APPROVED (0) - G71770-AC 281-V181-J04 - Grade Slab DWG For GIS BLDG - R0

Uploaded by

Nikhil Poriya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
244 views1 page

APPROVED (0) - G71770-AC 281-V181-J04 - Grade Slab DWG For GIS BLDG - R0

Uploaded by

Nikhil Poriya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A'

IMPORTANT NOTES
A A GENERAL
A 1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE SPECIFIED & LEVELS ARE IN
METER.
2. DO NOT SCALE THE DRAWING, ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED.
3. THE DRAWING MUST BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWING
i.e ARCHITECTURAL, ELECTRICAL & STRUCTURAL DRAWING. (GA DRAWING OF
MANUFACTURER).
B CONCRETE
4. THE CEMENT SHALL BE ORDINARY PORTLAND CEMENT WITH C3A CONTENT FROM 5 TO
8 % FOR ALL CIVIL WORK.
5. ALL THE RCC WORK SHALL BE CARRIED OUT AS PER IS 456-2000, WITH LATEST
REVISION.
B B 6. THE GRADE OF CONCRETE SHALL BE M-30, WITH MINIMUM CEMENT CONTENT OF 450
KG/M³. EXCEPT LEAN CONCRETE, MIX DESIGN SHALL BE DONE CONSIDERING 'SEVERE
ENVIRONMENT' EXPOSURE CONDITIONS.
7. THE GRADE OF LEAN CONCRETE SHALL BE M-20
C REINFORCEMENT
C C 8. TMT (HIGH YIELD STRENGTH DEFORMED STEEL BARS) CRS (CORROSION RESISTANT
STEEL) BARS COATED WITH FUSION BONDED EPOXY PAINT OF GRADE FE-500 D BARS
CONFORMING TO IS-1786 SHALL BE USED IN ALL CIVIL WORKS.
9. REINFORCEMENT SHALL BE BENT & FIXED IN ACCORDANCE WITH THE PROCEDURE
SPECIFIED IN IS 2502-1963.
10. CLEAR COVER TO THE MAIN REINFORCEMENT SHALL BE AS UNDER
150 THK. GRADE TOP BOTTOM SIDES
D SLAB D · FOOTING (RAFT & ISOLATED) 50 75 50
· PILE CAPS 50 100 50
· PILE 75 75 75
· GRADE BEAM - 40 40
· COLUMNS & PEDESTALS 50 - 50
E · BEAMS ABOVE GROUND LEVEL 35 35 35
· GRADE SLAB 30 30 30
E · LINTEL BEAMS 25 25 25
E' · SLABS & STAIRCASE 25 25 25
· CABLE TRENCHES BASE SLAB 20 35 35
· WALL 20 35 35
· CAP BEAM 45 45 45
GETCO ENGG. CELL 11. LAP LENGTH SHOULD BE 50 TIMES OF DIA..
DRAWING APPROVAL Bhavesh 12. LAP AT SUPPORT SECTION, JOINT SECTION & MID SPAN SHALL BE AVOIDED.
Cat-1 Approved ________________ Ravjibha 13. OVERLAPPING OF REINFORCEMENT SHALL BE STAGGERED.
I/C
Cat-2 Approved with comments____ i 14. IN CASE OF CONTINUOUS SUPPORT, REINFORCEMENTS ARE DEFERENT FOR TWO
Dhanani
Cat-3 Approved for information ____ ADJACENT BEAMS / SLABS, THE HIGHER SUPPORT REINFORCEMENT OF THE TWO SHALL
Cat-4 Not Approved _____________ Digitally signed
by Bhavesh
BE PROVIDED AT THE SUPPORT.
The above approval in general does not
absolve you from contractual obligations.
Ravjibhai
Dhanani
FOR OPEN FOUNDATION (IF REQUIRED)
Date:
2024.11.21
15. NO FOUNDATION SHALL REST ON FILLED-UP SOIL / BLACK COTTON SOIL.
11:27:07
+05'30' · IF FILLED UP SOIL ENCOUNTERED, FOUNDATION SHALL BE TAKEN 300 MM BELOW
VIRGIN SOIL.
· IF FOUNDATION FALLS ON EXCAVATED TRENCHES OF ADJOINING FOUNDATION, THEN
F F FOUNDATION SHALL BE EXTENDED UP TO THE DEPTH OF ADJOINING FOUNDATION.
· IF BLACK COTTON SOIL ENCOUNTERED, AT FOUNDATION DEPTH, THEN FOUNDATION
SHALL REST ON COMPACTED SAND BED OF 300MM THICK.
