0% found this document useful (0 votes)
13 views1 page

3516 wiring edited

Uploaded by

amir davarzani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views1 page

3516 wiring edited

Uploaded by

amir davarzani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

0 1 2 3 4 5 6 7 8 9

SYNC SW A SYNCA CUSTCONN -Q1 SYNCA TO ADEMS


-X1 -U101 -U101 PRIMARY -ECM J1
Z 1 P715-G9 1 2 N715-G11 17
-U102:62
SW9 PULL UP SYNC SW A
CUSTOMER /1.0 local remote throttle switch /1.0
/1.2 local panel

POWERED RESET
-X2 JTS -ECM J1
Z
-U202:62
SW9 PULL UP SYNC SW A
CUSTOMER
/2.2

POWERED RESET CUT


-X2 JTS -ECM J1
Z
-U202:62
CUTING ON LEFT RAIL SW9 PULL UP SYNC SW A
CUSTOMER
/2.2

BEFOR CONECTION IS TO PIN 6 OVERSPEED CONTROL -Q1 BEFOR CONECTION IS TO PIN 7 OVERSPEED CONTROL
-U203 -U201 -U201 -U203
41 41 6 5 40 40

MPD CONNECTOR RAIL LEFT MPD CONNECTOR PANEL local remote throttle switch MPD CONNECTOR PANEL MPD CONNECTOR RAIL LEFT
/2.3 /2.0 local panel /2.0 /2.3

4 6
Date 1/25/2023 EPLAN EPLAN Software & Service edit jts =
Ed. mrdav +
GmbH & Co. KG
Appr Project template with IEC identifier structure IEC_tpl001 Page 5
Modification Date Name Original Replaced by Replaced by Page 11

You might also like