0% found this document useful (0 votes)
4 views

Quantity Estimate (3)

Uploaded by

Manish Dulal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

Quantity Estimate (3)

Uploaded by

Manish Dulal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Detail Measurement

S.N. Description Nos Length (ft) Breadth (ft)


A Civil Work
Site Clearence Layout site office management
1.00 and lab testing all complete
2.00 Earthwork in excavation
Isolated footing 15.00 6.00 6.00
Total

For lower tie beam trench


Along X-axis 5.00 10.77 2.00
Along Y-Axis 3.00 16.66 2.00
Total
Total Quantity of Excavation(Cuft)

3.00 Earth backfilling


Total Quantity of Excavation
Deduction of soling+PCC
Deduction of Footing
Deduction of RCC and Toe Wall upto GL
Total Quantity

4.00 PCC work (M-15)


At foundation footing base
Footing 15.00 5.33 5.33
Below Lower Tie Beam
Along X-Axis 5.00 10.77 1.34
Along Y-Axis 3.00 16.66 1.34
At flooring of plinth level 1.00 Area 631.28
Total Quantity

5.00 Brick soiling work


At foundation footing base
Footing 15.00 5.33 5.33
Below Lower Tie Beam
Along X-Axis 5.00 10.77 1.34
Along Y-Axis 3.00 16.66 1.34
At flooring of plinth level 1.00 Area 631.28
Total Quantity

6.00 RCC work (M-25)


6.01 At foundation footing base
Footing F1 15.00 5.00 5.00

Foundation column upto plinth level


Column above Footing 15.00 1.17 1.17
Total Quantity
3.2 RCC Column Above Plinth Level
3.2.1 RCC Column upto 1st Floor
RCC column C1(14"*14") 15.0 1.17 1.17
Sub-total Qty

3.2.2 RCC Column 1st to 2nd floor


RCC column C1(14*14) 15.0 1.17 1.17
Sub-total Qty

3.2.3 RCC Column 2nd floor to 3rd floor


RCC column C1(14*14) 15.0 1.17 1.17
Sub-total Qty
Total Column Quantity M25
3.2.4 9" Brick Wall Below Plinth Beam
Along X
Along Grid 1-1 5.0 10.77 0.75
Along Y
Before Grid A-A 3.0 16.66 0.75
Sub-total Qty
3.2.5 9" Walls
Along X
Along Grid 1-1 5.0 18.51 0.75
Along Y
Before Grid A-A 3.0 32.08 0.75
Sub-total Qty

3.2.5 4" Walls on 2nd and 3rd floor


Along X
Along Grid 1-1 5.0 18.51 0.34
Along Y
Before Grid A-A 3.0 32.08 0.34
Sub-total Qty

3.3 Foundation Beam


Along X 5.0 10.77 0.75
Along Y 3.0 16.66 0.75
Sub-total Qty

3.3 Plinth Beam(9"X12")


Along X 5.0 10.77 0.75
Along Y 3.0 16.66 0.75
Sub-total Qty

3.4 Floor Beam(9"X16")


3.4.1 First and Second Floor Beam
Along X 5.0 18.51 0.75
Along Y 3.0 32.08 0.75
Sub-total Qty

3.4.2 Third Floor Beam


Along X 5.0 18.51 0.75
Along Y 3.0 32.08 0.75
Sub-total Qty

Total Beam Quantity M25


Slab (M20)
3.5 Ground Floor Cover Slab
Ground Floor Cover Slab 4" 1.0 Area 972.20
Deduction of Beam 1.0 Area 141.59
Deduction of Column 15.0 Area 1.35
First Floor Cover Slab
Ground Floor Cover Slab 4" 1.0 Area 972.20
Deduction of Beam 1.0 Area 141.59
Deduction of Column 15.0 Area 1.35
Second Floor Cover Slab
Ground Floor Cover Slab 4" 1.0 Area 972.20
Deduction of Beam 1.0 Area 141.59
Deduction of Column 15.0 Area 1.35
Sub-total Qty

Staircase
3.6 Ground to 1st floor
3.6.1 1st Flight
Waist Slab 1.0 2.00 3.75
Landing 1.0 5.00 3.75
Steps 17.0 5.00 0.92
Sub-total Qty

1st to 2nd Floor


3.6.2 1st Flight
Waist Slab 1.0 2.00 3.75
Landing 1.0 5.00 3.75
Steps 17.0 5.00 0.92
Sub-total Qty

2nd to 3rd Floor


3.6.3 1st Flight
Waist Slab 1.0 2.00 3.75
Landing 1.0 5.00 3.75
Steps 17.0 5.00 0.92
Sub-total Qty

