2021 Networks SAC 2021 (2)
2021 Networks SAC 2021 (2)
Networks SAC
Name:_____________
Sections 1: Multiple Choice (4marks)
deg 3
3
deg
49
3
deg 2
deg 3
4 3 2 14
O
O
O
O
O O
2 2 1 2 3 1 6
A GD B
0
deg 2
deg 3 v 4
e 6
deg 4 f 4
3
deg
0 5 etc Utf e 2
817 13 2
15 15
1400 M E P O R
1900m E LMN R
Hamiltonian cycle
E P A R O N M L E
Distance 4000 M
path
Eulerian trail L E P LM P N M
trail but need tostart at
can be other L
and finish at M
minimum cat
cut 1 26 19 12 55
Cut 2 26 24 12 62
Cut 3 26 24 11 61
15 24 11 50
It 1 3
It
15 1
II
start
15114 tinist
Ek 11224
1
10
FH
22 hrs
95 hrs
14 5 9 hrs
B D I R
minimum completion time 35 hrs
Thecriticalpath is changed to C H J
and the completion time 37 hrs increase by
2 hrs
43 25
56 32
1 2 3 4 1 2 3 4
A 0 18 1 6 A 0 17 0 5
0
B 2 0
1 0 B 3 1 0
c o 19 9 2 c o 18 6 1
D 4 0 0 1 D 5 0 0 1
A 1 A Type
B 2 B Typed
c 3
c
D
Typel
4 D
Types
50 39 28 32 149
24900
END OF SAC
Total Marks /45