

MEETING ROOM

28
8.00

09

25

12
.6 .7
GATE 3 3

14.00X12.00 MTS.

1.
1.

1.

1.
1.2m HIGH WALL PARTITION

3
78 78

79
92

78

78

79
12

3
13

W
W
76

D
1.

OFFICE
PROJECT MANAGER

1
77

1
1.

89
EL781.00 MEETING ROOM

05
SLOPE/1:1
77
MEETING ROOM

MEETING ROOM
AREA 3000 SQM.

4.
3.50X9.0 MTS.

5.
7.50X12.0 MTS.

HSE TEAM

79
ROAD IN THE WORKSHOP

WORK AREA 1#
79
RESERVE AREA

WORK AREA 1#
W

(8)

9.0X30.0 MTS.
W

9.0X30.0 MTS.
EXISTING

W-1
EXISTING

W-1
SEPTIC TANK TOILET

D2
MEETING ROOM

OFFICE-1

STORE 10.5MTS.
1

W-1
WORKS

EPM OFFICE 170㎡


AREA 1670 SQM.

7
37

29
2

W-1

WORK AREA 3#
HOP ST

46

.1
WORK AREA 3#
WORK STATIONS 10 NOS.

4.
1.2m HEIGHT WALL

4
7.

79
79
ORAGE

9.0X18.0 MTS.
77

W-1
4
2

98

58

9.0X18.0 MTS.

10
70
7.5X25

6
OFFICE-2
1#

2
W-1

3
3.

3.
.0 MTS

5.
5.
78

78

79
.

79
CORRIDOR
GENERATOR

W-1
5
3
8.00

6.00X10.00 MTS.
WORKS EL783.50

ROOM
6

96
7

7
PRINTER/ IT ROOM

D4
43
SCANNER

38

54
D1
HOP ST

.5
1.

6
EXISTING SLOPE

1.

1.

1
44
79
KITCHEN

79
D1

78

78
MEETING/DINING
ORAGE

0.
W-1
EXISTING

79
TOILET
D4
D1

60
7.5X25

W-2
TOILETS

20
2#

7
.0 MTS PLATFORM

5
7
44

60
TOILET
D4

5.
.

5.
W-2
D2

SEPTIC TANK
1.

79
1.

79
W-1

78

78

24000 LITRE
Existing CRCC Existing CRCC

WORK AREA 2#
meeting

WORK AREA 2#

WORK AREA 4#
office
PRAYER PRAYER

WORK AREA 4#
room

9.0X13.5 MTS.
9.0X13.5 MTS.
72
2

9.0X13.5 MTS.
81
9.0X13.5 MTS.
8

9
4.
7.5X12 MTS.

4.
7.5X12 MTS.

79
79
STAIR

04
64
3

3
EXISTING SLOPE

92

82

.1
.2
AMBULANCE

6
7.

8.

79
EXISTING EPM OFFICE

79
77

77
2.44.X6.0 MTS. 2.44.X6.0 MTS.

68
TOILET TOILET

0.
78
EXISTING EXISTING

WORKERS

3
3
SLOPE

WORKERS

91
SMOKING

75
AREA

1.
1.

79
FACILITY

79
WELFARE FACILITYWELFARE
2.44.X6.0 MTS. 2.44.X6.0 MTS.
TOILET TOILET

88

8
32
2 .4
28

6.
46 96
240 SQM.

68
AREA

79
4
AREA 240 SQM. .4

6. 7
15

00

.2
5
79

21
5.
16

79

79 5
79
EXISTIN

.6

8
G SLOP

81
E

.2
5
79

6
5.

79
79
ADIT-3 LUP

02
8.00

3
EXISTING

6.
SLOPE

46
WORKERS

79
WORKERS

5.
79

25
FACILITY

4
WELFARE FACILITYWELFAARE

65

1
6.
5.
3

79
79
2 240
AREA 240 SQM.
SQM . ARE

0
80
17

24
9
07

.0

2.
2
1.

79
79
79
1 EXISTING
SECURITY FENCE

4 6

7
ADIT-3 LUP
5

You might also like