0% found this document useful (0 votes)
19 views1 page

cutting set

VFVFDV

Uploaded by

velliraja.n
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views1 page

cutting set

VFVFDV

Uploaded by

velliraja.n
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

M/S CUMI CHAKRA SITE CHECK LIST (PRE-ENTRY) FOR GAS

HOSUR CUTTING SET

Doc No.:
4 5
2

6 7
1

8 3

CONTR NAME- CHECK ITEMS DATE OF CHECK-


SL SL
NO
CHECK ITEM PHOTOS Y/N NO
CHECK ITEM PHOTOS Y/N

whether Protective whether Pressure


valve cap firmly gauges two for each
fixed for both cylinder(in & out)are in
1 2
cylinder (Check for working condition(both
damage/crack in Oxygen & Acetylene
the valve cap) gas)
whether Non return
whether Flash back valves (NRVs) is
arrestor (FBAs)has provided for both
3 been provided for 4 acetylene & oxygen
acetylene & oxygen cylinders hose fitted
cylinders with cutting torch to
avoid back fire.

whether Tight whether Hose free from


Crimping of hoses damage(cut and crack /
5 6
with jubilee clamps oil & grease to avoid
are fitted. leakage/ fire.

whether Cylinder whether Trolley tyre


7 secured by chain to 8 are free from damage
the trolley. and in working
condition.

Availability of
industrial type
lighter (no match 10 whether gas leak test has been done before starting the
9
box / commercial job to avoid fire
lighters) are
allowed.
NAME SIGNATURE DATE
Checked by contractor safety in charge

NAME SIGNATURE DATE


Checked by

You might also like