PURPOSE: The purpose of the Problem Solving Summary Form AT-10180 is to provide instructions on how to properly fill out an 8-Step.
SCOPE: The Problem Solving Summary Form AT-10180 applies to quality notifications requiring an 8-Step.
DEFINITIONS:
REFERENCES:
TABLE OF CONTENTS:
Box A1 must be marked/checked if and only if ITAR data is included on the form.
Form: AT-10180 Instructions
Do not check box A1
Rev: 05/08/2013
if no ITAR data is included.
Form Title Block
Person Responsible: Administrator, Plant SQE, or assignee
This section refers to the title block within the printed 8-Step. These are defined when the SQN is opened.
Title: Short description of problem
Opened by: SQN Administrator, Plant SQE, or assignee
Owner: Internal Person, Supplier Representative, or assignee Responsible to Answer Quality Notification
Tracking #: SQN Number
Date Opened: Date SQN started in management system
Date Closed: Date SQN closed in management system
Originating Plant: Plant initiating SQN
Where Found: Internal/External location where problem found (May not be same as Originating Plant)
Material: Part Number
Material Description: Part Description provided by management system
Vendor: Supplier Name (for External SQNs)
Supplier Support SQE: Name of SQE (for External SQNs)
Serial Number: Serial Number (if applicable)
Comp. Lot Code: Lot or batch number containing defective part(s) (if applicable)
Customer: Company name where problem was found (if applicable)
Customer Trk#: Customer Number (if applicable)
NOTE: If a different method was used to sort parts, then that should be included in Step 3 under method of check. If changes are being made to this process as a
result of the investigation, then those should be included in Step 6 Corrective Actions.
NOTE: Containment activity is always expected. Containment should remain in place until corrective action is implemented. If no containment was done, then
specific written justification should be included.
NOTE: Permanent changes to the gauging process as a result of the investigation should be included in Step 6 Corrective Actions.
2 Correct Tools?
Correct tools / fixtures / error proofing?
Has PM been done?
Are tools functioning correctly?
3 Correct Parts?
Correct Parts?
Parts routing current?
Parts stocked in correct location?
Error proofing needed?
4 Parts Changed?
Parts changed?
Best of the Best (BOB) vs. Worst of the Worst (WOW) parts different?
Parts in spec?
NOTE: Changes to detection, specifications, processing elements, error proofing etc. should all be included in this section. The 8-step owner is responsible to
coordinate and communicate with those persons responsible for completing identified activities. All items assigned to someone other than the owner of the
investigation that are not complete at the time of the 8-step presentation, must be discussed with the responsible party prior to presentation for follow-up. If the item
has not been implemented, then implementation dates should be realistic and reflect the agreement of the person assigned. Standard document updates will be
reviewed in Step 8 and action items generated from that step. Those changes do not need to be duplicated in Step 6.
NOTE: The specific metrics, on-going monitoring systems, and/or permanent reviews that were considered should be separately named and include the method of
review, who completed, when and with what results. If the review is not complete because all actions have not been implemented, then the planned review should
be detailed.
NOTE: As with Step 6, the problem solving owner is responsible to coordinate and communicate to those persons responsible for completing a review or update. If
all reviews are not complete at the time of presentation, the responsible party must be in agreement with the target date expected.
8. Problem Prevention & Institutionalization of Problem Solving (check box A1 if ITAR data included)