01Process at a Glance- Eng Fit.xls1
01Process at a Glance- Eng Fit.xls1
PROCESS AT A GLANCE
TAKT TIME : min
PART DESCRIPTION : Under Body Line
ONE PIECE FLOW
100 90 80 70 60 50 40 30 20 10 Sequence
Sketch
Remove
Material Process
Lowert the lift Loose bolting Pull the lift engine
table and of engine Engine table (With mounting c/s Flow
push to clear mounting front stuffing and engine) members(Fro
the and rear cross aligning below the nt & Rear)
underbody member (# 16 manually vehicle and and carry to Description
area bolts) lift it. Eng. Sub
assy table
6 6 6 6 6 Station no.
Front and
Engine Engine Engine Parts Getting
rear c/s
assmebly assembly assembly Fitted
members
Alignment Alignment
Quality
Requirement
Visual Visual
Measuring
Gauge
Pneumatic Pneumatic
nut runner nut runner Tools
Lift table with Lift table with
fixture fixture Jig or Fixture
10 10,11 10,11 10,11 10,11 Operators
480
Cycle Time in
sec..
Material Process
Sketch
Flow
Slide one
end of Torque
Connections
Porpshaft in tighten the
of hoses -
Gear box and engine
Engine to
bolt the other mounting
fuel filter Description
end to RA bolts
flange
7 7 7 Station no.
Propeller
Banjo bolts
Bolts
Parts Getting
Shaft
and washers Fitted
Bolts
Visual
Torque 4 Kgm torque
Quality
inspection for
gaps Requirement
60 360 420
Cycle Time in
sec..
Sketch
Material Process
Flow
Description
Station no.
Parts Getting
Fitted
Material Storage
Transport System
Work Method
Quality
Requirement
Measuring Gauge
/ Tools
Machine
Hand Tools
Jig or Fixture
Operators
Sketch
Material Process
Flow
Description
Station no.
Parts Getting
Fitted
Work Method
Quality
Requirement
Measuring
Gauge
Tools
Jig or Fixture
Operators
Cycle Time in
sec..