0% found this document useful (0 votes)
60 views8 pages

BQ q240237 r4 2 Masjid Nurul Iman, Jeram Design B PVC 3mm + Lampu

Uploaded by

arif.artseven
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views8 pages

BQ q240237 r4 2 Masjid Nurul Iman, Jeram Design B PVC 3mm + Lampu

Uploaded by

arif.artseven
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

QUOTATION

KERJA-KERJA DEKORASI DI : Q240237 -R4-2 RM 30,000.00


MASJID NURUL IMAN, JERAM (INDOOR) DESIGN B (+PVC 3MM & LAMPU)
ATTENTION TO : HAJI KHAIRANI A. RUANG BAHAGIAN HADAPAN
NO. TELEPHONE : 019-241 3814 B. PEMBERIAN DARI ARTSEVEN
DATE : 26/11/2024
SUPPLY & INSTALL

A RUANG BAHAGIAN HADAPAN

1 - MIHRAB
Item Description Unit Quantity Rate Amount REMARK

Kerja membekal dan memasang KERAWANG

Material : PVC BOARD


Thickness : 10 mm
Finishing : Spray & Paint Matt Finishes
a
Method : Attach to Wall with X Bond

KERAWANG
Size (Feet) : i) 3.7 x 6.9 ( 1 Nos ) 25.53 sqft 25.53 70 1,787.10

Kerja membekal dan memasang KALIMAH ALLAH


Material : PVC BOARD
Thickness : 3 mm
b Finishing : Spray & Paint Matt Finishes sqft 2.25 70 157.50
Method : Attach to Wall with X Bond

Size (Feet) : i) 1.5 x 1.5 ( 1 Nos ) 2.25

Kerja Wiring, Hacking, skim dinding dan memasang LED STRIP


beserta Power Supply

c Type : LED COB STRIP (WARM)

Size (Feet) : i) 25 ( 1 Nos ) 25 sqft 25.00 18 450.00

Kerja wiring & penyelenggaraan keseluruhan di bahagian dinding


hadapan kiri kanan, gateway & mihrab
* MAX JARAK ALIH HANYA 3FT dari tempat asal

- Plug dan Wire : Kedudukan ditentukan pada pihak Artseven


mengikut kesesuaian
- Mimbar : Cabut sahaja
- TV 1 unit : Kedudukan ditentukan pada pihak Artseven mengikut
kesesuaian
- Jam Solat 1 unit : Kedudukan ditentukan pada pihak Artseven
mengikut kesesuaian
d - Jam Dinding 1 unit : Kedudukan ditentukan pada pihak Artseven unit 17 800 800
mengikut kesesuaian
- Speaker 2 unit : Kedudukan ditentukan pada pihak Artseven
mengikut kesesuaian
- Kipas Dinding 2 unit : Kedudukan ditentukan pada pihak Artseven
mengikut kesesuaian
- Frame Kalimah 7 unit : Kedudukan ditentukan pada pihak Artseven
mengikut kesesuaian
- Meja Kuliah 1 unit : Kedudukan ditentukan pada pihak Artseven
mengikut kesesuaian
- Jam Berdiri 1 unit : Kedudukan ditentukan pada pihak Artseven
mengikut kesesuaian

TOTAL : RM3,194.60

Page 1 of 8
2 - GATEWAY
Item Description Unit Quantity Rate Amount REMARK
Kerja-kerja membuat struktur & mengecat dinding baru di DINDING
HADAPAN masjid
Material : Gypsum Board 9MM
Finishing : Matt Finishes
a Method : Box up Structure

Size (Feet) : i) 1.5 x 10 ( 2 Nos ) 30 sqft 74.67 25 1,866.75


ii) 9.3 x 1.5 ( 1 Nos ) 13.95
iii) 4.8 x 3.2 ( 2 Nos ) 30.72

Kerja membekal dan memasang KERAWANG DAN KALIMAH

Material : PVC BOARD


Thickness : 3 mm
Finishing : Spray & Paint Matt Finishes
Method : Attach to Wall with X Bond

b KERAWANG sqft 65.72 70 4,600.40


Size (Feet) : i) 4.8 x 3.2 ( 2 Nos ) 30.72
ii) 1 x 10 ( 2 Nos ) 20
iii) 4 x 1 ( 2 Nos ) 8
iv) 1.5 x 1 ( 2 Nos ) 3
KALIMAH
v) 4 x 1 ( 1 Nos ) 4