16. BACK FILLING OF FOUNDATION TRENCHES SHALL BE DONE WITH USE OF NON
COHESIVE SOIL ONLY.
· THE BACK FILLING AROUND THE FOUNDATION SHALL BE ADEQUATE TO ACHIEVE THE
1 2 3 4 5 6' 6 7 8 9 10 PROCTOR DENSITY OF 95%.
· FOR PILE FOUNDATION (IF REQUIRED)
17. THE GRADE OF CONCRETE SHALL BE M-30 FOR PILE CAP, COLUMN, BEAM, RAFT, ETC.,
GETCO
Letter No: GETCO/0478/11/2024 Approved Date: 21-11-2024 Released for Manufacturer
EXCEPT LEAN CONCRETE.
18. THE GRADE OF CONCRETE FOR PILE SHALL BE M-30, CONFIRMING TO IS 456 WITH
Released for Construction MINIMUM CEMENT CONTENT AS 450 kg. / M³. WITH TREMIE CONCRETE.
Released for Information 19. THE PILE SHOULD PROJECT 100MM. IN TO THE PILE CAP CONCRETE.
EL.0.950 M. 20. INTEGRITY TEST TO BE DONE FOR ALL PILES, PRIOR TO CAST PILE CAP.
T.O. SLAB 21. PILE CONCRETE SHALL BE DONE WITH MINIMUM LEAD TIME AFTER “PILE BORE” IS
ACCEPTED & CLEARED FOR REINFORCEMENT PLACEMENT AND CONCRETING. IN NO
CASE, PILE BORE SHALL REMAIN OPEN FOR MORE THAN FOUR HOURS AFTER
ACCEPTANCE.
D FOUNDATION BOLT (IF REQUIRED)
22. BEFORE CONCRETING, LOCATION OF FOUNDATION BOLT SHALL BE CHECKED &
APPROVED BY ENGINEER IN CHARGE.
23. FOUNDATION BOLT SHALL BE CONNECTED TO REINFORCEMENT CAGE BY MEANS OF
12 MM. DIA. BAR. (TO PROVIDE THE EARTHING TO THE FOUNDATION)
24. IF FOUNDATION BOLTS FOUL WITH STIRRUPS, STIRRUPS MAY BE ADJUSTED AT SITE.
NOTES:
(1). THE FINISHED GROUND LEVEL (F.G.L.) FOR THE SWITCHYARD IS CONSIDERED AS 0.00M, AND ALL BEAM
LEVELS SHOULD BE REFERENCED RELATIVE TO THE F.G.L LEGEND
EL.0.950 M. (2). ALL LEVELS OF BEAM ARE TO BE VERIFIED BEFORE CONSTRUCTION.
(3). CABLE TRENCH DRAWING WITH TRAY ARRANGEMENT i.e SIZE, DISTANCE, TRAYS ARRANGEMENT USE BAR MARKING IS AS FOLLOWS INSERT PLATE SCHEDULE
T.O. SLAB SEPRATE CABLE TRENCH APPROVED DRAWING.
(4). ENSURE THE INSERT PLATE ON A GRADE SLAB TO THE GIS BUILDING IS CHECKED AGAINST THE
1 Y 16 - A1 -150 - T
TYPE Count WEIGHT
APPROVED ELECTRICAL LAYOUT/MANUFACTURER/OEM DRAWING. IF ANY DISCREPANCIES ARE FOUND,
PLEASE CONTACT THE ENGINEERING CELL. IP-3_300x300x20 THK. 62 863.83 kg
(5). ALL THE WORK SHALL BE CARRIED OUT AS PER RELEVANT FIELD QUALITY PLAN APPROVED BY GETCO.
(6). ALL SAFETY PRECAUTIONS AS MENTIONED IN ELECTRICAL LAYOUT, SAFETY MANUAL & RELEVANT
TOP IP-4_1700x250x20 THK. 6 399.17 kg
STANDARD CODES, SHALL BE SCRUPULOUSLY FOLLOWED WHILE EXECUTION OF WORK. SPACING IP-5_6100x250x20 THK. 4 956.91 kg
(7). ORIENTATION OF GIS BUILDING SHALL BE AS PER APPROVED ELECTRICAL LAYOUT.
(8). CONCRETING OF ALL CIVIL WORKS UNDER BIDDER SCOPE FOR GRADE OF M30, M25 & M20 SHALL BE BAR MARKING IP-6_4015x250x20 THK. 2 314.78 kg
F E A DONE WITH THE HELP OF DIGITAL WEIGH BATCHER OR FLORI (MOBILE CONCRETE BATCHING PLANT) ONLY.
(9). ALL CONCRETE SHALL BE MACHINE MIXED, VIBRATED & CURED FOR MINIMUM 10 DAYS. Grand total 82 2646.15 kg
(10). USE OF NEEDLE VIBRATOR IS COMPULSORY FOR ALL CONCRETE WORK.
DIA OF BARS
DIAMETER(FE500,IS:1786)H.Y.S.D.
EL.1.000 M. No.OF BARS
SECTION T.O.IP EL.-0.950 M.
M-M T.O.C.

