Rate Analysis - Road, Causeway, Drain
Rate Analysis - Road, Causeway, Drain
550.00 -
-
8,239,500
8,240
Length
1,000.00 WMM ROAD
(m)
Width
3.50
(m)
L B H
SR. NO. DESCRIPTION UOM Quantity
(m) (m) (m)
1 Excavation cum 1,000.00 4.50 0.300 1,350.00
Layer - 1 (Boulder -
2 cum 1,000.00 3.50 0.150 630.00
Murramm)
3 Layer - 2 (GSB) cum 1,000.00 3.50 0.200 770.00
4 Layer - 3 (WMM) cum 1,000.00 3.50 0.150 577.50
Layer - 3.5 (Quary
5 cum 115.50
Dust)
6 Murram Shoulder cum 1,000.00 0.50 0.35 175.00
TOTAL
Per Rm Rate
Rate Amount
450.00 607,500
990.00 623,700
1,890.00 1,455,300
2,070.00 1,195,425
1,440.00 166,320
990.00 173,250
4,221,495
4,230
TW m 1.50 0.55
BW m 0.50
H m 0.90
SR. NO. ITEM DESCRIPTION UOM QTY RATE AMOUNT
STORM WATER
RMTR. 1,000.00 3,041 3,041,164
DRAIN
1 Excavation Cum 1,150.00 550.00 632,500 633
3,345.28 -86,844,000