JSA - Installation and Removal of Polycarbonate Sheet Mesh Guard (1)
JSA - Installation and Removal of Polycarbonate Sheet Mesh Guard (1)
Sl. Detailed Sequence of steps Potential Hazard in Control Measures were taken in each step (task)
No. (tasks) for carrying out the work each step (task)
1 Access and Egress of the Roof 1. Fall of person 1a. Work at height authorized person only allowed
using, to carry out installation and removal of
polycarbonate sheet and mesh guard activity on
a) Tower ladder, Mobile roof.
type scaffolding with
stepped ladder 1b. Work at height permit to be obtained before
arrangement, Boom lift start of work.
at appropriate locations
1c. Only competent person approved safety belt
b) Fixed cage ladder will be will be used.
used in applicable areas
1d. Ensure 3-point contact while climbing on
ladder
4 Lifting and Lowering of materials 1. Fall of Men 1a. Safety belt / Retractable fall arrestor will be
from and to roof anchored in the temporary lifeline or in the
structural lattices.
4. Adverse weather 4a. Work will be stopped during wind/ rain/ drizzle
condition
5 Installation / Removal of mesh 1. Fall of person from 1a. By anchoring in lifeline, as per site condition,
guard and polycarbonate sheet roof. safety belt or retractable fall arrestor is used to
access the mid of the bay to install / remove the
mesh guard and polycarbonate sheet
5. Adverse weather 5a. Work will be stopped during wind/ rain/ drizzle
condition
Undertaking by Contract Supervisor:
I have understood all the above-given precautions and undertake to adhere to all of these without fail
before, during, and on completion of the stated work. All concerned persons have been explained about
the above precautions. I will be present at the job site till the work is completed.