Formwork
4 Footing, Strap beam & Foundation tie beam
4.1 Isolated Footing Formwork
Footing F1 15.0 5.00 5.00
RCC Column Formwork
Foundation column upto plinth level
Column above Footing 15.00 1.17 1.17

3.2.1 RCC Column upto 1st Floor


RCC column C1(14"*14") 15.0 1.17 1.17

3.2.2 RCC Column 1st to 2nd floor


RCC column C1(14*14) 15.0 1.17 1.17

3.2.3 RCC Column 2nd floor to 3rd floor


RCC column C1(14*14) 15.0 1.17 1.17
Sub-total Qty

Foundation Beam Formwork


4.3 Along X 5.0 10.77 0.75
Along Y 3.0 16.66 0.75
Sub-total Qty

Plinth Beam Formwork(9"X12")


4.4 Along X 5.0 10.77
Along Y 3.0 16.66
Floor Beam(9"X16")
3.4.1 First and Second Floor Beam
Along X 5.0 18.51 0.75
Along Y 3.0 32.08 0.75
Sub-total Qty

3.4.2 Third Floor Beam


Along X 5.0 18.51 0.75
Along Y 3.0 32.08 0.75
Sub-total Qty

Slab (M20)
3.5 Ground Floor Cover Slab
Ground Floor Cover Slab 4" 1.0 Area 972.20
Deduction of Beam 1.0 Area 264.66
Deduction of Column 15.0 Area 1.35
First Floor Cover Slab
Ground Floor Cover Slab 4" 1.0 Area 972.20
Deduction of Beam 1.0 Area 264.66
Deduction of Column 15.0 Area 1.35
Second Floor Cover Slab
Ground Floor Cover Slab 4" 1.0 Area 972.20
Deduction of Beam 1.0 Area 264.66
Deduction of Column 15.0 Area 1.35
Slab Periphery 3.0 131.50
Sub-total Qty
Staircase
3.6 Ground to 1st floor,1st to 2nd, 2nd to 3rd floor
3.6.1 1st Flight
Waist Slab 3.0 2.00 3.75
Landing 3.0 5.00 3.75
Steps 51.0 5.00

Reinforcement RCC Weight of Steel


Reinforcement on Beam 580.50 1,913.91
Reinforcement on Slab 826.63 908.47
Reinforcement on Column 612.50 2,692.55
Reinforcement on Footing 869.17 1,528.35
Total Reinforcement Requrement (kg) 7,043.27
ent
Height (ft) Quantity Unit. Remarks
ork

5.00 2,700.00
2,700.00 Cuft

4.00 430.68
4.00 399.84
830.52
3,530.52 Cuft

3,530.52
(598.26)
(869.17)
(311.45)
1,751.64 Cuft

0.25 106.53

0.25 18.03
0.25 16.74
0.25 157.82
299.13 Cuft

426.13

72.14
66.97
631.28
1,196.53 Sqft

0.83 443.13

4.64 426.03
869.17 Cuft
10.00 204.17
204.17 Cuft

10.00 204.17
204.17 Cuft

10.00 204.17
204.17 Cuft
612.50 Cuft

3.00 121.13

3.00 112.46
233.58 Cuft

9.25 642.07

9.25 667.67
1,309.73 Cuft

9.25 291.07

9.25 302.67
1,187.49 Cuft

1.00 40.38
1.00 37.49
77.86 Cuft

1.00 40.38
1.00 37.49
77.86 Cuft

1.00 69.41
1.00 72.18
283.19 Cuft

1.00 69.41
1.00 72.18
141.59 Cuft

424.78

0.34 330.55
0.34 (48.14)
0.34 (6.86)

0.34 330.55
0.34 (48.14)
0.34 (6.86)

0.34 330.55
0.34 (48.14)
0.34 (6.86)
826.63 Cuft

0.42 3.15
0.42 7.88
0.50 19.48
30.50 Cuft

0.42 3.15
0.42 7.88
0.50 19.48
30.50 Cuft

0.42 3.15
0.42 7.88
0.50 19.48
30.50 Cuft
0.83 250.00

4.64 325.01
-
-
8.83 618.31
-
-
8.83 618.31 Sqft
-
-
8.83 618.31
2,429.94 Sqft

1.00 107.67
1.00 99.96
207.63 Sqft

1.00 107.67
1.00 99.96

1.00 254.51
1.00 264.66
1,038.35 Sqft

1.00 254.51
1.00 264.66
519.17 Sqft
-

972.20 Sqft
264.66
(20.18)

972.20
264.66
(20.18)

972.20
264.66
(20.18)
0.30 118.35
3,768.38 Sqft

22.50
56.25
0.50 127.50 Sqft