Report Number 1.0 | November 28, 2024
1.0 Introduction
202
Capital
apital R
Replacement
eplacement V
Value
alue
1.1 Mandate
BTY Group (“BTY”) has been retained by Stantec (The Client”) to review the Westbrook Tower building located
in Calgary, AB, and provide an assessment of the replacement construction cost. It is assumed that this
exercise is undertaken to give an indication of costs for insurance or appraisal purposes and presents the
results of BTY’s assessment.
Information related to the Project for the purposes of this report was received by BTY up to October 30th,
2024. Please refer to Section 7.0 for a list of information received in producing this report.
1.2 Limitation
This report has been prepared at the request of Stantec and is the exclusive property of BTY Group and the
Client. The report and its findings are based on information provided by Stantec and site reviews conducted by
BTY.
For this exercise, partially detailed designs were reviewed to enable BTY to complete an estimate of the
buildings. As such, the costs provided herein are indicative only and represent the replacement construction
costs of the asset, assuming replacement of a comparable building in the same location, constructed to a
similar specification, but to meet the current building code.
1.3 Contacts
Should you have any queries regarding the content of this report, please do not hesitate to contact either of
the following:
#1610, 112 4 Ave SW, Calgary, AB T2P 3N3 |403 269 5155
This report has been prepared at the request of Stantec and is the exclusive property of BTY Group. The information must be treated as
confidential and not to be disclosed, reproduced or permitted to be disclosed to any party without the prior consent of BTY Group.
1
DRA
Stantecc | Westbrook
RA
ok TTower
ower B
Building
uilding - C
Report Number 1.0 | November 28, 2024
#1610, 112 4 Ave SW, Calgary, AB T2P 3N3 |403 269 5155
This report has been prepared at the request of Stantec and is the exclusive property of BTY Group. The information must be treated as
confidential and not to be disclosed, reproduced or permitted to be disclosed to any party without the prior consent of BTY Group.
2
DRA
Stantecc | Westbrook
RA
ok TTower
ower B
Building
uilding - C
Report Number 1.0 | November 28, 2024
To establish the construction costs of the buildings, our assessments took into consideration the following
factors:
3.1 Location
Consideration of a property’s location is a significant factor when estimating construction costs. Canada is
particularly susceptible to this factor given the country’s size and distribution of population throughout the
provinces. Our assessment process involved verifying the location of each property by town or city and
province. BTY Group have offices located throughout Canada and therefore we have used our local offices to
capture the relevant cost data. This local market intelligence has provided us with sound benchmark
information for which to base our pricing.
3.5 Areas
The gross floor area (GFA) was measured from the as-built drawings provided by Stantec, and used as the basis
for estimating the construction costs. A building’s GFA can be defined as the total floor area of the building
including the external walls, and excluding the roof.
L ocation Total
Parkade (P3) 2,815 m²
Parkade (P2) 2,507 m²
Parkade (P1) 2,495 m²
Level 1 974 m²
Level 2 1,922 m²
Level 3 2,273 m²
Level 4 2,273 m²
Penthouse 1,009 m²
Total Gross Floor Area 16,267 m²
This report has been prepared at the request of Stantec and is the exclusive property of BTY Group. The information must be treated as
confidential and not to be disclosed, reproduced or permitted to be disclosed to any party without the prior consent of BTY Group.
3
3.6
DRA
Stantecc | Westbrook
RA
ok TTower
ower B
Building
uilding - C
Report Number 1.0 | November 28, 2024
Pricing
202
Capital
apital R
Replacement
eplacement V
Value
alue
Construction unit rates have been obtained from our own in-house construction cost library and from current
construction projects BTY are involved with. Where possible, recent tenders and quotations are used for
comparative purposes. In the circumstance where specific 2024 cost data was not available, unit rates have
been updated, taking into consideration escalation over the period for the location. Construction costs were
then calculated by multiplying the gross floor area (ft²) by the unit rate ($/ft²).
The costs provided represent the replacement construction costs of the asset, assuming replacement of a
comparable building in the same location, constructed to a similar specification, and to meet the current
building code.
1. The scope of work includes the Westbrook tower together with the three level parkade an the immediate
surrounding of the building. It does not include the C-train tunnel or station.
2. As advised by the client, only the exterior cladding and exterior doors for the C-train station are included
in this scope.