Drawing Control
300MM THICK SLAB AREA

CB-1 (700X300) HIDDEN BEAM


SECTION
M-M
CB-2 (500X300) HIDDEN BEAM
Employer's Approval Stamp
CB-3 (500X300) HIDDEN BEAM
SECTION
L-L EL.1.000 M. EL.1.000 M.
T.O.IP EL.-0.950 M. T.O.IP EL.-0.950 M.
T.O.C. T.O.C.

0 2024.10.21 FIRST SUBMISSION MOHIT ROHIT SIVAN


Rev. Rev. Date Modification Drawn By Created By Approved By
Drawing/Document Number
LOCATION DHOLERA
SECTION (0)-G71770-AC 281-V181-J04 P- 091281_E_C5_8843_DHO_0
SUB STATION TYPE GIS SUBSTATION
L-L Customer:
GUJARAT ENERGY TRANSMISSION CORPN. LTD. VOLTAGE LEVEL 400kV
S.P. VIDYUT BHAVAN, RACE COURSE,
EL.1.000 M. SECTION SECTION VADODARA - 390007

Submission
Purpose of
SECTION T.O.IP EL.-0.950 M. K-K K-K PRELIMINARY
N-N
T.O.C. Project:
ENGINEERING APPROVAL
400kV GIS SUBSTATION AT DHOLERA
CONSTRUCTION
Scale Paper Size LOA No. (SUPPLY): ACE(P&C)/Contract/E-100/400kV Dholera GIS/1763 DTD. 13.12.2023
1:100 Sign. Date LOA No. (ERECTION): ACE(P&C)/Contract/E-100/400kV Dholera GIS/1764 DTD. 13.12.2023
A0 LOA No. (CIVIL): ACE(P&C)/Contract/E-100/400kV Dholera GIS/1768 DTD. 13.12.2023
Responsible Dept. Drawn By Document Type GETCO Document NO.
2024.10.21
SECTION SE GP T SO SS MOHIT SWITCHYARD DRAWING XXX

PROJECT CODE:- SIEMENS-32


N-N
Title Document Tree
Created By 2024.10.21
ROHIT P- 091281_E_C5_8843_DHO_0
SL.NO. REFERENCE DWG. NO. GA & RC DETAIL OF GRADE SLAB
ARCHITECTURAL DRAWING Approved By FOR 400kV GIS BUILDING Rev. Date of issue Language Sheet
2024.10.21
1. PLAN, SECTION & ELEVATION (0)-G71770-AC 218-V181-M01 P- 091218_E_C5_8841_DHO_0
SIVAN 0 2024.10.21 EN 1
FOR 400kV GIS BUILDING