Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
208 views
52 pages
API 570 Study Guide for beginners
Guide for api 570
Uploaded by
bsrinivasan03111977
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save API 570 Study Guide for beginners For Later
Download
Save
Save API 570 Study Guide for beginners For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
208 views
52 pages
API 570 Study Guide for beginners
Guide for api 570
Uploaded by
bsrinivasan03111977
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save API 570 Study Guide for beginners For Later
Carousel Previous
Carousel Next
Download
Save
Save API 570 Study Guide for beginners For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 52
Search
Fullscreen
APL-570 PRESTUDY GUIDE -T. SCHINDLER Pen COLEY ab CODEWEST -ALL RIGHTS RESERVED -DO NOT COPY OR DISTRIBUTE. COPYRIGHT 2001 - RM. SGS India API 570 PIPING INSPECTOR PRE-COURSE STUDY GUIDE March 2002 ‘COPYRIGHT 2001 - IT. CHNOLER, LW. COLEY AND CODEWEST- AL IONTS RESERVED -DO WOT COPY OR DISTRIGUTE 1API-570 PRESTUDY GUIDE - T. SCHINDLER ‘COPYRIGHT 2001 IRC. SCHINDLER JW. COLEY AND CODEWEST - ALL RLOHTS RESERVED -DONOT COPY OR DISTRIBUTE, API 570 TRAINING COURSE PREPARATORY COURSE WORK Welcome fo the API 570 Training Class, hosted by Innovative Research Consultants UK. We are very pleased that you have entrusted your training to us for this important examination, and we take this esponsibility very seriously, Our mission together is quite simple, and one, which we wil remain focused upon, simply put, this mission is: “ESTABLISH A BASE COMPETANCY TO THE API 570 BODY OF KNOWLEDGE” ‘This is our only goal, and together, with diligence, patience, and hard work, | am confident that we will ‘succeed in making this mission a reality. In this regard, this Preparatory Course is provided to help get you started and better prepared for the Journey ahead. It consists ofthe following items: + Course Outline. «Testing information. «Approximately 150 review questions that can be studied to prepare for the upcoming test. «+ Atmini-test’ to see how well you are remembering some critical information. ‘+ Over 250 actual past test questions (2s remembered by previous stuxients) to prepare you for the ectual test questions you wil need to know. { These questions may appear “disjointed” but you will get the general feel for what question was asked). Remember! This is your training course. You wil only get out of what you sre wiling to put into it ‘Therefore, if you do not complete this material, you will only be lowering your chances of successfully completing our mission. Pease come to class as prepared as possible. Itis very important o attend every class, complete all ‘homework assignments, and pay very strict attention to the classroom presentation. Again, your participation is the key ingredient to passing the test. ‘Once again, we appreciate the opportunity to provide this training and we are wilting to “go the extra mile” to ensure your success in the examination. Please call us at + 44 207 476 4329 if you have any questions or if we may be of any further service. ‘See you at the first class, and Good Luck for a suecessful Course!
" 12 welder qualifies ona 6” pipe production weld and as, ho how can he re-qualify - test ‘welds, 12" production weld, et. (0) Seber 7 [MT- time between calibration of yokes (V) ‘ ‘ ‘What isthe minimum RT density range for Gamma ray (V) ‘What shows that the RT procedure is qualified to ASME V-- (V) ACTUAL PAST TEST QUESTIONS FROM JUNE 1998 EXAM oPet UESTIONS. 10. 1 ‘Are bend specimens acceptable? ASME Section IX - Are tensile specimens acceptable? [ASME Seaton 1s preheat shown on WPS aconptable? ASME Section IX Is thickness range for filet welds acceptable? ASME Section IX ~ Is the F-No, acceptable for filet metal shown on WPS? ‘ASME Section IX . What are the limits upstream and downstream for an injection point circuit? AP S70 ‘Small bore primary process piping should be inspected in accordance with all the requirements of APIS70. APIS70 ‘What permanent and progressive records must be maintained for in-service piping systerns? API570 ‘The repalt organization shall use welders and welding procedures qualified In accordance with which standardicode? APIS70 =’ '* ‘What isthe test point for a NPS 10 size pipe? APIS70 ~ ‘What isthe height of a reised face on a Class 150 and 200 flange for other than lapped joints? B16.5 (0.060") COPYRIGHT 201 - IRE, SCHNDLER,1.W. COLEY AND CODEWEST - ALL RIOHT RESERVED -DONOT COPY OR DISTRIBUTE aAPI-570 PRESTUDY GUIDE -T. SCHINDLER coprmitt2004~InCIT. SCHINDLER , JW. COLEY AND CODEWEST «ALL RIGHTS RESERVED -DO NOT COFY OR DISTRIBUTE 12 13, 14 165, 16. 7. 18. 49, 20. 24. 22, 23, 24. 25. 26. a. 28. 29. 30. 31. 32. 34, What is normalizing? 631.3 Calculation for a blank. 831.3 Calculation for minimum required thickness of apipe. 