After Service Check List Final
After Service Check List Final
2
How to use this Book
• After Repair of customer product, check all the • Explain what all the check you have done and your
points which is given in the checklist. observations to customer with this book
• If you found any issues rectify the same as per
service policies
TV After Repair Check List
1) Check proper AC Voltage & 2) Proper internal connection 3) TV Model & Serial Number
Ground connection fitment (Wi-Fi / BT FFC) entry in svc menu
11) Check all picture settings 12) Check all sound setting 13) Check Network/Internet
work, Picture Clarity work, speaker level functioning
Voltage/Earth & Light Leveling & Leg balancing Comp. Base Noise Thermostat Settings
1 2 3
Cleaning &
Flushing
Proper System Cleaning & Flushing Mandatory Drier replacement according to Compressor replacement as per customer model
to remove contaminants unit refrigerant used (COMP & PCB matching in case of Inverter/Linear Comp)
4 5 6
Joints/Leak Points properly brazed and checked System vacuum done using Vacuum Gas Charging done by weight as per
Pump and vacuum hold checked unit specification
7 8 9
Check for doubts Explain Cleaning Process Explain Cleaning Process Explain Cleaning Process
In functions Lint/Magic Filter Detergent Dispenser Port Filter Cleaning
MWO After Repair Check List
Check Voltage 210 ~ 250 Check Earth <3V Check Power Socket & Plug Glass Tray Fitment
Check Grill Cleaning Check Canopy / Mica MGT/HVT Wiring No loose Harness (Not Loose)
Connection
Fan Noise HVD & HVC Leakage Check all keys in Keypad Utensil usage info
AC After Repair Check List
1. Flair Nut Leak 2. Service Valve Leak 3. Water Leak 4. I / D Rear Side Closing
5. Testing at Test Run Mode 6. Rated Frequency 7. Voltage & Comp. Current 8. Grill Temperature
& Back Pressure
9. PCB Connecter 10. Display Check 11. Noise & Vibration Check- (Tube Touching , Fan Motor )
Gas leak : Check 1,2,6,7. Low cooling : Check 1,2,5,6,7,8,9 Water Leak : Check 3. Noise : Check 10. Not Working : Check 4,5,8,9
Inverter AC GAS Charging After Repair Check List
If Improper Voltage use Stabilizer Voltage 220~230 V and ensure the Earthing Feeding N 2 Pressure 150~250 psi for
leakage testing
Leakage Testing with Soap solution on N2 Pressure Release & Vacuum Preparation Vacuum time 30 Minutes
IDU/ODU Flare nuts
Ambient Temp.
Cut hose pipe Check Pre Filter Housing Check the SS Tank for Check PCB Harness (Not
if uneven shape Leaks any dirts Loose)
Check Booster Pump Check Compressor Check OLP Resistance Check PTC Resistance
Connections (If Loose) Resistance (1.8Ω ±15%) (33Ω ±20%)
(Hot / Cold models) (Hot / Cold models) (Hot / Cold models)
After Repair Process
Explain After Repair Checklist Input CIC No (1800 180 9999) Clean Call
To give confidence to customer that engineer Customer can contact directly our call centre for To ensure Customer is completely happy after
had checked all aspect of the product which is any future service requirement, so that we can repair & product is working to his satisfaction
recommended by LG. provide fast service
What Engineer has to Do?
What Engineer has to Do? What Engineer has to Do?
• Next day before handing over the job sheet for
• Check all the points as per check list • Show the CIC no available in product closing the complaint call customer
• Rectify the problem if found • Input CIC no in Cust. mobile and save • Check is the customer completely satisfied
• Open this book and explain to customer what • Inform customer that this is toll free no. with our service
and all you checked in customers product and • Inform customer advantage of call • Refer the clean call process on how to talk to
status of the same. registration in CIC no. customer
When to Do?
• Next day of repair before closing the call
When to Do? When to Do?
• Immediately after repair at customer place • Immediately after repair at customer place
Regd. Office: LG Electronics India Pvt. Ltd. A24/6 Mohan Cooperative Industrial Estate , Mathura Road,
New Delhi - 110004