0% found this document useful (0 votes)
10 views1 page

FPA ASS'Y

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views1 page

FPA ASS'Y

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Customer Name / Code: Inspection Date: Doc No-BJD/QC/PQC/09

Applicable Workshop:
Product Type: Production Line: Checkers:

First stage □ plugin □ assembly □ packing

First Type □ Daily Routine □ Transfers □ First Production

Inspection basis □ BOM □ model □ market order □ drawings □ specifications □ quality inspection
standards
Inspection item inspection standard inspection record
NO.
1# 2# 3# 4# Remarks
Verify that all
materials are All materials should be consistent with
1
consistent with the the BOM list.
BOM list
Whether the product
The product process must be consistent
2 process is consistent
with the model.
with the model
3 Appearance No dent,Scratch, Gapping,Broken etc.
The product should be Functionaly ok as
4 Product Features
per specified parameter.
5 No-load voltage V- V

6 Load current mA- mA

7 high-pressure test KV, mA, S


Line processCheck the PPE,WI,SOP,NG sample on
8
information line should be ok.
Burning time: 10S, ≤ 60S extinguished,
9 Burning test
no combustible dripping.
Height: 1.0 m, 6 sides of the 2 times in
10 Drop Test the wood, the product without any
dysfunction or latent function hidden.

Unqual
ified
descrip
tion

The final
judgment □ qualified, can be produced □ unqualified, can not produce □ Status of FPA:
result
Remarks:1, the above test items are not applicable, in the inspection record column "/".
2, check the qualified in the record column fill "OK" or data; fail to fill "NG", in the non-qualified description
of the column to fill the contents of the failure.
Inspector Quality Verified By- Approved By-
FIRST INSPECTION REPORT (ASS’Y)
[Type text]

You might also like