831.3 Question relating fo what speciation tobe used for the procedure to impact test pine. 821.3 What is the preheat requirement for a P-No. 11A materia, = B31.3 Whatis the PWHT requiement for a P-No. 1 matertl, wich is over 3/4 in. thick? 631-3 What is the meximum hardness for a P-No 5 material wih a chrome content greater than 334? asta On a girth weld for piping in normal fluid service the RT report shows incomplete penetration, on oi and slag clusions (ll values given). Is the weld acpeptable? 631.5 Question relating to 831.3 Vihat is the allowable stress value for an A.___pipe ata spectiad temperature? 8313 Question related to immediate retests using raciography fora welder. Section IX ‘Question related to filet weld qualification. Section question on procedure content for a magnetic particle examination. Section V What s the maximum allowable stress value permed whon an evaluation Is made using ‘Appendix 4 of ASME Code Section VIII, Div.2? APLST0 What ean be done to stop or minimize the leakage at aflanged int? API 74 How much higher would the ultrasonic readings actually be I the temperature of the surface temperature were 700%? APIS74 os For contact examination the temperature of the examination and basic calibration block surfaces: is recommended to within °F, ASME Section V What is the MAWP of the piping system considering the folowing. NPS 20 pipewihan yt vipat Se aress of 20,000, E, = 1.0, ¢= 0.125 in, minimum thickness of 0.28 a 8313 ‘Question on corrosion rate, answer in terms of mis/year, API S70 Whats the calibration frequency for & magnetic particle yoke? ‘ASME Section V ‘Acatorted step wedge fim is traceable to what standard?, —»-ASME Section ve ‘Question on magnetic particle materials? ASME Section V ‘An A516 Gr. 70 material Is normalized and 28 mm thick, Whats the minimum temperature =°9 = ‘where impact testing is not required? 831.3 —— What isthe PWHT time required fora material witha thickness of 1-14 B33 te da con Nn SOY aN CODEWEST ALDOKTS RESERVED -20 HOT COPY ORCHETRRUTE es 28API-STO PRESTUDY GUIDE -T. SCHINDLER ‘COPYRIGHT 2001 -!RCI, SCHINDLER JW. COLEY AND CODEWEST- ALL RIGHTS RESERVED -DONOT COPY OR OISTRUBUTE 37. Whatis the preheat zone? 831.3 38. Pressure tests are normally required after what? API 570 39. A buried pipe has a soil resistivity measurement of 8300 ohm/cm with no cathodic protection. ‘What isthe inspection interval? API 570 40. Buried piping is leak tested at 120 psi, after 6 hours pressure has dropped to 112 psi. What do you do? APIS7O. 41. Given an NPS 8 pipe with a corrosion allowance. Select the appropriate schedule of pipe to be used. 574 ; 42. Whatis the minimum thickness of a blind flange of a specified Ciass rating? 816.5 KE: ut 43. Definition of an isometric sketch.API 574 44, When installing @ new piping system or adding to an existing one and no information available ‘on corrosion rate, how would you establish the corrosion rate? API §70: 48. Remaining tie calculation, given were initial thickness, actual thickness and a corrosion rate. API570 46. vibrating piping system would produce what type failure? (Fatigue cracking) P1570, at. \ien excavating utp for spectonk woul be epee nwt ent? PIS - 48. Whatis the recommended downstream limit for injection point where more extensive inspection should be applied? P1570 49. On the repair of a closure weld that is not pressure tested, what is not a requirement? APLS7O 50. Whats the examination method used to detect SCC of austenitic SS pipe? API S70 51. On new piping who sets the Inspection intervals? API $70 52, Who has overall responsibilty for compliance of API570? API 570 53. Caloulation for remaining life with TML measurements and dates given. API570 54, For Class 3 piping how much inspection do you perform for CUI? API 670 55. How should the wire type penetrameter be placed in relation to the weld? ‘ASME Section V 56. What type of radiographic fim is permitted? ASME Section V 57. For Class 3 piping systems the extent of inspection for CUI is? API'570 58, How often must the examiner doing visual examinations per Article @ have thelr eyes examined for near distance acuity? ‘ASME V ‘COPYRIGHT 201 ~ IRGT. 9CHNOLER, J..COLEY AND CODEWEST -ALL RIGHTS RESERVED - DO NOT COPY OR DISTRIBUTE 29APLSTO PRESTUDY GUIDE - T. SCHINDLER COPYRIGHT 2001 - C/T ECHNOLER, J. COLEY AND CODEWEST - ALL RIGHTS REBERVED -DO WOT COPY OR DXSTRIBUTE 59. 60. 81. €2, 64. 65. 67. 68, 70. nm 72. 73. 4. 75. 