0% found this document useful (0 votes)
25 views2 pages

Bnp Mpr Report

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views2 pages

Bnp Mpr Report

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Date: 05/11/2024 Revision No.

: 00

Issued by : Ascentis Page No.: 1 of 1

Report Monthly Performance Report-Safety

Name of the Project: Alila Igatpuri


Financial Year 2024 Construction Area: 20000 sq. Mtr. NO of building : 40 room
To 2025
PMC Project Manager: Vikash Sabale Contractor's Project Manager: SWIPNIL KHANDIJOD

Sr. No. Element Month's


Cumulative for Cumulative for
Current Year Project
1 Statistics Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25

Avg. No. of Staff per day


1.1 NA 0
(Sai Interprises)

Avg. No. of Staff per day


1.2 NA 0
(Ascentis PMC)

Avg. No. of Staff per day


1.3 7 7
(Contractors)

Avg. No. of Worker per day


1.4 30 30
(Contractor)

1.5 Man-days Worked 900 900

1.6 Man-hours Worked 9000 9000

1.7 Reportable Accidents 0 0

1.8 Fatal / Total Permanent Disability 0 0

1.9 Dangerous Occurrences. 0 0

1.10 First aid- injury cases 0 0

1.11 Fire Incidents 0 0

1.12 Near Miss Incident 0 0

1.13 Man-days Lost due to reportable 0 0

1.14 Safe Man-hours without Reportable Incident 9000 9000

2 Training/ Safety Induction / Tool Box-cum Pep


Talk/Motivation & Pramotion

2.1 Safety Induction of staff & Worker(No. of Session) 3 3

2.1.1 Safety Induction of staff & Worker (Attendees) 20 20

2.2 Daily Toolbox / Pep Talk(No. of Session) 7 7


2.2.1 Toolbox / Pep Talk(Daily) ( Avg. Attendees per day) 79 79

2.3 Training External/Internal(No. of Session) 1 1

2.3.1 Training External/Internal(Attendees) 36 36

No. of motivation & promotional activity carried out(furnish


2.4 0 0
detail in Anx-2)

3 Safety Committee / Inspection /Audits / Drills

3.1 Jt. Project Safety Committee Meetings (Monthly) 1 1

3.1.1 Issues discussed 5 5

3.1.2 Issues resolved 4 4

3.1.3 Issues pending 1 1

3.1.4 Contractor's Safety Committee Meetings 2 2

Safety Inspection & Audit as per Monthly Safety Activity


3.2 0 0
Planner excluding activity of Sr, no. 3.1, 3.3, 3.4, 3.6

3.2.1 Observations recorded 5 5

3.2.2 Observations complied 4 4

3.2.3 Observations pending for Compliance 1 1

3.3 Rapid Safety Rapid Audit (Fortnightly) by PMC 0 0

3.3.1 Observation Raised) 0 0

3.3.2 Observation complied 0 0

3.3.3 Observation pending 0 0

4 Environment Monitoring

Ambient Air & Noise Pollution Monitoring Survey (Six


4.1 0 0
Monthly) & Controls Applied

5 Safety Resources 0

No. of safety personal including qualified safety engineer;


5.1 2 2
supervisor/steward & first aider in nos.(furnish detail in Anx-5)

6 Health & Hygiene

Medical Examination of Operator; Driver; Signalman;


6.1 Technician. 0 0

Comments by PMC Site Head/PMC Safety Engineer

DECLARATION

A) Required Personal Protective Equipments (PPE'S) has been provided by the Contractors to all concern & usage ensured.

B) Necessary Safety Induction & Skill Training is provided by the Contractors to all concern.

C) Third Party Inspection : All lifting tools-tackle & equipments are tested & certified by competent person on 12 monthly basis.
SIGNATURE SAFETY INCHARGE(Contractor) SIGNATURE PROJECT INCHARGE (Contractor) SIGNATURE SAFETY INCHARGE(PMC) SIGNATURE PROJECT INCHARGE(PMC)