Kerja membekal dan memasang BINTANG GOLD


Material : Acrylic Mirror Gold
Thickness : 2 mm
c Method : Attached To Wall

Size (Feet) : i) 0.4 x 0.4 ( 10 Nos ) 1.6 sqft 1.60 70 112.00

Kerja membekal dan memasang CORNICE pada bahagian atas


Gateway
Material : Plaster C779
Type : 218 mm
d Finishing : Matt Finishes
Method : Attached To Wall

Size (Feet) : i) 10 x 1 ( 1 Nos ) 10 sqft 10.00 30 300.00

TOTAL : RM6,879.15

Page 2 of 8
3 - BAHAGIAN KIRI
Item Description Unit Quantity Rate Amount REMARK
Kerja-kerja membuat struktur & mengecat dinding baru di Dinding
Hadapan Kiri
Material : Gypsum Board 9MM
a Finishing : Matt Finishes
Method : Box up Structure

Size (Feet) : i) 14.8 x 2 ( 1 Nos ) 29.6 sqft 29.60 25 740.00

Kerja membekal dan memasang KERAWANG, KALIMAH dan FRAME

Material : PVC BOARD


Thickness 3 mm
Finishing : Spray & Paint Matt Finishes
Method : Attach to Wall with X Bond

KERAWANG
b
i) 1.5 x 4 ( 1 Nos ) 6 sqft 68.60 70 4,802.00
ii) 14.8 x 2 ( 1 Nos ) 29.6
KALIMAH
iii) 2 x 1 ( 2 Nos ) 4
iv) 10 x 1.5 ( 1 Nos ) 15
FRAME
v) 7 x 1 ( 2 Nos ) 14

Kerja membekal dan memasang KERAWANG

Material : PVC BOARD


Thickness 10 mm
c Finishing : Spray & Paint Matt Finishes
Method : Attach to Wall with X Bond

Size (Feet) : i) 7 x 3.2 ( 2 Nos ) 44.8 sqft 44.80 70 3,136.00

Kerja membekal dan memasang SKIRTING

Material : PVC
Type : 100 mm
c Finishing : Paint Matt Finishes
Method : Attach to Wall with X Bond

Size (Feet) : i) 15 x 1 ( 1 Nos ) 15 sqft 15.00 30 450.00

Kerja membekal dan memasang WAINSCOTING WHITE


Material : PVC
Type : 61mm
Finishing : Paint Matt Finishes
d Method : Attach to Wall with X Bond

Size (Feet) : i) 19 x 1 ( 1 Nos ) 19 sqft 44.00 30 1,320.00


ii) 25 x 1 ( 1 Nos ) 25

Kerja membekal dan memasang WALL LIGHT


Material : LED Downlight light (warm)
e Type : W1000/1 (Black Holder)

Unit : i) 2 Nos 2 unit 2.00 100 200.00

TOTAL : RM10,648.00

Page 3 of 8
4 - BAHAGIAN KANAN
Item Description Unit Quantity Rate Amount REMARK
Kerja-kerja membuat struktur & mengecat dinding baru di Dinding
Hadapan Kanan
Material : Gypsum Board 9MM
a Finishing : Matt Finishes
Method : Box up Structure

Size (Feet) : i) 14.8 x 2 ( 1 Nos ) 29.6 sqft 29.60 25 740.00

Kerja membekal dan memasang KERAWANG, KALIMAH dan FRAME

Material : PVC BOARD


Thickness : 3 mm
Finishing : Spray & Paint Matt Finishes
Method : Attach to Wall with X Bond

KERAWANG
b
ii) 1.5 x 4 ( 1 Nos ) 6 sqft 68.60 70 4,802.00
iii) 14.8 x 2 ( 1 Nos ) 29.6
KALIMAH
iv) 2 x 1 ( 2 Nos ) 4
v) 10 x 1.5 ( 1 Nos ) 15
FRAME
vi) 7 x 1 ( 2 Nos ) 14