76. How often should en utrasonic testing instrument be calibrated? ASME Section V Can UT be used as an allemative to RT for the qualification of a wekder? ASME Section IX Which of the following is required prior to performing an Inspection? a. Permission to work in vicinity What is the downstream fimit of an injection point? API'S70 ‘What is the temperature range at which CUI will occur? API'570 Which ofthe following insulated piping systems are susceptible to CUI? API S70 a. Carbon stee! bbove 250°F but in intermittent service \When buried piping is uncoated at grade, consideration shoud be given to excavating how deep to assess potential for hidden damage? API 570 When should hammer testing not be used? APIS74 \What typically occurs dowrtream of control valves and orfice runs? APIS70 Which of the folowing is not purpose ofa TL? APIS7O Where are more TML's expected to be designated? API 570 UT readings taken at a temperature of 300°F will show readings that are % above the ‘actual thickness. APIST4 Which of the folowing can be used for material verification? APIS70 ~ Question on when thickness measurements on valves are taken. API 870 What examination is recommended for gate valves that are susceptible 0 corrosion/erosion service? ‘APISTO ‘What API standerd Is used when pressure testing gate valve bodies? Who i esponsbie to perform evalustions when environmental eracking is found? API570 APISTO = copii 2o- me. cnmOLER, 1M, COLE AND CODEMEST =A HT REBERVED-DONOT COPY ORDETRENTS, 30‘APIS70 PRESTUDY GUIDE -7. SCHINDLER .orvruair 201 ROM. 9CNRDLER IW COLEV AMD CODEWEST- ALL RIOTS RESERVED -DO NOT COPY OR OSTOBUTE 91. Substituting special procedures for a pressure test after @ repair or alteration may be done after consulting? APISTO . Inspector and piping engineer 4 92. Who can accept the results of a pressure test following repair or alteration? = API 570 93. Which of the following is required when a rerating is performed? API 570 ‘94. Which ofthe following requirements must be met for aerating? API 570 a. Acceptable to piping engineer . engineering records updated ©. 4. a&babove 95, Low soll resistivity usuallymeans: —API'570 Higher corrosion 97. What is @ round spring loaded device used for supporting piping called? API S74 98. What should not be done when a threaded joint is found leaking i-service? API570 99. What should be done prior to inspecting excavated piping in an 6" deep ditch? API 570 400. {you find a pipe shoe that has grovm off its bearing plate you should? API 570 2. Perform a piping stress analysis b. Recommend adding additional shoe length ‘c. Modify the supporting structure , 401. While performing an external piping inspection you should elso inspect? APLSTO a. Expansion joints . Hangers, supports ©. Unrecorded field modifications d. Allof the above _inc/t SCHNOLER, J.COLEY ANO CODEWEST - ALL RONTS RESERVED -D0 NOT COPY OR DISTRIBUTE comrnuan 2001 32APISTO PRESTUDY GUIDE - T. SCHINDLER ‘COPYRIGHT 20¢t- RCI. SCHINDLER , JW. COLEY AND CODEWEST - AL RUGNTS RESERVED -00 NOT COPY OR DISTRIBUTE 102. Which of the following is a nonessential variable for the SMAW process? ‘ASME Section 1X ‘8. Uphill or downhill progression b. Increase of 100 degrees preheat . Supplementary essential variable 4 103. Why would you seal weld a threadedjoint? 831.3, 404. A flanged joint is composed of what elements? 816.5 405. Which ofthe following is not required to be marked on a flange? 816.5, &, Manufacturers name of trademark b. Temperature c. Rating class 4. Designation 406. What s the calibration frequency for a pressure test gage that is used for leak testing? [ASME Section V 107. When a penetrameter cannot be placed on the source skie, how is Itidentiied? ASME Section V 108, When do.a welders qualifications expire? ASME Section IX 109. Question on local PWHT. -APIS70 110. What methods can be used to determine the chemical elements of a material? API S70 141. When are internal inspections of piping made? API570 142, Question on alternative RT for qualification of a welder. ASME Section Ix 113, Calculation of hydrotest pressure with design pressure, 200°F condansate water and 2 900°F design temperoture given, Material was A-335 P11, 831.3 (How can calculation be made without ‘eference to stress tates?) 114. Long term corrosion rate caleulation. API 570 145. Long and short term corrosion rate calculation. API 670 146. Definition of short term corrosion rate. API S70 447. What should you do with a deadieg that serves no further process purpose? API'570 148. Under what circumstances can TML's be eliminated? AP|570 419. What class would the piping be for a FCCU (fluid continuous circulation unit) inside the battery limits? API 570 420. Whats the inspection interval for a Class 1 buried pipe without cathodic protection? API570 (Soll resistivity must have been given) 421, What can be done regarding TML selection fora high temperature, low velocity suiphitic hydrocarbon? API 570 ‘COPYRIGHT 201 IRC, SCHIRDLER, JW. COLEY AND CODEWEST -ALL RIOHTS RESERVED -DO NOT COPY OR DISTRIBUTE. 