0% found this document useful (0 votes)
114 views3 pages

Pre- commissioning Checklist

Uploaded by

Jayam Murugan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
114 views3 pages

Pre- commissioning Checklist

Uploaded by

Jayam Murugan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Page 1/ 3

High Voltage Switchgear Type 8D. . 72,5 kV and above


Checklist before start of Commissioning Activities
Document : GIS-I&C/F-29Rev:0/1.11.2023.

Customer: Contract No.:

Consultant: Serial No.: From E01-31288850


Substation: To E05-31288854
Switchgear type: 8DN8-5 Rated voltage: 110 kV
Checklist

Sl. No. Check Point Yes No Remarks

1 Completion of installation- arrangement and


position of individual modules as per drawing?

2 Name plates found as per SLD & Phase sequence


marking or stamping found as per drawing?

3 Gas compartment identification and verification of


gas permeable and gastight bushing found as per
drawing?

4 Gas filling up to rated operating pressure


completed?

5 LCC panel installation as per drawing completed


with welding/bolted as per design?

6 Grounding connections of GIS completed as per


drawing?

7 Grounding connection of LCC panels completed


as per drawing?

8 Completion of cable laying as per cable schedule,


maintaining aesthetical looks with proper
trays/support?

9 Drive cable socket (harting make) continuity


checked and connected with lock clip?

10 Cable identification tag provided?

GIS I&C 2021


Page 2/ 3

High Voltage Switchgear Type 8D. . 72,5 kV and above


Checklist before start of Commissioning Activities
Document : GIS-I&C/F-29Rev:0/1.11.2023.

Sl. No. Check Point Yes No Remarks

11 Use of proper glands and termination lugs of


various cables used?

12 Control cable termination firmness checked?

13 CT/VT cable termination firmness checked?

14 Checking of VT shock indicator?

15 Checking of drive manual operations and


Close/open indication position with proper tools?

16 DC power supply voltage checked, verified as per


secondary design?

17 AC power supply voltage checked, verified as per


secondary design?

18 Spare hole or gaps sealing of control panel


completed?

19 Checked for general cleanliness and for physical


damages to any component?

REMARKS:

GIS I&C 2021


Page 3/ 3

High Voltage Switchgear Type 8D. . 72,5 kV and above


Checklist before start of Commissioning Activities
Document : GIS-I&C/F-29Rev:0/1.11.2023.

Responsible Commissioning Engineer

Name: Abishek V Department

Signature:

Confirmed / noticed by (client/consultant):


Verified by
Name: Name: Name:

Date*): Date*): Date*):

GIS I&C 2021