Site Inspection Report- Fact Sheet

Uploaded by

louise.treolith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
490 views

Site Inspection Report- Fact Sheet

Uploaded by

louise.treolith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

REPUBLIC OF THE PHILIPPINES

Department of Human Settlements and Urban Development


Kagawaran ng Pananahanang Pantao at Pagpapaunlad ng Kalunsuran
REGIONAL OFFICE
NOTARIZED ⃝ SITE INSPECTION REPORT / ⃝ FACT SHEET FOR SUBDIVISION AND OTHER
SIMILAR REAL ESTATE DEVELOPMENT PROJECTS

Docket No.:
Date

Project Name: Development Permit Issued Date:


Location: Development Permit No.:
Owner: License to Sell Issued Date:
Developer: License to Sell No.:
Address: Cert. of Registration Issued Date:
Land Area: Cert. of Registration No.:
No. of Saleable Lots: Target Completion Date:
Project Type: ⃝ PD 957 ⃝ BP 220 Others: Last Inspection Date:
Purpose of Inspection: Last Status of Development:
Date of Inspection:
Conducted By:

LAND DEVELOPMENT

% COST OF
ITEM COST PER ITEM REMAINING COST REMARKS
COMPLETION ACCOMPLISHMENT

I. GENERAL REQUIREMENTS
- Mobilization / Demobilization
- Temporary Facilities
- Permits and Clearances

II. SITE PREPARATION AND EARTHWORKS


- Clearing & Grubbing
- Surveying Works
- Excavation and Backfilling

III. ROAD NETWORKS


- Main Road
- Sidewalks & Alleys
- Curbs & Gutters

IV. DRAINAGE & SEWERAGE SYSTEM


- Underground Piping System
- Manholes & Catchbasins
- Box Culvert
- Sewerage Treatment Plants

V. WATER DISTRIBUTION SYSTEM


- Water Distribution Lines
- Pumps and Controllers / Devices
- Water Tanks
- Fire Hydrants
- Water Utilities System

VI. ELECTRICAL DISTRIBUTION SYSTEM


- Electrical Lines & Cables
- Transformer & Controllers / Accessories
- Electrical Poles & Street Lights
- Other Long Lead Equipments

VII. LANDSCAPE & HARDSCAPE WORKS


- Planting Strips & Trees
- Parks & Playgrounds
- Other Outdoor Amenities & Open Spaces
- Signages & Street Names
VIII. OTHERS / MISCELLANEOUS
- Clubhouse & Admin Building
- Entrance Gate & Guard House
- Perimeter Fence
- Slope Protection / Retaining Walls

TOTAL

HOUSING COMPONENT

% COST OF
ITEM COST PER ITEM REMAINING COST REMARKS
COMPLETION ACCOMPLISHMENT

TOTAL

EVALUATION / RECOMMENDATION

PREPARED BY:

PROJECT ARCHITECT / ENGINEER


Inspector
Date:

VERIFICATION

I, _____________________________________________________, of legal age, after having sworn, depose and say that I have re
and accomplished this form and contents herein are true and correct.
Name, Signature, and Seal of the
Project Architect / Engineer

PRC Date & Place Issued:


PTR Date & Place Issued:

SUBSCRIBED AND SWORN to before me in this ______________ day of _______________________________ affiant exhibiting to
his/her _______________________ No. _________________, issued at __________________________ on ___________________

NOTARY PUBLIC

Doc. No.:
Book No.:
Page No.:
Series of
REPUBLIC OF THE PHILIPPINES
Department of Human Settlements and Urban Development
Kagawaran ng Pananahanang Pantao at Pagpapaunlad ng Kalunsuran
REGIONAL OFFICE
NOTARIZED ⃝ SITE INSPECTION REPORT / ⃝ FACT SHEET FOR CONDOMINIUM AND OTHER
SIMILAR REAL ESTATE DEVELOPMENT PROJECTS

Docket No.:
Date

Project Name: Development Permit Issued Date:


Location: Development Permit No.:
Owner: License to Sell Issued Date:
Developer: License to Sell No.:
Address: Cert. of Registration Issued Date:
Land Area: Cert. of Registration No.:
Total CFA: Target Completion Date:
No. of Saleable Units: Last Inspection Date:
Project Type: ⃝ PD 957 ⃝ BP 220 Last Status of Development:
Purpose of Inspection:
Date of Inspection:
Conducted By:

% COST OF REMAINING
ITEM COST PER ITEM REMARKS
COMPLETION ACCOMPLISHMENT COST

I. GENERAL REQUIREMENTS
- Mobilization / Demobilization
- Temporary Facilities
- Permits and Clearances

II. SITE DEVELOPMENT WORKS


- Landscape and Hardscape
- Roads, Alleys and Walkway
- Outdoor Amenities and Parking

III. EARTHWORKS
- Clearing and Grubbing
- Building Footprint
- Remaining of Land Development
- Excavation and Backfilling Works
- Building Footprint
- Remaining of Land Development

IV. ARCHITECTURAL WORKS


- Masonry and Waterproofing
- Exterior and Interior Painting
- Tiling and Ceiling Works
- Floor and Wall Finishes
- Masonry and Dry Wall Partitions
- Doors and Windows
- Roof / Deck
- Metal Works and Special Finishes

V. STRUCTURAL WORKS
- Formworks and Scaffoldings
- Footing and Foundation
- Diaphragm and Shear Walls
- Slabs and Stairways
- Columns, Girders, and Beams

VI. MECHANICAL WORKS


- Elevator Works
- Mechanical Rooms
- Air-Conditioning Systems
- Ventillation and Exhaust Systems
- Generator Set
- Pumps and Devices

VII. ELECTRICAL WORKS


- Transformers and Switchgears
- Wires and Cables
- Fixtures and Devices
- Feeder Lines and Conduits
- Electric Meters and Panelboards
VII. AUXILLIARY WORKS
- Auxiliary Systems
- CCTV System
- Building Management System
- PA/BGM System
- WLAN / LAN
- CATV / Telephone Lines
- Fixtures and Devices

VIII. PLUMBING AND SANITARY


- Water Distribution Systems
- Drainage and Sewerage Systems
- Plumbing Fixtures and Fittings
- Fixtures and Fittings
- Water Tank and Piping Works
- STP

IX. FIRE PROTECTION WORKS


- Fire Alarm System
- Automatic Fire Sprinkler System
- Heat and Smoke Detection System
- Fire Hose and Cabinets

X. OTHERS / MISCELLANEOUS
- Indoor Amenities & Recreational Spaces

TOTAL

EVALUATION / RECOMMENDATION

PREPARED BY:

PROJECT ARCHITECT / ENGINEER


Inspector
Date:

VERIFICATION

I, _____________________________________________________, of legal age, after having sworn, depose and say that I have re
accomplished this form and contents herein are true and correct.
Name, Signature, and Seal of the
Project Architect / Engineer

PRC No.: Date & Place Issued:


PTR No.: Date & Place Issued:

SUBSCRIBED AND SWORN to before me in this ______________ day of _______________________________ affiant exhibiting to
his/her _______________________ No. _________________, issued at __________________________ on ___________________

NOTARY PUBLIC

Doc. No.:
Book No.:
Page No.:
Series of