3. Structure is assumed to consist of a combination of concrete and structural steel.
4. Interior stairs is steel with concrete filled pans and steel railings.
5. Roofing system utilized is TPO membrane and metal roofing.
6. Allowance included for curtain wall, metal panels, sun shade, glass canopies, tempered glass walls.
7. Allowance included for dewatering and shoring.
8. Allowance included for masonry and steel stud partition including wall, floor and ceiling finishes.
9. Allowance included for metals, millwork, specialties and elevators.
10. Electrical systems, service & distribution, lighting, etc.
11. Emergency power systems for base building power, emergency lighting and base building UPS systems.
12. Security and access control systems.
13. Telecommunication systems (incoming telephone service and internet service, and distribution through
the building, and PA systems.
14. Active fire safety systems (suppression systems, fire alarm systems, stairwell pressurization/smoke
evacuation systems, exit signage)
15. Assumptions have been made regarding the interior partitions, doors, and fittings.
#1610, 112 4 Ave SW, Calgary, AB T2P 3N3 |403 269 5155
This report has been prepared at the request of Stantec and is the exclusive property of BTY Group. The information must be treated as
confidential and not to be disclosed, reproduced or permitted to be disclosed to any party without the prior consent of BTY Group.
4
DRA
Stantecc | Westbrook
RA
ok TTower
ower B
Building
uilding - C
Report Number 1.0 | November 28, 2024
16. Sitework is assumed to included sidewalks, ramps asphalt road, site improvement and landscape.
17. Estimate is based on as-built drawings provided. If any alterations and/or tenant improvement works have
been undertaken outside what is shown on the drawings, these have not been included in our estimate.
18. Building Code - Cost estimate assumes replacement to meet current Building Code.
19. Per section 2.1 above, separate allowances have been shown for Development Soft Costs. These are
based on reasonable percentages with reference to projects of similar nature
20. Our estimate is based on current dollar.
Please note that BTY is not qualified to act as a design consultant. The assumptions in our estimate should be reviewed and corrected by
the design team.
5.0 Exclusions
The construction estimate includes all direct and indirect construction costs derived from the drawings and
other information provided by the Consultants, with the exception of the following:
1. Land costs
2. Demolition Costs
3. Financing Costs
4. Taxes and Levies
5. Specialist Plant and Equipment
6. Escalation
7. Remediation of contaminated materials
8. C-train station, Tunnel and Railway tracks
9. Specialty equipment such as substation and operation centre equipment and library book sorters, etc.
10. Legal fees and agreement costs / conditions
11. Removal of hazardous materials from existing site and building
12. Phasing of the works and accelerated schedule
13. Decanting & moving
14. Costs associated with “LEED” certification
15. Project commissioning (Third Party)
16. Erratic market conditions, such as lack of bidders, proprietary specifications
17. Goods and Services Tax (G.S.T.).
#1610, 112 4 Ave SW, Calgary, AB T2P 3N3 |403 269 5155
This report has been prepared at the request of Stantec and is the exclusive property of BTY Group. The information must be treated as
confidential and not to be disclosed, reproduced or permitted to be disclosed to any party without the prior consent of BTY Group.
5
DRA
Stantecc | Westbrook
RA
ok TTower
ower B
Building
uilding - C
Report Number 1.0 | November 28, 2024
No cost escalation allowance has been included in this estimate. BTY strongly recommends that the client
establish a separate budget to cover the escalation cost from the date of this estimate. Our current projected
escalation rates are shown below for reference
Our current projected escalation rates are shown below. In the event that there is slippage in the schedule,
further escalation based on the projected escalation rate per annum should be included in the estimate.
Description R evised
d Date
Drawings & Specifications
0000 - Arch drawings - ORIGINAL BUILDING ~2013 January 11, 2013
2018-05-08 - OCCPHB TP#1 to TP#4 - Record Drawings May 8, 2018
TP#2 Architectural As Builts June 12, 2015
TP#3 Issued for Tender and Construction R1 (20151117) November 17, 2015
TP2-Issued for TenderBuildingPermit&Const (JUNE 12 2015) June 12, 2015
Westbrook OCC Structural (Issued for TP1 May 8 2015) May 8, 2015
Electrical Record Drawings Package TP#4 July 24, 2018
2493 AS Builts (electrical) March 31, 2016
Mechanical Drawings - TP4 IFT, P, C - Stamped March 31, 2016
This report has been prepared based on information provided by Stantec up to the date of issue of this report.
BTY Group has reviewed the information provided, and as part of our due diligence procedures to ensure the
accuracy of the construction costs reported. BTY Group cannot accept accountability for information that has
not been provided or is not available at the time of preparing this report.
#1610, 112 4 Ave SW, Calgary, AB T2P 3N3 |403 269 5155
This report has been prepared at the request of Stantec and is the exclusive property of BTY Group. The information must be treated as
confidential and not to be disclosed, reproduced or permitted to be disclosed to any party without the prior consent of BTY Group.
6
COST MANAGEMENT REPORT