33‘APL-570 PRESTUDY GUIDE - T. SCHINDLER * ‘COPYRIGHT 2001 -IRCT, SCHINDLER W. COLEY AND CODEWEST- ALL RIGHTS RESERVED -DO WOT COPY OR DISTRIGUTE 122, Whats CUI considered to be? API 570 ‘2. Localized corrosion b. General corrosion c a. 123, What is the inspection interval for a diesel line going to a river barge? APIS70 424, What would not cause an increase in pressure to a piping system? a. Hydraulic hammer . Temperature increase of product ©. Low specific gravity of the hydrocarbon product 4 125, How are soil resistivity measurements obtained? API 570 ‘a. Wenner four pin method b. c a. 126, _ Whatis the best way to reduce distortion in a piping system? ‘a. Have longer straight runs . Increase pipe diameter ©. 127. Whatis 2 comerjoint? ASME Section 1X 128, _ Which of the following Is an essential variable for the SMAW process? ASME Section IX a, F number b. Anumber . Groove design 4. Botha &b ACTUAL PAST TEST QUESTIONS FROM DECEMBER. 1997 EXAM (NOT BROKEN DOWN INTO CLOSEDIOPEN BOOK) 1. What material is commonly used for pressure tests? a. hydrogen b. steam «. nitrogen d. water 2. Environmental cracking commonly found in carbon steel: a. naphthalene . polythionic ©. amine d. chloride z e _ COPYRIGHT 200 - RCT. SCHOLER, .W, COLEY AND CODEWEST « 34 ALL RIGHTS RESERVED -DONOT COPY OR DISTRIBUTEAPI-570 PRESTUDY GUIDE - T. SCHINDLER. COPYRIGHT 2001 -IRCIT. SCHNOLER JIN, COLEY AND CODEWEST - ALL RIGHTS RESERVED -DO NOT COPY OR DISTRIBUTE 3. een oane 1, 12, 13, 14. 16. 16. 7. 18. 19, 20, 2 22. 23. 25. a. 28. API570 covers in-service piping systems. ‘Owner-user has overall responsibilty for compliance with API 570. ‘Authorized piping inspectors education & experience. Inspection personnel require permission to work in the vicinity. Injection pointfinspection points-timit ‘Ares of deadlag most susceptible to corrosion. ‘Warmer marine locations have higher corrosion potential Piping systerns above 250°F but are in intermittent service, Buried piping which is uncoated at surtece-depth of excavation for inspection should be 6= a2 What type of damage has occurred on an impeller due to direct impingement of uid wih particulates, ‘Sucker rod in a low cycte operation. Why did it fail? Number of eyoles required to propagate a crack to failure. Creep is dependent on: a. time b. temperature c. stress 4d. allof the above “Temperature of wale in piping systems - freezing condtéons may cause felire of piping. Test methods to find creep cracking in piping Opportunities to perform visual inspection on intemal piping. Operating parsonne! should report various problems to engineering (oF inspection personnel for assessment. “TML's should be marked on inspection drawings & on the piping system. Does insulation need to be removed from piping to cary out radiography. High temperature UT. ‘Should a pressure test be performed before or after any heat treatment Use of x-ray fluorescence for testing. Gate valves in 8 corrosion/erosion service....do UT between the seats. Hydro testing of valve body to what standard? (AP! 596) Fastener considered engaged when...» Table 1 - inspection intervals “COPYRIGHT 2001 - IRC, SCHINDLER, J.N. COLEY AND CODEWEST - ALL FIGHT 35 RESERVED -DO NOT COPY OR OSSTREUTEAPLS70 PRESTUDY GUIDE - T, SCHINDLER ‘COPYRUGiT 2001 RIT. BCHNOLER J. COLEY AND CODEWEST -ALL RIGHTS RESERVED -0O NOT COPY OR DISTRIBUTE. 29. Inspection intervals on Class 1, 2, & 3 systoms - are of inspection. B30. smatlbore piping - tas 1 service - inspection requirements. 31, SBP secondary piping - 32. Caleulate remaining fe 33. Inaccurate rate of corosion required adjustment to agree with actual rate. 34. Caloulations using t= £2 35. Longitudinal eracks and repairs. 36. Maximum yield strength of pipe isnot more than 40,000 psi 37. For Class 1 & 2 pipng systoms welds shall be 100% RT’ or UT‘ 38. Use of clamps forrepsirs. Sec. 6.1.4 39. API publication for hot tapping (API 2201) 6 40. PWHTT is performed for: a. Environmental cracking resistance b. code compliance 41. Pressure test shall be performed after welding tf practical and deerned riecessary by the Inspector. 42, indications of leaks in buried piping. 43. Use of holiday testing on pipe coatings. 44. If piping is cathodically protected, what intervals should itbe monitored at? NACE RP1069 (Annually) 45, Piping cathodically or not cathodically protected inspection intervals. 48. Leak test for 12 hrs with a 8% drop in pressure 47. Logging location of clamps on pipe repairs. 48, Definition of what's not an aeration. 48, Definition of an inspector and an examiner. ‘1, Definition of hold point", 1, Definition of ‘test point’. 7 hs Size of patch radius on a pipe repair (1" min. radius) AWME 831.3 ' Intent of Code. ‘eoPrmictt 2001 eM SCHINDLER, JM. COLEY AND CODEWEST - ALL RIGHTS RESERVED -D0 NOT COPY OR DISTRIBUTE 36‘API-5T0 PRESTUDY GUIDE -T. SCHINDLER ‘COPYRIGHT 2001 — RCI. SCHINDLER, 1, COLEY AND CODEWEST- ALL RIGHTS RESERVED -DO NOT COPY OR DISTRIGUTE 2. 10. 1, 12, 13, 14, 15, 16, 17. 18. 19. 