Rfi Summary For 20-12-2024

Uploaded by

minepranay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views3 pages

Rfi Summary For 20-12-2024

Uploaded by

minepranay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Project:- Construction of 3rd line between Maramjhiri (Km. 841.9) and Chichonda (Km. 911.

7) on Itarsi -
Nagpur section of Central Railway
Client:- Central Railway
PMC:- Technogem Consultants Pvt. Ltd.
EPC Contractor:- KEC International Limited
Raising Date :-19-12-2024

Earthwork
Chainage Inspection Inspection Requested by
SN RFI NO. Description Length (M) Layer RFI Date RFI Time Remarks
From To Date Time (Mob.)
Santosh Kumar
1 CR/CCD-MJY/EW/2024/6996 FDD testing for embankment 863+400 863+500 100 5th 19-Dec-24 4:51 PM 19-Dec-24 10:00 AM
(6396000566)
Santosh Kumar
2 CR/CCD-MJY/EW/2024/6997 FDD testing for embankment 863+640 863+860 220 2nd 19-Dec-24 4:51 PM 20-Dec-24 11:00 AM
(6396000566)
Santosh Kumar
3 CR/CCD-MJY/EW/2024/6998 FDD testing for embankment 865+840 865+980 140 4th 19-Dec-24 4:51 PM 20-Dec-24 1:00 PM
(6396000566)
Santosh Kumar
4 CR/CCD-MJY/EW/2024/6999 FDD testing for embankment 867+000 867+100 100 14th 19-Dec-24 4:51 PM 20-Dec-24 2:00 PM
(6396000566)
Santosh Kumar
5 CR/CCD-MJY/EW/2024/7000 FDD testing for embankment 868+360 868+480 120 1st 19-Dec-24 4:51 PM 20-Dec-24 3:00 PM
(6396000566)
Santosh Kumar
6 CR/CCD-MJY/EW/2024/7001 FDD testing for embankment 868+520 868+640 120 5th 19-Dec-24 4:51 PM 20-Dec-24 4:00 PM
(6396000566)
Santosh Kumar
7 CR/CCD-MJY/EW/2024/7002 FDD Testing for Subgrade 873+060 873+300 240 1st 19-Dec-24 4:51 PM 20-Dec-24 11:00 AM
(6396000566)
Santosh Kumar
8 CR/CCD-MJY/EW/2024/7003 FDD Testing for Subgrade 873+300 873+560 260 1st 19-Dec-24 4:51 PM 20-Dec-24 11:00 AM
(6396000566)
Santosh Kumar
9 CR/CCD-MJY/EW/2024/7004 FDD Testing for Subgrade 855+700 855+900 200 1st 19-Dec-24 4:51 PM 20-Dec-24 10:00 AM
(6396000566)
Santosh Kumar
10 CR/CCD-MJY/EW/2024/7005 FDD Testing for Subgrade 855+280 855+600 320 3rd 19-Dec-24 4:51 PM 20-Dec-24 10:00 AM
(6396000566)
Bridge Work
Chainage Inspection Inspection Requested by
SN RFI NO. Description Br. No. Section RFI Date RFI Time Remarks
From To Date Time (Mob.)
Checking of reinforcement shuttering
Atif
1 CR/CCD-MJY/BRW/2024/7006 for Retaining Wall 3rd lift both end 861+000 862+000 861/2 MALK-BYS 19-Dec-24 4:28 PM 20-Dec-24 10:00 AM
(8293659009)
and allow for casting

KEC Representative PMC Representative Client Representative


Project:- Construction of 3rd line between Maramjhiri (Km. 841.9) and Chichonda (Km. 911.7) on Itarsi -
Nagpur section of Central Railway
Client:- Central Railway
PMC:- Technogem Consultants Pvt. Ltd.
EPC Contractor:- KEC International Limited
Raising Date :-19-12-2024

897/1 (Up
Checking of ground improvement Lalit
2 CR/CCD-MJY/BRW/2024/7007 897+000 897+100 line JKR-MTY 19-Dec-24 4:35 PM 20-Dec-24 2:00 PM
level & allow PCC for bottom slab (97191 33527)
Extention)
Checking of reinforcement, Shuttering
Lalit
3 CR/CCD-MJY/BRW/2024/7008 & allow concrete work for Dirt wall ET 897+100 897+200 897/2 JKR-MTY 19-Dec-24 4:57 PM 20-Dec-24 11:00 AM
(97191 33527)
end.
Building Work
Inspection Inspection Requested by
SN RFI NO. Description Structure Location RFI Date RFI Time Remarks
Date Time (Mob.)
3rd Row footing reinforcement and
Piyush Shukla
1 CR/CCD-MJY/BLDG/2024/7009 shuttering checking and allow for EI Building Barsali 19-Dec-24 4:12 PM 20-Dec-24 2:00 PM
(8839800846)
casting work.
Checking of steel & shuttering and
Abhishek
1 CR/CCD-MJY/BLDG/2024/7010 allow for casting of staircase below EI Building Multai 19-Dec-24 4:58 PM 20-Dec-24 5:00 PM
(9835416167)
plinth beam column
OHE & GE Work
OHE Mast no. Inspection Inspection Requested by
SN RFI NO. Description Location RFI Date RFI Time Remarks
from To Date Time (Mob.)
Abhishek
1 CR/CCD-MJY/OHE/2024/7011 Foundation Casting km 859/860 MALK-BSY 19-Dec-24 6:22 PM 20-Dec-24 10:30 AM
(9835416167)
Abhishek
2 CR/CCD-MJY/OHE/2024/7012 Foundation Casting km 870/869 BYS-AMLA 19-Dec-24 6:22 PM 20-Dec-24 11:30 AM
(9835416167)
Narendra Pal
3 CR/CCD-MJY/OHE/2024/7013 OHE mast erection/grouting km 893/892 JKR-MTY 19-Dec-24 6:22 PM 20-Dec-24 11:00 AM
(9354736995)
Narendra Pal
4 CR/CCD-MJY/OHE/2024/7014 Material checking for MRC. MTY store 19-Dec-24 6:22 PM 20-Dec-24 11:00 AM
(9354736995)
PLC 33 kv
Satendra
5 CR/CCD-MJY/OHE/2024/7015 160mm HDPE pipe laying work for KM 899/20-22 MTY-HTN 19-Dec-24 6:22 PM 20-Dec-24 10:30 AM
(9412444911)
track crossing .

KEC Representative PMC Representative Client Representative


Project:- Construction of 3rd line between Maramjhiri (Km. 841.9) and Chichonda (Km. 911.7) on Itarsi -
Nagpur section of Central Railway
Client:- Central Railway
PMC:- Technogem Consultants Pvt. Ltd.
EPC Contractor:- KEC International Limited
Raising Date :-19-12-2024

4c×95sqmm al Cable laying work.


Betul rest house office Satendra
6 CR/CCD-MJY/OHE/2024/7016 50 mm DWC pipe laying work. DP - 19-Dec-24 6:22 PM 20-Dec-24 10:30 AM
building. (9412444911)
structure to building.
S&T
OHE No. Inspection Inspection Requested by
SN RFI NO. Description Section RFI Date RFI Time Remarks
From To Date Time (Mob.)
Tamal Paul
1 CR/CCD-MJY/S&T/2024/7015 Casting of Full location(7A) foundation 906/12 906/14 HTN 19-Dec-24 3:37 PM 20-Dec-24 11:30 AM
(8637874225)

KEC Representative PMC Representative Client Representative