0% found this document useful (0 votes)
136 views

JSA - Installation and Removal of Polycarbonate Sheet Mesh Guard (1)

Uploaded by

Arul B. E
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
136 views

JSA - Installation and Removal of Polycarbonate Sheet Mesh Guard (1)

Uploaded by

Arul B. E
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

Job Safety Analysis (JSA) – Installation and Removal of Polycarbonate Sheet & Mesh Guard

Sl. Detailed Sequence of steps Potential Hazard in Control Measures were taken in each step (task)
No. (tasks) for carrying out the work each step (task)

1 Access and Egress of the Roof 1. Fall of person 1a. Work at height authorized person only allowed
using, to carry out installation and removal of
polycarbonate sheet and mesh guard activity on
a) Tower ladder, Mobile roof.
type scaffolding with
stepped ladder 1b. Work at height permit to be obtained before
arrangement, Boom lift start of work.
at appropriate locations
1c. Only competent person approved safety belt
b) Fixed cage ladder will be will be used.
used in applicable areas
1d. Ensure 3-point contact while climbing on
ladder

1e. Safety belt to be anchored in the cage of boom


lift / tower ladder

1f. North light glass will be removed in required


bays and workers will access the gutter using
tower ladder / boom lift / mobile scaffold.

1g. Safety belt will be anchored on the purlin /


lattices during access from tower ladder / boom
lift / mobile scaffold.

1h. Safety belt will be anchored in the ladder


during access from fixed ladder and once reaching
the roof, safety belt will be anchored in the
lattices/truss.

1i. Use PPE such as Safety helmet, Safety shoe,


Gloves & Safety belt.

1j. Monitoring by dedicated security person


2. Fall of ladder /
material 2a. Ensure the stability of the tower ladder before
using and engage wheel lock

2c. No material should be carried in hand while


accessing the ladder

2d. Location to be barricaded to avoid


unauthorized entry around the access
equipment’s and one person will be available in
ground level to restrict other employees
2 Fixing of safety net below the 1.Fall of Men 1a. Obtain height work permit before start of work
polycarbonate sheet
1b. Competent person inspection report will be
verified for safety belt before start of the activity

1c. Movable type aluminum stepped ladder or


Tower Ladder or Boom lift is used to fix the safety
net in structure as per site condition

1d. 3 Point contact to be followed while using the


ladder

1e. No material should be carried in hand while


accessing the ladder

1f. Safety belt to be tied with roof structure or in


Boom lift or in scissor lift as per site condition

1g. Location to be barricaded to avoid


unauthorized entry around the access
equipment’s and one person will be available in
ground level to restrict other employees

1h. Use PPE such as Safety helmet, Safety shoe,


Gloves & Safety belt

2a. Stability of the ladder / mobile scaffold to be


2.Fall of Ladder / maintained before accessing it. Wheel lock to be
Material engaged

2b. Safety net will be shifted manually to the


structure by using PP rope or using boom lift /
tower ladder

2c. Good housekeeping to be maintained in the


work area

2d. No underneath working to be allowed

2e. Continuous supervision to be ensured

3. Exposure to moving 3a. Crane movement to be stopped and LOTO to


crane be applied if working in crane movement zone
3 Installation of temporary lifeline 1. Fall of men For North Light Bays:

1a. Temporary lifeline will be fixed using


polyamide rope and both the end of polyamide
rope will be tied with boom truss by accessing
through the gutter. Worker will anchor his safety
belt / retractable fall arrestor in the truss / lattices
and after installation anchored in the temporary
lifeline

For A Type Roofs:

1b. Installation of L-angle or Clamp at the corner


edge of roof sheet & tying the temporary lifeline
using boom lift. Safety belt will be anchored in the
boom lift cage.

1c. Work at height authorized person only allowed


to carry out the activity on roof

1d. Work at height permit to be obtained before


start of work

1e. Only competent person approved safety belt


will be used

1f. Walking over the translucent sheet is restricted

1g. Safety net available below the translucent


sheet

1h. Monitoring by dedicated security person

1i. Use PPE such as Safety helmet, Safety shoe,


Gloves & Safety belt
2. Heat stroke
2a. Providing water to workers at top of the roof
preventing from dehydration and heat stroke

2b. Roof work to be avoided between 12.00 Hrs.


to 14.00 Hrs. during summer period (April & May)
3. Adverse weather
condition 3a. Work will be stopped during wind/ rain/ drizzle

4 Lifting and Lowering of materials 1. Fall of Men 1a. Safety belt / Retractable fall arrestor will be
from and to roof anchored in the temporary lifeline or in the
structural lattices.

1b. Work at height permit to be obtained before


start of work.

1c. Only competent person approved safety belt


will be used.

1d. Monitoring by dedicated security person.

1e. Use PPE such as Safety helmet, Safety shoe,


Gloves & Safety belt.

2. Fall of Materials 2a. Only one mesh frame or One polycarbonate


sheet is lifted at a time by using PP rope
connected with pulley or through manual lifting.

2b. Pulley will be fixed and removed in lattice /


truss by Movable type aluminum stepped ladder
or Tower Ladder or Boom lift as per site condition.

2c. Mesh guard / polycarbonate sheet will be


shifted to roof by removing the north light glass
and taken inside. Same method is followed for
lowering the existing mesh guard and
polycarbonate sheet.

2d. Work area will be barricaded and access


restricted

2e. Other portable equipment’s Drilling machine,


fastening tools and water can’s will be shifted to
roof / lowered from roof using PP rope.

3. Heat stroke 3a. Roof work to be avoided


between 12.00 Hrs. to 14.00 Hrs.
during summer period (April & May)

3b. Drinking water to be made


available in the work area

4. Adverse weather 4a. Work will be stopped during wind/ rain/ drizzle
condition
5 Installation / Removal of mesh 1. Fall of person from 1a. By anchoring in lifeline, as per site condition,
guard and polycarbonate sheet roof. safety belt or retractable fall arrestor is used to
access the mid of the bay to install / remove the
mesh guard and polycarbonate sheet

1b. Walking / standing over the translucent sheet


is restricted

1c. Safety net available below the translucent


sheet

1d. Work at height authorized person only allowed


to carry out the activity on roof.

1e. Work at height permit to be obtained before


start of work.

1f. Only competent person approved safety belt


will be used.

1g. Monitoring by dedicated security person.

1f. Safety belt will be anchored in the temporary


lifeline while fixing the mesh frame.

1g. Use PPE such as Safety helmet, Safety shoe,


Gloves & Safety belt.
2. Material may fall
from height. 2a. Work area will be barricaded and access
restricted

3.Electric shock 3a. Safe power cable management will be


followed (No cuts in wire, No insulation joints)

3b. Portable electrical hand tools are double


insulated type and will be used after getting safety
stickering from AL maintenance team

4. Heat stroke 4a. Roof work to be avoided


between 12.00 Hrs. to 14.00 Hrs.
during summer period (April & May)

4b. Drinking water to be made


available in the work area

5. Adverse weather 5a. Work will be stopped during wind/ rain/ drizzle
condition
Undertaking by Contract Supervisor:
I have understood all the above-given precautions and undertake to adhere to all of these without fail
before, during, and on completion of the stated work. All concerned persons have been explained about
the above precautions. I will be present at the job site till the work is completed.

Signature of Contractor Site in charge:

Verification and Recommendations by Ashok Leyland Site in charge (if any):

Approval of Ashok Leyland Site in charge:

Comments/Recommendation of Ashok Leyland Safety in charge (if any):