20. What is normalizing? ‘Given the parameters: 150 psi & -20°C, what fuid service is appropriate? Effect of cooling o create an intemal vecuum, Calculations using Barlow's formula. Calculation using a bind flange. Minimum yield strength of flange bolts. Use of spit backing rings in severe cyclic condtions.._ Determine min. impact temp. for 516-70 normalized material Impact value for carbon steel - 3 specimens. ‘Transition angle on thicker pipe joined to thinner pipe. Tack welds? 16" gap Preheat requirement on 3/4” thick carbon steel to be welded at 30°F. Post weld heat-treat on 1 1/4” alloy steel. Options for using 2 gaskets at one flanged connection. Experience of owner's inspector. Example of a radiographteport with 2 sets of defects - was the weld acceptable. Question on modulus of elasticity. Venting space between flanges. ASME Section V “The temperature of the calibration block should be no more than _different than the test piece. 2. 10°F b. 15°F ©. 25°F 6. 40°F What code governs the qualifations of SNT-TC-1A personnel: (Poor Question) ‘Sec a. Sec. 8 b. Sec ©. Sec.2 d. ASME 831.3 COPYRIGHT 2001 mrt, SCHINOLER, J. COLEY ANO CODEWEST - ALL FUGHTS RESERVED -00 NOT COPY OR DISTRIBUTE. 37” API-STO PRESTUDY GUIDE -T. SCHINDLER ‘COPYRIGHT 2001 IRC. SCENDLER,.W_COLEY AND CODEWEST ALL FUGHTS RESERVED -00 NOT COPY OR DISTRIDUTE 3. Ifyou sawa dark °B" image on the (radiographic) fm, what does it mean? fa, back scatter radiation is a problem b. back scatter radiation is acceptable . °B" for bumthrough a 4. How isthe wire penetrameter placed on the weld? ‘8. Wires perpendicular to the weld . Wires parallel tothe weld ‘c. Wires away from the weld ¢. 2are used 1 parallel, 1 perpendicular 5. Question pertaining to Art, 2 - 7222.2 6. Whats used to evaluate image quality? 2. b ° 4, Penetrameter 7 AR2-T23A 8 Using a calibrated step wedge film traceable to a national standard. Art 2 8 An2-T273 40. Location markers Art. 2- 44, At2-Number of Penetrameters 12. Ast. 2-Qualty of Radiograph 2. fogging b. creases . streaks, watermarks, 4. allof the above 13. _Art2- Radiographic Density 14, An. 2-7282.2(@) 45, Frequency of transducer shell have a generating frequency of : 10 MHz . 1-25 MHZ <1 MHz 1-5 MHz, 46. On.a completed weld, LPT would detect all the following except: a. cracks i . porosity «. laminations di laps comYRIONT 201 RET, SCHINDLER JW, COLEY AND COOEWEST- AL RITE RERERVED 00 HOT COPY OF DESTRIUTE 38API-570 PRESTUDY GUIDE - T. SCHINDLER COPYRIGHT 2001 ~ RET. SCHINDLER , JW. COLEY AND CODEWEST -ALL RIGHTS RESERVED -DO NOY COPY OR DISTRIBUTE. 17. Ant 6- Drying after using a water-washable penetrant 18. Art 6 - Drying range 19. Art. 6- T6734 20. Art.6 -Emuisfication Time 21, Art. 6- Final Interpretation 22, At.6- T76-4(D) 23. Art. 7-T744.a(d) 24. Calibration of ammeter Art. 7 25, Art. 7- T762(a) 26. Using a DC yoke can find: a. near surface b. back surface «internet 27. Art. 9- Vision requirements ‘ASME Section 1 (art. 1) 2. (Art1) related to 1962 edition of the Code. 3. Qualification of welders by RT on first production weld, 4, Tensile strength of test specimen for POR. 5, 4 side bend tests - passed, is this an acceptable test for 2 3/4” test plate, related defect size. 6 Fillet eg size. 7. Inthe welding process using SMAW, is the removal of backing an essential variable. 8 Essential variables of a WPS/POR. 9. Certified PAR 10. Qualification of a welder to do the owner's welding. 11, PR's to qualify WPS's. 12, _ In SMAW which is an essential variable in a WPS. a. Groove design b. F number c. Welding technique “COPYRIGHT 2001- IRE. SCHINDLER, JW. COLEY AND CODEWEST - ALL RIGHTS RESERVED -00 NOT COPY OR DISTRIBUTE 39: ._ API-570 PRESTUDY GUIDE - T. SCHINDLER ‘COPYRIGHT 2001 INIT. SOHIMOLER JW, COLEY AND CODEWEST -ALL RUGHTS RESERVED -DO NOT COPY OR DISTRIBUTE 13, Welder retest 14. GMAW on P2X-can it be qualified by RT (Using shot circuiting mode) 15. Expiration of Qualifications - 6 month period. 16. _Anneaiinginormatzing defintion. 7 PP. 18. On comparison between POR, to WPS, @ change in filer metal from E7018 (POR) to E7016(WPS) - is # an essential variable. 19. Pipe qualification forall positions - use SG and what else, * API RP 574 Code for valve inspection and test (std. 588) 2. Venturi valves should not be used in lines that are to be pigged. 3. What type of vale is used to prevent backflow? 4. Use of slide valves in gas service. 5. Leaks in operating systems - should the operators notiy the inspector? 6 _Repsirof leaks to prevent serious corrosionferesion of gasket surfaces or packing glands. 7. Deformation of a vessel wall in the vicinity ofa pipe attachment. ‘Adecrease in downstream pressure accompanied by a decrease in fiow. What is it indicative of? ‘ 9. Temperature above _can damage UT transducers. 