2. Baseline configuration for Plant in Production Planning (PP)
2. Baseline configuration for Plant in Production Planning (PP)
Let's carry on with the remaining baseline configuration and then we will set up the master data, which will be required to run the end to end process
production planning;
Define Person responsible for WorkCentre - Person or group of people responsible for maintaining the master data in certain work centers. These employees are not
responsible for planning tasks but only for the maintenance of the work center parameters.
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 1/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
MRP Controller - We will create MRP controller each for Raw, Semi-finished and Finished Materials.
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 2/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
Floats
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 3/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 4/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
Start in Past
Available stock
MRP Group - MRP Group can be assigned to materials for which you want to override the plant parameters. You can make the MRP group default at Material type also.
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 5/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 6/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
OPJH – Order Types - Order type controls the parameters like; Number range for the orders, Which criteria is used when selecting routing, How the order is costed.
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 7/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 8/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
OPL8- Order Type Dependent Parameters - Copy all existing order types of 1710 plant to your plant. Dependent parameters are as follows;
1. Production version should be manual or automatic
2. Routing selection ID
3. BOM Application
4. Batch Determination - selection procedure
5. Cost Accounting - Costing variants for planned and actual costing
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 9/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 10/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
OPJK- Order Control during Release - Copy all from 1710 plant. This configuration will decide when system should consider availability check of raw materials; 1. During
Creation or 2. During Release.
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 11/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
3. Over-delivery
4. Dates in Future
5. Which confirmation system should propose - Partial or final or auto-final
6. Error handling/logs for actual cost and goods movement
7. Individual entries of operation
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 13/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 14/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
OPU3- Scheduling Parameters for Production order - Copy all from 1710 plant. This configuration determines following things for order type against plant & production
supervisor combination.
Default scheduling type; e.g. Backward, Current Date etc.
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 15/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 16/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
OPKP- Production Scheduling Profile - This enables the system to perform specified automatic actions while creation and release of production order like; auto GR,
auto release of order upon creation, document updating and capacity & material availability check etc. Create your own for MTS by copying 1710.
1. It defines when system should create auto batch at order creation or order release or it should not allow auto batch creation.
2. Whether auto goods movement enabled.
3. Overall profile for capacity planning.
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 17/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 18/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
OPJ9- Define Production Supervisor - New entry creation. Create 2 production supervisor with different production profile- one with TJ0001 auto-release and second
one with TJ0002 no auto-release.
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 19/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
OPK9- Assign Valuation Variant to Valuation Area - OY1, OY2 OY6 & OY7
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 20/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 21/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
2. Allocation structure (YP) - Source - Other CP area (ASK1) - cost element group (YB_ALL) - Settlement cost - (PSG, CTR & ORD)
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 22/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 23/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
This was basic configuration required from SAP PP point of view. We will discuss Master data maintenance in upcoming blog. Stay connected! :)
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 24/25
11/18/24, 9:18 PM 2. Baseline configuration for Plant in Production Planning (PP)
https://www.sastrageek.com/post/2-master-data-preparation-and-baseline-configuration-for-production-planning-pp 25/25