Raft & Pedestal Reinforcement
Raft & Pedestal Reinforcement
M, M= 160 t-m
with 4 no. of bars spacing in 1 m length = 333.3333 mm> codal provision of 'maximum s
minim area of steel (0.12 % of c/s area) = 1350 mm2 < provided area of steel
safe
PROVIDING 25MM dia FE 415 HYSD BARS @ 250 mm C/C.
al provision of 'maximum spacing of 300mm'
INPUT PARAMETERS
Size of Columns L B
A1 0.6 mts. 1.2 mts.
A2 0.6 mts. 1.2 mts.
A3 0.6 mts. 1.2 mts.
A4 0.6 mts. 1.2 mts.
A5 0.6 mts. 1.2 mts.
A6 0.6 mts. 1.2 mts.
A7 0.6 mts. 1.2 mts.
B1 0.6 mts. 1.2 mts.
B2 0.6 mts. 1.2 mts.
B3 0.6 mts. 1.2 mts.
B4 0.6 mts. 1.2 mts.
B5 0.6 mts. 1.2 mts.
B6 0.6 mts. 1.2 mts.
B7 0.6 mts. 1.2 mts.
Total load
Grade of Concrete 30
Grade of Steel 415
σcbc 10 n/mm2
m 9.333333
σst 130 n/mm2
Eccentricity along X-Direction is obtained by taking moment of column loads about grid 1-1
direction about 1-1
Sl. No. Column No. Loads in Tonne(Pi) (Xi) P i * Xi
1 A-1 74.53 0 0
2 B-1 72.61 0 0
3 A-2 74.53 6.955 518.3562
4 B-2 72.61 6.955 505.0026
5 A-3 74.53 13.71 1021.806
6 B-3 72.61 13.71 995.4831
7 A-4 74.53 20.465 1525.256
8 B-4 72.61 20.465 1485.964
9 A-5 74.53 27.22 2028.707
10 B-5 72.61 27.22 1976.444
11 A-6 74.53 33.975 2532.157
12 B-6 72.61 33.975 2466.925
13 A-7 74.53 40.93 3050.513
14 B-7 72.61 40.93 2971.927
TOTAL 1029.98 21078.54
𝑋 ̅=(𝑃_𝑖
𝑋_𝑖)/𝑃_𝑖 𝑋 ̅ 20.465 m
ex 0.3 m
Eccentricity along Y-Direction is obtained by taking moment of column loads about grid B-B
direction about B-B
Sl. No. Column No. Loads in Tonne(Pi) (Yi) Pi * Y i
1 A-1 74.53 10.5 782.565
2 B-1 72.61 0 0
3 A-2 74.53 10.5 782.565
4 B-2 72.61 0 0
5 A-3 74.53 10.5 782.565
6 B-3 72.61 0 0
7 A-4 74.53 10.5 782.565
8 B-4 72.61 0 0
9 A-5 74.53 10.5 782.565
10 B-5 72.61 0 0
11 A-6 74.53 10.5 782.565
12 B-6 72.61 0 0
13 A-7 74.53 10.5 782.565
14 B-7 72.61 0 0
1029.98 5477.955
𝑌 ̅=(𝑃_𝑖
𝑌_𝑖)/𝑃_𝑖 𝑌 ̅ 5.318506 m
ey 0.681494 m
𝑀_𝑋 = P×
e𝑀_𝑌
Moment about X-axis 308.994 T-mt.