10. Advantages of RT: 44. Penetrant liquids with _ should be used for austenitic matertals 42. What defects can MPI detect: 1a, surface cracks 'b. subsurface (near-surface) (Lamination) c. porosity 4. allof the above 43. Valves measured for thickness between the seats. 44, leaking threaded joint should not be tightened while the system is in service, 45, _Clamped joints must not be used without adequate axial restraint on the piping. 16. Use of hammer testing on inservice systems. ‘coPrrUOHT 201 - R/T. SCHNDLER, JW, COLEY AND CODEWEST -ALL RIGHTS REBERVED -DONOT COPY OR DISTRIBUTE 40_ API-570 PRESTUDY GUIDE -T. SCHINDLER COPYRIGHT 2001 IRC, SCHRNDLER , JW. COLEY AND CODEWEST ALL RIGHTS RESERVED -00 NOT COPY OR DISTRIBUTE, ASME 16.5 1. Gasket diameter (OD) -Group 1b, 12°, 400# flange. 2, Which marking is not required on a flange. ‘a. Manufacturer's name or trademark b. temperature «. rating class ¢. designation 3. Thickness of raised face on @ 300# class flange . a, 120° b. 060" c. 040" 6. 025" 4. Low strength bolting Use botts not more than. spec. min yield strength. 30 ksi ACTUAL PAST TEST QUESTIONS FROM JUNE, 1999 EXAM OPEN BOOK - 53 QUESTIONS ccopyicit 201 - RCT. SOHNDLER, 4. COLEY AND CODEWEST- AL IGHTS RESERVED at 00 NOT COPY OR DISTRIBUTEAPI-S70 PRESTUDY GUIDE -T. SCHINDLER ‘COPYRIGHT 2001 ~IRC/T, SNOLER, JW. COLEY ANO CODENEST- ALL RIGHTS RESERVED -DO NOT COFY OR DISTRIBUTE. CLOSED BOOK - 97 QUESTIONS: ‘OPEN BOOK 4. During periodic scheduled inspections, a more extensive inspection should be applied to an area ‘beginning 12 inches upstream of the injection nozzle and continuing ? 2. Information given: Design is 500 psi, 900 degrees (f) and material is A182-GR F2. What s the ‘minimum acceptable flange? MAWP problem ‘Tm for blank Ae Hydro test at SUS. 6. __ Branch connection - Sketch 2 — weld thickness; heat treat 7. Wire penetrameter placement. 8. ACIDCiiting strengths for yokes. 9. Was base metal thickness range correct on WPS. 40. - Was root spacing shown on WPS (No itwasn* but was clarified by note that is would appear on production drawings) 11, Was tensile and bend tests okay. 42. Underground piping non cathodic protected at 1500 resistivity what is inspection interval 13. RL problems 44, CR-STandLT 18, Hydro pressure of flanges — por 16.5 46. Thickness of bind flange ~ per 16.5 47, Material classes per Table ~ per 16.6 18. For UT thickness detection, the difference in temperature ofthe cal bck surface from the pipe surface shall be no greater than ‘A. 10 Degrees B. 15 Degrees ©. 25 Degrees D. 50 Degrees 49. _ PMI-What method is not a stand alone method? Chemical spot test. Eddy current test? Per 570 ‘Xray fluorescent ‘Optics spectrographic 20. Youre visually Inspecting @ Ciass- piping ccult and notice some areas on which the insulation res been damaged. On what percentage of the piping would you remove insulation or follow-up with additional NDE? COLEY AND CODEWEST -ALL RIGHTS RESERVED -D0 NOT COPY OR DISTRIBUTE CCOPHRUGHT 201 IRC. SCHINDLER, J 42‘API.S70 PRESTUDY GUIDE - T. SCHINDLER CCoPrIvGHT 2001 mor. SCHINDLER J. COLEY AND CODEWEST ALL RIGHTS RESERVED -DO NOT COPY OR DISTRIBUTE 21. When performing a hydrostatic pressure test with a flammable fiquid as your testing medium, ‘hat isthe minimum flash point of that quid to Insure a safe work environment? A. 100deg. F B. 120deg. F C. 140deg. F D. 160 deg. F 22. What would you look for when inspecting a 10 NPS (or 12) piping system with a bellows type expansion joint? 23. Had weld indications on R.7. of weld (IP & slag) and wanted to see if they were acceptable per Table 341.3.2 (31.3) based on lengths. 24, Austenitic SS - Inspect for cracks options included - MT, UT, LP, EC. 25. When can an inspector give approval for repair without an engineers approval? 26. Youhavea thing area near a long. weld... 27. Had a RL. problem with 3 TML's and data for 3 different dates. Had to calculate 6 different S.TJL.T. com. rates, 28. Had a RT shot where gave you so much IP, slag, and another defect for normal service. Had to carefully add up all the #'s and check versus chart. 29. Asked the VT “eyes 24” away and < 30° angle" question. 30. ANPS 10 piping system may have test points which should not have a diameter greater than az bs a4 6. 10" 31. During periodic scheduled inspection, more extensive inspection should be applied to the injection point circuit in an area beginning ___Aspstream of the injection point. 32. Special equipment is available to permit the use of pulse-echo instruments at temperatures up to a. 900 b. 1000 ©. 1100 4. 1200 33, One question on recommended preheat temperature on @ P-No 1 material 1.25" thick. 34, Two questions from Table 341.3.2 on normal fuid service, on allowable IP and height of reinforcement allowed. 