Kerja membekal dan memasang KERAWANG

Material : PVC BOARD


Thickness 10 mm
c Finishing : Spray & Paint Matt Finishes
Method : Attach to Wall with X Bond

Size (Feet) : i) 7 x 3.2 ( 2 Nos ) 44.8 sqft 44.80 70 3,136.00

Kerja membekal dan memasang SKIRTING

Material : PVC
Type : 100 mm
c Finishing : Paint Matt Finishes
Method : Attach to Wall with X Bond

Size (Feet) : i) 15 x 1 ( 1 Nos ) 15 sqft 15.00 30 450.00

Kerja membekal dan memasang WAINSCOTING WHITE


Material : PVC
Type : 61mm
Finishing : Paint Matt Finishes
d Method : Attach to Wall with X Bond

Size (Feet) : i) 19 x 1 ( 1 Nos ) 19 sqft 44.00 30 1,320.00


ii) 25 x 1 ( 1 Nos ) 25

Kerja membekal dan memasang WALL LIGHT


Material : LED Downlight light (warm)
e Type : W1000/1 (Black Holder)

Unit : i) 2 Nos 2 unit 2.00 100 200.00

Kerja mengecat dinding pada bahagian Mihrab, Gateway, Dinding


Kanan dan Dinding Kiri

Material : Wall Painted


Type : JOTUN
f
Size (Feet) : i) 9.3 x 11 ( 1 Nos ) 102.3 sqft 564.30 5 2,821.50
ii) 10 x 11 ( 1 Nos ) 110
iii) 16 x 11 ( 2 Nos ) 352

TOTAL : RM13,469.50

Page 4 of 8
B PEMBERIAN DARI ARTSEVEN

Kerja membekal dan memasang STIKER pada Pintu Kabinet

Material Sticker (Print on white film sticker)


a Method : Attached to Cabinet Door Glass

Size (Feet) : i) 6.9 x 4 ( 2 Nos ) 55.2 sqft 55.20 FOC FOC

Kerja mengecat FRAME KABINET WARNA PUTIH

b
Size (Feet) : i) 7.3 x 4.4 ( 2 Nos ) 64.24 sqft 64.24 FOC FOC

TOTAL : RM0.00

GRAND TOTAL : RM 34,191.25


DISCOUNT : RM 4,191.25
AFTER DISCOUNT : RM 30,000.00

Page 5 of 8
PAYMENT TERMS

Terms Payment for Supply & Install


a) 50 % Upon Confirmation - RM 15,000.00
BANK DETAILS :
(Site Measurement, Projek Timeline, Workplan, Detail Drawing, Site Briefing and Approval)
b) 40 % Upon Start Installation - RM 12,000.00 MAYBANK
(Material Drawing, Preparation and Delivery Ready Item and Start Installation) ARTSEVEN GROUP SDN BHD
c) 10 % After Handover - RM 3,000.00 5622 7263 7639
TOTAL = RM 30,000.00

• Client should make sure the details on every stated item are correct and according to what have been decided.
• Client must sign the quotation when all details are agreed.
• Production will begin after we have receive a Sign Quotation from Client with deposit payment.
• The above quotation does not include for the Contractor All Risks Insurance.
• We will not be held liable for any delay in handover if got changes made after approval.
• All measurement are subjected to site condition. If there is any changes required, price shall change accordingly to agreed contract rate.
• Any changes of measurement and design especially for customer or built in item, should be confirmed before production started.
• We entitled to not make any refund and extra charges will be applied if any changes made after production started.
• Delays in delivery should be expected due to weather cause
• Client must have a place for Production to store Materials at the site if not we will not be responsible for any loss of stocks at the site after the
delivery.
• We only refund 70% from payment received if the order was cancelled before production started.
• We only refund 50% from payment received if the order was cancelled after production started.
• This quotation will be valid for 30 days only.
• If the client delays the payment after completion date, 10% charges will be added in every 7 days of delay.
• We are allowed to take back or remove the product from the client's possesion if the terms and condition is violated.

