121.85 m3 Total volume of pit excavation
5,525.00 m3
5,525.00 m3 Total volume of backfill under hard core
2. MASONRY WORK
50 cm thick external stone well bedded in cement
sand mortar 1:3,between foundation columns and
below pavement.consider 100cm depth below
2.1 pavement level. M3 45.88 6790 311,525.20
Ditto as item No.2.1, but with dressed stone, above -
2.2 pavement level. M2 - 5200 -
Total to Summary……………………………. …………………….Birr 311,525.20
3. CONCRETE WORK
3.1 5cm thick lean concrete in C-5 with minimum
cement content of 150Kg/m3under:
Total to Summary……………...…………..……… -
B. SUPER STRUCTURE
1. CONCRETE WORK
1.1 Reinforced concrete quality C-25 with 360kg
cement/M3 of concrete filled in to formwork
and vibrated around rod reinforcement bars.
(Steel and form work measured separately)
2. BLOCK WORK
Total to Summary………………………….
……………………….Birr 145,750.50
3.ROOFING
G-28 CIS Roof covering in galvanized corrugated
m2 118 1532 180776
production nailed on zigba purlin. Price shall
include ridge cover and roof measured in
3.1 horizontal projection. & purlin measured separately
Supply and fix G-28 galvanized flat metal sheet gutter as with development
length of 500cm .Spliced at joints and welded and given 3 coat of oil
paint.Aminimum slope of 0.5% to wards down pipe should be provided
3.2 ml 20 797 15940
Supply and fix 110mm diameter PVC down pipe . Provide the necessary
metal straps for anchorage spaced at 100cm distance.Price shall include
rain water strainer at the inlet of the down pipe and 3 coats of synthetic
enamel paint.
3.3 Ml 64 334 21376
Provide G-28 galvanized sheet metal flashing well anchored to wall
3.4 surface. Ml 0 680 0
Total to Summary………………………….
……………………….Birr 218,092.00
Doors
5.2 WINDOWs
5.5 Supply and fix guard rail complete with all accesso
ries.Quality and type to be approved by the engneer m 50 1800 90000
Total to Summary…………….……………… 264,720.00
6 . FINISHING WORK
6.3 Ditto as item No 6.1but to reinforced concrete ceiling m2 158.3 440 69652
Flooring
7.Glazing
4mm thick clear glass free from defects fixed to metal
7.1 windows and doors. m2 34.815 2350 81815.25
8. Painting
Apply three coats of plastic paint of chosen type and
8.1 colour to all plastered surface of walls. m2 285 285 81225
8.4 Ditto as item item 8.1but to chip wood ceiling m2 158.3 187 29602.1
SUMMARY
A-SUB STRUCTURE
B-SUPER STRUCTURE
3 ROOFING BIRR
7 GLAZING………………………………………………………… BIRR
8 PAINTING……………………………………………………….. BIRR
311,525.20
332,944.20
153,210.62
145,750.50
218,092.00
1,055,497.00
264,720.00
838,518.50
81,815.25
170,515.40
100,000.00
3,028,119
3,361,063
504,160
3,865,223
A. SUB STRUCTURE
2. MASONRY WORK
3. CONCRETE WORK
5cm thick lean concrete in C-5 with
3.1 minimum
cement content of 150Kg/m3under:
al to Summary……………...…………..………
B. SUPER STRUCTURE
1. CONCRETE WORK
Reinforced concrete quality C-25 with
1.1 360kg
cement/M3 of concrete filled in to
formwork
and vibrated around rod reinforcement
bars.
(Steel and form work measured
separately)
c.In top tie beam M3 3.728 10235
2. BLOCK WORK
In addition to strength, size, and other
specified
requirements HCB blocks must satisfy
the weight
requirements specified in EBCS - 1,
1995.
20cm thick class-B H.C.B wall bedded
2.1 and
Joined in cement mortar mix 1:3 both
sides
left for plastering. m2 152.25 948
Total to Summary………………………….
……………………….Birr
3.ROOFING
G-28 CIS Roof covering in galvanized
corrugated
production nailed on zigba purlin. Price shall m2 118 1532
include ridge cover and roof measured in
horizontal projection. & purlin measured
3.1 separately
Supply and fix G-28 galvanized flat metal sheet
gutter as with development length of
500cm .Spliced at joints and welded and given 3
coat of oil paint.Aminimum slope of 0.5% to
wards down pipe should be provided
3.2 ml 20 797
Supply and fix 110mm diameter PVC down
pipe . Provide the necessary metal straps for
anchorage spaced at 100cm distance.Price shall
include rain water strainer at the inlet of the
down pipe and 3 coats of synthetic enamel paint.
3.3 Ml 64 334
Provide G-28 galvanized sheet metal flashing
3.4 well anchored to wall surface. Ml 0 680
Total to Summary…………………………. ……………………….Birr
Total to Summary…………….………………
……………………….Birr
Aluminum Work
Window
All windows and door are
manufactured from Aluminum
metal profiles.(or equivalent product
approved by the
architect.) All works should be cut and
assembled
to sizes and shapes of the window and
door schedule
5.2 WINDOWs
Flooring
7.Glazing
4mm thick clear glass free from
defects fixed to metal
7.1 windows and doors. m2 34.815 2350
Total to Summary…………….………………
8. Painting
Apply three coats of plastic paint of
chosen type and
Total to Summary…………….………………
AMOUNT
4824
6,532.50
10,875.00
10,875.00
22,231.50
311,525.20
-
-
311,525.20
-
-
-
-
-
0
0
38,156.08
12599.475
28170
0
66490
0
0
145,415.13
144,333.00
144,333.00
180776
15940
21376
0
218,092.00
14800
11480
52150
0
277875
356,305.00
174720
90000
264,720.00
135090
135090
135090
69652
22724
85500
102895
49500
74530
674,981.00
81815.25
81,815.25
81225
65467.5
29602.1
176,294.60
Project Name:- public Library at A/boku greenery
Owner:- Bedele Administration Office
Location:- Bedele Town At A/Boku Kebele
SUMMARY
A-SUB STRUCTURE
3 CONCRETE WORK………………………………BIRR -
B-SUPER STRUCTURE
5 Alunium WORK……………………………………
BIRR 264,720.00
8 PAINTING……………………………………………
BIRR 176,294.60