35, One hydro test pressure on a piping system using 70 steam. ‘One question of what is the minimum flashpoint of a fiemmable quid of used for test uid, ‘Answer was 120 37, One question from the performance qualification table for welders QW 452.1, COPrRIGHT 2011 - IRE, SCHINDLER, JW. COLEY ANO CODEWEST- ALL RIGHTS RESERVED -D0 NOT COPY OR DXSTRIGUTE, 43‘APL-S70 PRESTUDY GUIDE - T. SCHINDLER CCoPvruci 201 - Inc. SCHINDLER, 3. COLEY AND CODEWEST ALL RIGHTS RESERVED -DO HOT COPY OR DISTRIBUTE 38. If test coupon was .750" thick, how many side and face bends are required? a. 2and2 'b, no side and face bends are required ©. 4and4 d. Sand 3 38. A longitudinal bend testis where the weld is parallel to the longitudinal axis of the specimen, ‘hich is bent so that the face surface becomes the ‘surface of the bent specimen. a. concave b. convex c 4 40. What determines radiographic quality? Answer available — density and penetrameter 41. Whatis minimum density of a radiograph taken with Cobalt 60? a. 1.8 b. 20 ©. 3.0 d. 4.0 42. Several questions with Ohm's of resistance given for underground P. asking for inspection frequency. 43. Ifa welder is qualified in GMAW, GTAW and SMAW, and he continued to weld only with SMAW, how long will he stay qualified in the other methods? a, 6 mos boty c. 2y8 4d. he's not qualified ‘While inspecting en NPS ( 10 or 12) you find an area of localized corrasion on a pipe cap. {a Pipe caps are usually no concem when inspecting b. cap must be evaluated using ASME Sect. 8 Div. 1
You might also like
API 510 Exam B (150 Q&A)
PDF
88% (24)
API 510 Exam B (150 Q&A)
45 pages
Asme PCC-2 - 2022 Highlighted
PDF
91% (11)
Asme PCC-2 - 2022 Highlighted
112 pages
AWS - Study Guide For API Standard 1104 - 21st Edition - 2017.pdf Versión 1
PDF
100% (8)
AWS - Study Guide For API Standard 1104 - 21st Edition - 2017.pdf Versión 1
182 pages
NDT Basic Question Paper (700 Q & A)
PDF
87% (15)
NDT Basic Question Paper (700 Q & A)
113 pages
ASNT Level III Study Guide Electromagnetic Testing (ET), Third E PDF
PDF
100% (11)
ASNT Level III Study Guide Electromagnetic Testing (ET), Third E PDF
101 pages
ASME - PCC-2 - Study - Guide - 510
PDF
100% (9)
ASME - PCC-2 - Study - Guide - 510
48 pages
Radiographic Film Interpretation - Presentation-1 PDF
PDF
91% (11)
Radiographic Film Interpretation - Presentation-1 PDF
87 pages
Level Iii Basic Study Guide
PDF
68% (22)
Level Iii Basic Study Guide
116 pages
Asnt Level 3 Exam Penetrant Test
PDF
86% (35)
Asnt Level 3 Exam Penetrant Test
40 pages
ASNT Handbook Volume 2 Liquid Penetrant Testing
PDF
94% (32)
ASNT Handbook Volume 2 Liquid Penetrant Testing
498 pages
Paut Full PDF
PDF
97% (29)
Paut Full PDF
353 pages
Asme Section Viii Div-1,2,3
PDF
91% (43)
Asme Section Viii Div-1,2,3
73 pages
Asnt NDT Level 3 Basic Exam
PDF
88% (32)
Asnt NDT Level 3 Basic Exam
5 pages
API 570 Piping Inspector - Volume 1
PDF
100% (10)
API 570 Piping Inspector - Volume 1
617 pages
Vol 1 API 570
PDF
100% (2)
Vol 1 API 570
228 pages
Interview ASME SEC IX & General QUESTIONS
PDF
86% (7)
Interview ASME SEC IX & General QUESTIONS
45 pages
QC Welding Inspector Interview
PDF
100% (10)
QC Welding Inspector Interview
286 pages
API 570 Piping Inspection
PDF
100% (13)
API 570 Piping Inspection
35 pages
1.PAUT Coursenote
PDF
100% (10)
1.PAUT Coursenote
194 pages
Api - 570 (1000+ Q&A)
PDF
100% (4)
Api - 570 (1000+ Q&A)
117 pages
Aws Scwi Chennai 2021
PDF
0% (1)
Aws Scwi Chennai 2021
7 pages
CSWIP 3.2 Course Material 2016
PDF
97% (30)
CSWIP 3.2 Course Material 2016
418 pages
API 570 Closed Book Question Paper
PDF
78% (9)
API 570 Closed Book Question Paper
41 pages
ASNT Level I II III Questions and Answers Book A-Radiographic Testing Method PDF
PDF
100% (10)
ASNT Level I II III Questions and Answers Book A-Radiographic Testing Method PDF
69 pages
API 570 - Course Notes
PDF
97% (33)
API 570 - Course Notes
173 pages
ASNT Level II Study Guide Visual PDF
PDF
100% (3)
ASNT Level II Study Guide Visual PDF
66 pages
API 570 Pre Study Guide 1 PDF
PDF
No ratings yet
API 570 Pre Study Guide 1 PDF
23 pages
MC1
PDF
No ratings yet
MC1
5 pages
MC3
PDF
No ratings yet
MC3
5 pages
API Exam Ques & Ans
PDF
100% (1)
API Exam Ques & Ans
216 pages
Api 577
PDF
No ratings yet
Api 577
6 pages
ASNT Calculator Guide
PDF
No ratings yet
ASNT Calculator Guide
14 pages
API 1104 Errata - 4and5
PDF
No ratings yet
API 1104 Errata - 4and5
5 pages
Welding Product Technology Theory
PDF
No ratings yet
Welding Product Technology Theory
4 pages
SNT - TC - 1a 2011 Edition
PDF
100% (1)
SNT - TC - 1a 2011 Edition
40 pages
AWS CWI Training Program Brochure
PDF
No ratings yet
AWS CWI Training Program Brochure
4 pages
MT COURSE 002
PDF
No ratings yet
MT COURSE 002
6 pages
Asme Sec Ix Mock
PDF
No ratings yet
Asme Sec Ix Mock
28 pages
Welding Inspection Questions Wis
PDF
No ratings yet
Welding Inspection Questions Wis
5 pages
MT Questions
PDF
No ratings yet
MT Questions
14 pages
Math Sample Test
PDF
100% (1)
Math Sample Test
12 pages
Asme Ix.
PDF
No ratings yet
Asme Ix.
