Cathodic Protection QC Notes of Aramco
Cathodic Protection QC Notes of Aramco
Ans. 30 Meters
27. What is the rectifier minimum distance with in of a coastline?
Ans. 1 Kilometer
28. What is the maximum DC. Voltage Requirements of a CP.
Rectifier?
Ans. 100 VDC
29. How many meters intervals in paved areas directly over the
pipeline for CP. access test station?
Ans. 20 Meters
30. We have to provide CP. Test station per kilometer?
Ans. 1 KM.
31. What is the minimum mounting requirement of an oil
immersed rectifiers above ground?
Ans. 300 mm
32. What is the above grade mounting requirement for NEMA
rating enclosures?
Ans. 1.8 Meters
33. What is the enclosure minimum installation requirement with
in the rectifier?
Ans. 3 Meters
34. What is the percentage requirement of Circuit breaker rating
for the rectifier input current at rectifier rated load?
Ans. 125%
35. What is the limit splicing interval of buried main positive cable
runs, between rectifier and anode bed junction box?
Ans. 150 Meters
36. How many pound of Magnesium Anode required to be
installed?
Ans. 100 Lbs.
37. Parallel pipeline should be bond in every ______ Kilometers?
Ans. 10 KM