Lampiran B - Lifting Plan - Pengangkatan Dolphin Bagian Atas

This document is to describe calculation of lifting plan (SWL)

Uploaded by

Askhaf Irfandy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PEMANCANGAN DAN PEMASANGAN DOLPHIN STRUCTURE 1E

Date : Mar-21
Location : Jetty PT. TIA, BUNATI - KALSEL
Tipe/Jenis Crane : Crawler Crane/Lattice Boom Shanghai Sany SCC150000
Objective : PEMBONGKARAN DOLPHIN EXISTING BAGIAN ATAS

SWL POINT
Refer to the available load chart to define the nearest radius (interpolation formula is available as well)

Max radius : 24 (m)


Max Boom Length : 48 (m)
SWL Manufacture : 23700 (Kg) (Manufacture SWL)
Max allowable load (Wm) : 18960 (Kg) ( 0.8 x SWL )

MATERIAL DATA
Dimention Unit
I. Dolphin Bagian Atas : 12,809.00
Total load : 12,809.00 (Kg)

LOAD CALCULATION
Material Weight (Kg) : 12,809.00 (Kg)
Multiply factor 1.05 1.20 if estimated
Total Weight (Kg) : 13449.45 (Kg) 1.10 if calculated
1.05 if given by manufacture
1.03 if wighed

Weight (Wo) : 13449.45 (Kg)


Lifting appliance weight (Wa) : 250.00 (Kg)
Weight of hook (Wh) : 960.00 (Kg)
Weight of aux. hook (Wah) : -
Spreader bar (Wot) : -

Safety factor (Fs) : 1.00 1.30 for offshore


1.15 for inshore
1.00 for onshore

Total weight of load (Wt) : 14,659.45 (Kg) Fs x (Wo+Wa) + Wh +Wah + Wot

Allowable : OK (Yes if Wt < Wm)


PEMANCANGAN DAN PEMASANGAN DOLPHIN STRUCTURE 1E

LIFTING PLAN CALCULATION

Crawler Crane/Lattice Boom Shanghai Sany SCC150000


BOOM LENGTH = 48.00 m
RADIUS MAX = 24.00 m
CRANE CAPACITY (SWL) = 18.96 Ton
TOTAL WEIGHT OF LOAD (MAX) = 14.66 Ton Load capacity crane 77.3 %
WORKING ANGLE = 70⁰ (lihat grafik Load chart crane)

48 m
dimana , a = 70⁰

ao

Max = 24.0 m

TOTAL WEIGHT LOAD WT = 14.659 ton


DYNAMIC FACTOR = 2.00 (offshore)
TOTAL WEIGHT OF LOAD = (1 x Weight) + Weight of Aux. Hook = 14.66 Ton
USE SHACKLES = Bolt Type Anchor Shackle 3/4 ", 4 Ea WLL = 6.50 Ton
USE WIRE SLING = 4.00 Ea ( 22 mm blue strand class 6x36 steel core 1960 grade)
SWL WIRE SLING TO USE = 6.00 Ton
LENGTH WIRE SLING = 12.00 m (1.0 inch diameter)
TYPE OF TYING = Straight/Direct to Dolphin Structure
Calculation

α = 45°

WLL Sling = SWL x 3 x Factor Sudut Sling (45⁰) x Factor Pengikatan.


= # x 3 x 0.700 x 1.00 = 12.60 Ton

SF Sling WLL.Sling
= / WT
= # / 14.66 = 0.86 > 1 --------> OK

WT.Shackle = WL / 3
= # / 3 = 4.89 Ton

SF Shackle WLL.Shackle
= /WT.Shackle
= # / 0.86 = 5.69 > 1 -------> OK