23 pages
Lecture 15-UT
PDF
No ratings yet
Lecture 15-UT
29 pages
NDT - Magnetic Particle
PDF
No ratings yet
NDT - Magnetic Particle
73 pages
MT Magnetic Particle Testing Level 1 2
PDF
No ratings yet
MT Magnetic Particle Testing Level 1 2
6 pages
PT Sev - Ye Ii Deneme Test - NG - L - Zce
PDF
No ratings yet
PT Sev - Ye Ii Deneme Test - NG - L - Zce
10 pages
577 Quize 1
PDF
100% (1)
577 Quize 1
37 pages
Body of Knowledge PDF
PDF
No ratings yet
Body of Knowledge PDF
1 page
3804274-ANSI-ASNT_CP-105_2024_Edition
PDF
No ratings yet
3804274-ANSI-ASNT_CP-105_2024_Edition
15 pages
Closed Book API 510 Practice Exam A
PDF
No ratings yet
Closed Book API 510 Practice Exam A
1 page
Asnt LT Level III - Notes - Par by Dr. Samir Saad
PDF
No ratings yet
Asnt LT Level III - Notes - Par by Dr. Samir Saad
71 pages
ASME Sec V ART 4 Ap 4
PDF
No ratings yet
ASME Sec V ART 4 Ap 4
5 pages
API 1104 - PRACTICE EXAMINATION _1
PDF
No ratings yet
API 1104 - PRACTICE EXAMINATION _1
10 pages
PTS 15.12.05 (Aug 2014) Duplex and Super Duplex Stainless Steel Pipeline Field Welding
PDF
No ratings yet
PTS 15.12.05 (Aug 2014) Duplex and Super Duplex Stainless Steel Pipeline Field Welding
57 pages
Asme Section 9 Exercises Api Asme Resources
PDF
No ratings yet
Asme Section 9 Exercises Api Asme Resources
25 pages
Daily Points To Recall (Day 4) : Page 1 of 2
PDF
No ratings yet
Daily Points To Recall (Day 4) : Page 1 of 2
2 pages
Liquid Penetrant Testing
PDF
100% (1)
Liquid Penetrant Testing
52 pages
Cswip3 2
PDF
No ratings yet
Cswip3 2
249 pages
Basic Questions
PDF
No ratings yet
Basic Questions
21 pages
Ultrasonic Testing Training
PDF
No ratings yet
Ultrasonic Testing Training
6 pages
Weld Defects& Solutions
PDF
No ratings yet
Weld Defects& Solutions
5 pages
NDT Magnetic Particle (Home Study) PDF
PDF
No ratings yet
NDT Magnetic Particle (Home Study) PDF
411 pages
WPS PQR
PDF
100% (1)
WPS PQR
12 pages
Senior Welding Inspection
PDF
No ratings yet
Senior Welding Inspection
190 pages
Cswip Exams 2 PDF
PDF
No ratings yet
Cswip Exams 2 PDF
99 pages
Basic ASNT Level III Notes Part 1-Dr - Samir Saad
PDF
No ratings yet
Basic ASNT Level III Notes Part 1-Dr - Samir Saad
112 pages
NIg 4th Trip PT General
PDF
No ratings yet
NIg 4th Trip PT General
8 pages
Liquid Penetrant Testing
PDF
No ratings yet
Liquid Penetrant Testing
38 pages
API 580 2007 Sept Full Questions
PDF
No ratings yet
API 580 2007 Sept Full Questions
5 pages
Automatic Ultrasonic Course: Issued By: Ganzory
PDF
No ratings yet
Automatic Ultrasonic Course: Issued By: Ganzory
58 pages
RTFI Questionnaire
PDF
No ratings yet
RTFI Questionnaire
48 pages
Confidence You Can See: Omniscan X3 Phased Array Flaw Detector With TFM
PDF
No ratings yet
Confidence You Can See: Omniscan X3 Phased Array Flaw Detector With TFM
5 pages
ASNT LEVEL 3 Penetrant Testing Part 2
PDF
No ratings yet
ASNT LEVEL 3 Penetrant Testing Part 2
42 pages
RI Appendix 1 Part 5c Radiographic Inspector 1st Edition April 2018
PDF
No ratings yet
RI Appendix 1 Part 5c Radiographic Inspector 1st Edition April 2018
12 pages
Basic Examinations Exam
PDF
No ratings yet
Basic Examinations Exam
2 pages
Basc QB 2
PDF
No ratings yet
Basc QB 2
3 pages
8 - 2!1!042 - Magnetic Testing Examination Guide For Initial Certification
PDF
No ratings yet
8 - 2!1!042 - Magnetic Testing Examination Guide For Initial Certification
32 pages
RSR NDT For Ut-II 2022
PDF
No ratings yet
RSR NDT For Ut-II 2022
143 pages
API 510 Course
PDF
No ratings yet
API 510 Course
461 pages
API 510 Closed Exam Part I
PDF
No ratings yet
API 510 Closed Exam Part I
24 pages
Api 577 Quastion01
PDF
No ratings yet
Api 577 Quastion01
2 pages
MT Q3[1]
PDF
No ratings yet
MT Q3[1]
5 pages
API 570 Piping Inspector Certification Preparatory
PDF
100% (1)
API 570 Piping Inspector Certification Preparatory
4 pages
API 570 Piping Inspector Certification Preparatory
PDF
No ratings yet
API 570 Piping Inspector Certification Preparatory
4 pages
Api 510
PDF
No ratings yet
Api 510
78 pages
Weld Defects
PDF
100% (8)
Weld Defects
45 pages
API 570 Piping Inspector - Volume 2
PDF
75% (4)
API 570 Piping Inspector - Volume 2
297 pages
Asme Section Viii Div.1
PDF
100% (10)
Asme Section Viii Div.1
87 pages
ASME Section IX - Updated
PDF
100% (5)
ASME Section IX - Updated
260 pages
ASME VIII Div.1 Presentation
PDF
100% (15)
ASME VIII Div.1 Presentation
282 pages