0% found this document useful (0 votes)
7 views

Devang Adarsh-Final02-03-12-2024

Uploaded by

bh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

Devang Adarsh-Final02-03-12-2024

Uploaded by

bh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Sr No Description Length Height Sq.

Ft Rate Amount

Carpentary Works Including Labour, MR Plywood


A
and Hardware only
Living Room
All Door Repairng and Hinges, Lock, and Handle
Change-06Doors-Décor Brand 1 6 6 13000 78000

New Safety Door with Plywood, Laminate, Hinges,


Handle, Lock, and MS Grill with Powder Coating 3 7 21 2000 42000
Passage Pipe Fitting Labour and sockets 1 4 4 1000 4000

Providing and Fixing Curtain Channels with Runners 1 12 12 400 4800

Master Bedroom
New Wardrobe with 02 Drawers Each and Finished in
Both Side Laminate 0 9 0 1600 0
Bed with Storage Below finished in Laminate Both
Sides 0 5.5 0 1600 0

HeadBoard in Plywood and Finished in Laminate 0 4 0 750 0


Side Tables with 02 Drawers each finished in
Laminate on Both Sides-2pc 0 2 0 10000 0
AC Panelling 0 2.5 0 750 0
Dressing Mirror Panelling only 0 7 0 750 0

Providing and Fixing Curtain Channels with Runners 1 12 12 400 4800

Guest Bedroom
Bedroom Storage Door near Duct 3 7 21 750 15750
AC Panelling 0 2.5 0 750 0

Panelling Below Beam for Hiding Copper Pipes 0 10 0 750 0

Packing TV Unit area with plywood and gypsum 3 2 6 750 4500


Dressing Mirror Ply Cutting and refixing upto
wardrobe level 1.5 7 10.5 750 7875

Providing and Fixing Curtain Channels with Runners 1 12 12 400 4800

Kitchen
Kitchen Repairing and Channel Change 1 1 1 5000 5000

Bathroom
Bathroom Accessories Change-Material and Labour-
02 0 2 0 10000 0
Bathroom Basin Storage with Plywood and Laminate-
02 1 2 2 7500 15000
Mirror-02 1 2 2 1500 3000
Sr No Description Length Height Sq.Ft Rate Amount
B Civil Works
Master Bedroom
Breaking Window Marble Patti 0 4 0 30 0
Plaster 0 4 0 75 0
Granite Top Fixing With Dhar Polishing 0 1 0 350 0
Breaking Works Near Bathroom 1 100 100 30 3000
Plaster 1 100 100 95 9500
Tiles Fixing 1 100 100 125 12500

Guest Bedroom
Breaking Window Marble Patti 0 4 0 30 0
Plaster 0 4 0 75 0
Granite Top Fixing With Dhar Polishing 0 1 0 350 0

Bathroom Joint Filling and Cleaning 1 2 2 5000 10000

Kitchen
Counter Facia Patti Change 1 1 1 2000 2000
Skirting Change 1 1 1 2000 2000
Kitchen Joint Filling and Cleaning - Floor and Counter
Top 1 1 1 5000 5000

Marble Diamond Polish


Italian Marble Floor 1 950 950 60 57000
Granite Moulding Polish 1 325 325 35 11375
Granite Top Buffing 1 300 300 35 10500

C Plumbing Works Including Labour And Material


Common Bathroom
Removing and Refixing New WC with seat cover with
Rack Bolts, Hand Faucet 1 1 1 12000 12000
Removing and Refixing New Divertor Face Plate,
Head Shower, Hand Shower, and Spout 0 1 0 20000 0
Removing and Refixing New Wash Basin with Floor
Mounting Tap, Waste Coupling, Bottle Trap, Angle
Cock and Connectors 0 1 0 25000 0
Fixing Your Old Geyser with new connectors and
angle valves 1 1 1 5000 5000

Master Bathroom
Removing and Refixing New WC with seat cover with
Rack Bolts, Hand Faucet 1 1 1 12000 12000
Removing and Refixing New Divertor Face Plate,
Head Shower, Hand Shower, and Spout 0 1 0 20000 0
Removing and Refixing New Wash Basin with Floor
Mounting Tap, Waste Coupling, Bottle Trap, Angle
Cock and Connectors 0 1 0 25000 0
Fixing Your Old Geyser with new connectors and
angle valves 1 1 1 5000 5000
Sr No Description Length Height Sq.Ft Rate Amount

Kitchen
New Sink Cock and Bottle trap 0 1 0 7500 0
Washing Machine Angle Cock and Drain Pipe Fitting
and Aquaguard Connection 0 1 0 4500 0

D Painting Works

New Royale Paint on All Walls and Ceiling with Lambi


Palti, Preimer, and 03 Coats of Paint on all surfaces 1 2550 2550 50 127500
Melamine Matt Polish on All Existing Old Doors and
Furniture Work 1 225 225 85 19125
Melamine Matt Polish on All Existing Old Doors and
Furniture Work-Rft 1 450 450 50 22500
MS Window Grill Rust Removing and Painting with
Red Oxide and Epoxy Paint 0 1000 0 30 0
1Bedroom New Bed, Wardrobe, Dressing Mirror dhar
polish 0 1 0 4000 0
Cleaning and Covering Charges 1 1 1 10000 10000

E AC Copper Piping Works


Master Bedroom-1.0T 1 20 20 400 8000
Guest Bedroom-1.0T 1 20 20 400 8000
Living Room-1.5T 1 20 20 475 9500

F Aluminium Window Works

Living Room-New PVC Wool File, Locks, Bearing,


Mosquito Net and Complete Mainteneance 1 1 1 5500 5500

Guest Bedroom-New PVC Wool File, Locks, Bearing,


Mosquito Net and Complete Mainteneance 1 1 1 5500 5500

Master Bedroom-New PVC Wool File, Locks, Bearing,


Mosquito Net and Complete Mainteneance 1 1 1 5500 5500
Kitchen-New PVC Wool File, Locks, Bearing,
Mosquito Net and Complete Mainteneance 1 1 1 5500 5500
Comon Bathroom-Mainteaneance 1 1 1 1500 1500
Master Bathroom-Mainteaneance 1 1 1 1500 1500

G Electric Works

Labour Works-Complete area Switch Board Fixing


with Metal Conceal Board, Fixing LED Tube Lights,
Fans, Hanging Lights, Mirror Lights, Bathroom Lights,
Exhaust Fans, New Bell Switch and New Bell, AC
Circuit Wiring Checking Only, Internet Wiring,
removing Old Light Fittings from All Areas. 1 1 1 55000 55000
Sr No Description Length Height Sq.Ft Rate Amount
Materials- LED Tube Light-14, Bathroom Light-02,
Exhaust Fan-03 1 1 1 19000 19000

H POP Works
Complete area repairing and false ceiling light gala
filling and wall punning where ever required and AC
Panelling with Gypsum 1 1 1 35000 35000
0
I Throwing Away Debris 1 2 2 5000 10000

Total Amount For Work 695025


Add: Fees @12% 86878.125
Total Amount 781903.125

Note Any Extra Work Will Be Carried Out At An Extra Charges