Warranty : 6 month (after Handover)

Supply, Delivery and Installation Lead Time


Productions and Installation : 5-6 weeks (not include public holidays)

Thank you.
I/We undersigned hereby acknowledge and confirm that all amount and
conditions stated in the quotation are accepted and agreed upon.
Prepared By :
Nur Fasihah
Quantity Surveyor

Verify By : Company Chop / Signature


Name as per IC :
Faisal Alwie
Managing Director Artseven Group Date :

Page 6 of 8
PROSES GERAKAN KERJA ARTSEVEN GROUP

Quotation / Design Proposal


Ukuran diambil untuk penyediaan “Quotation & Design Proposal”. Perubahan harga boleh berlaku jika didapati ruang asal telah diubah selepas sebut
harga dan design dikeluarkan. Penyediaan “Quotation & Design Proposal” akan mengambil masa 7-14 hari bergantung kepada design, pengumpulan
maklumat yang lengkap dan perkadaran ruang

Pembayaran Deposit
Kerja-kerja hanya bermula selepas menerima pembayaran deposit dan tandatangan setuju terima dengan sebut harga. Sebut harga yang telah
dipersetujui tidak boleh diubah atau dikurangkan. Jika ada penambahan lain, akan diberikan sebut harga baru untuk penambahan. Akan ditubuhkan
juga satu “WhatsApp Group” bersama bagi tujuan menyampaikan dan berkongsi perkembangan kerja.

Penyediaan Drawing / Project Timeline (CPM)


Setelah deposit dibuat, pasukan yang bertanggungjawab melaksanakan kerja-kerja pemasangan akan membuat semakan ukuran dan meninjau tapak
kerja bagi memastikan maklumat tepat dan seterusnya menyediakan keseluruhan “Drawing” dan “Project Timeline”untuk rujukan. Tempoh proses ini
mengambil masa 1-7 hari.

Proses Penyediaan Bahan


Pada masa penyediaan dokumen diatas, kerja-kerja penyediaan bahan dan perancangan kerja juga akan berjalan. Untuk beberapa situasi atau bahan, ada
yang perlu pengesahan pelanggan sebelum meneruskan proses ini. Contohnya, untuk dekorasi yang melibatkan Kalimah atau potongan Ayat Al-Quran
di Surau/Masjid, perlu disahkan supaya susunan dan kaedah kaligrafi tersebut adalah betul dan boleh diterima pakai di Surau/Masjid. Penyemakan dan
pengesahan akan dibuat kepada Jabatan Mufti juga Persatuan Seni Khat Kebangsaan Malaysia. Untuk tempoh proses penyemakan tulisan ini boleh
mengambil masa 1-2 bulan kerana mengikuti prosedur yang ditetapkan oleh organisasi tersebut. Namun jika pihak Surau/Masjid memiliki kepakaran
untuk mengesahkan betul, proses tersebut boleh dipercepatkan kepada langkah seterusnya.

Proses Pemasangan
Kerja pemasangan hanya akan dibuat setelah pelanggan sedia maklum dan memberi pengesahan pada lampiran kerja yang akan diberikan bagi
memastikan tiada berlaku kesilapan pada tempoh pemasangan. Pelanggan perlu memberi maklumat waktu kerja yang dibenarkan dan juga maklumat
lain jika ada. Jika ada perubahan yang ingin dibuat semasa proses pemasangan, perlu dimaklumkan dan bincang dahulu kerana perubahan dalam
tempoh tersebut adalah tidak digalakkan kerana akan mengganggu kelancaran kerja.

Inspection / Quality Check


Setelah kerja pemasangan selesai, akan diadakan satu sesi bersama untuk memeriksa hasil kerja. Jika ada sebarang masalah boleh diperbetulkan dalam
tempoh tersebut.

Handover
Setelah segala kerja dilakukan dengan baik dan puas hati, akan diberikan satu borang tanda setuju selesai kerja-kerja yang diamanahkan. Pihak syarikat
akan memberikan Surat Waranti dan segala kerja diiktiraf selesai dengan jayanya.

Page 7 of 8
A RUANG BAHAGIAN HADAPAN

1 - DEKORASI DINDING

Page 8 of 8