Moment about Y-axis x = P× 701.925 T-mt.
eY
P/A 2.066739 T/M2
𝜎=𝑃/𝐴±𝑀_𝑦/𝐼_𝑦 𝑥 ±𝑀_𝑥/𝐼_𝑥 𝑦
Net Safe Bearing Capacity of soil ( from soil report) 80 T/M2
(My/Iy)*x 0.203487 T/M2
(Mx/Ix)*y 0.310011 T/M2
(i) 1/2(𝜎_(𝐴−1)+𝜎_(𝐴−7))
Beam A-A with 7.5 mt. width & soil pressure of 1.756728 T/M2
1/2(𝜎_(𝐵−1)+𝜎_(𝐵−7))
(ii) Beam B-B with 7.5 mt. width & soil pressure of 2.37675 T/M2
𝑑=√𝑀/𝑄𝑏
Depth of Raft required ; d
K 0.41791
𝑄=1/2 𝐽𝐾𝜎_𝑐𝑏𝑐
J 0.860697
Q 1.79847
shear @ A-1
0.6
𝜏_𝑣=𝑉_𝑢/(𝑏_𝑜 𝑑)
0.3
1.2
1.5+0.5d
0.5d
0.5d
0.6+0.5d
Ax2+Bx+C=0
1.37d(2d+4.2) = 1117950
2.74 d +
2
5.754 d+ -1117950 =0
dreq = 637.7082 mm OK
shear @ B-1
0.6
0.5d 𝜏_𝑣=𝑉_𝑢/(𝑏_𝑜 𝑑)
1.5+0.5d
1.2
0.3
0.6+0.5d
Ax2+Bx+C=0
1.37d(2d+8.5)= 0
2.74 d +
2
5.754 d+ -1089150 =0
dreq = 629.4269 mm OK
shear @ B-3
0.6
0.5d 𝜏_𝑣=𝑉_𝑢/(𝑏_𝑜 𝑑)
1.5+0.5d
1.2
0.3
0.5d 0.5d
1.37d(3d+4.2)= 1089150
dreq = 514.082 mm OK
𝑀_𝑚𝑎𝑥=0.87×𝑓_𝑦×𝐴_𝑠𝑡×(𝑑−(𝑓_𝑦×𝐴_𝑠𝑡)/(𝑓_𝑐𝑘×𝑏))
eff. Depth of raft provided 1125
0.87fy 361.05
Mmax/0.87fy 984874.4
fy/(fck*b) 0.013833
Ax2+Bx+C=0
A 0.013833
B -1125
C 984874.4
Ast 885.0763 mm2/Mt.
80440.22 mm2/Mt.
min. Reinforcement @ 0.12% of x-sec area per mt. length 1350 mm2/mt. ˃Ast calculated
Load in
Ton 0.3
74.53 A
74.53 1.2
74.53 0.6 0.6 0.6
74.53
74.53
74.53 12 10.5 5155
74.53 2200
72.61
72.61
72.61 B
72.61 1.2
72.61 0.3
72.61 6.955 6.755 6.755
72.61 1 2 3
1029.98 Tonne
2×{(0.5𝑑+0.6)+(0.5𝑑+1.5)}𝑑)
6)+(0.5𝑑+1.5)}𝑑)
_𝑠𝑡)/(𝑓_𝑐𝑘×𝑏))
˃Ast calculated
Delivery Side
4 5 6 7
41.53
75
50
200
raft depth 1200
550
200
50
75
= 1410.35 mm
Vus = V- Ʈc*b*d
= -2403750 N
since value is negative so concrete itself capable to resist shear
Although minimum shear reinforcement has to be provided
Asv 0.4
As per formula =
b*Sv 0.87*fy
on using 2 legged 12 mm dia bars as stirrups
so, Asv = 226.1947 mm2
spacing of stirrups Sv = 204.169 mm
0.52
1.103
0.583
5.155 2.37
1 In 2.835 m length
2 In 2.320 m length
Periphery Reinforceent
1 In 1.103 m length
nominal cover 0.075 mm
spacing of bars 200 mm 0.2 m
no. of bar 1.103 m length 6 no.
2 In 0.583 m length
nominal cover 0.075 mm
spacing of bars 200 mm 0.2 m
no. of bar 0.583 m length 4 no.
3 In 2.835 m length
nominal cover 0.075 mm
spacing of bars 200 mm 0.2 m
no. of bar 2.835 m length 15 no.
4 In 2.320 m length
nominal cover 0.075 mm
spacing of bars 200 mm 0.2 m
no. of bar 2.32 m length 12 no.