It is a Multi-block building having various blocks and having Class II construction. Section wise occupancy and
construction is as under:
Plant is engaged in the manufacturing of …………... Details process flow chart of FG is as under:
TRANSFORMER
Sr. No. KVA Make Oil Capacity (Litres) Oil Pit Available
1
2
Is there Baffle wall provided between the transformers
Is the transformers are 6 Meter away from the rest of the property
DG SETS
Sr. No. KVA Qty. Make Year of Installation
1
2
3
Dedicated underground Diesel Tank Capacity in KL
Flame proof light is installed in diesel storage yard
Cooling Tower
Sr. No. Capacity Qty. Make & Model Serial No.
1
2
Air Compressor
Sr. No. Capacity Qty. Make & Model Serial No.
1
2
Chiller Plant
Sr. No. Capacity Qty. Make & Model Serial No.
1
2
Boiler
Sr. No. Capacity Qty. Make & Model Year of Installation
1
2
Turbine
Sr. No. Capacity Qty. Make & Model Year of Installation
1
2
ETP/STP Plant
Sr. No. Capacity Qty. Make & Model Year of Installation
1
2
FIRE DETECTION AND PREVENTION SYSTEMS
Name Availability
(Yes / No) Place / position of the system
Smoke Detector
Gas Detector
Fire Alarm
Sand Bucket
CCTV
CO2 flooding & gas
suppression system
Sprinkler
SAFETY PRACTICES
Parameter Description Remarks
Periodicity of meeting.
Are remedial measures to be recorded & implemented?
Are follow up measures taken?
Safety Inspections Are safety inspections carried out by safety organization
members periodically?
Is a Checklist available?
Are deficiencies in safety systems are brought to the notice
of the departmental head and implemented?
Is external Safety audit carried out?
Safety awards Received from international safety agencies (past 2 years)?
Safety Studies Any specialized safety studies (e.g. HAZOP, QRA, other PHA
studies, PSM, JSA / HIRA, etc.) are carried out in the facility?
(If yes, list down the studies done below)
Status of Implementation of such study recommendations
ISO Certifications
Housekeeping Is there accumulation of unwanted combustibles
Is disposal of combustible waste carried out from the shop
floor at periodic intervals
Is 5 S system of housekeeping followed?
Parameter Description Remarks
Accident record & Is there a system for recording the accidents and conduct
Investigation subsequent investigations & analysis
Implementing Is there a system in place to monitor and implement
recommendations various recommendations arising out of Safety Audits /
Inspections / Investigations / other safety studies, etc?
Safety Training Is there an annual training calendar for safety?
Number of safety training man days per employee
Are Training programs by external agencies organized on
Fire fighting, First aid, use of Personal protection?
Work Permit Implementation of Hot work / Work at height / Electrical
system isolation / Vessel Entry etc.
Number of hot work permits issued per week?
Material Safety Are there Material safety data sheets for all hazardous
Data Sheets chemicals and copies available with the user departments
Acceptance Tests Is there a system of carrying out Factory Acceptance Test
and Machinery Acceptance Test for new equipments during
major expansions (e.g. involving >10% capital expenditure)?
Behaviour Based Is there a BBS program implemented in the facility?
Safety (BBS)
BBS observations completed, feedback given to employees
and BBS checklist filled as per weekly / monthly plan?
“At-Risk” behaviors recorded and analyzed monthly?
Corrective actions by barrier removal team implemented?
Management of Is there a formal MoC procedure in place to ensure that
Change (MoC) changes(e.g. process, technology, equipment, procedures, key personnel or any
change to facilities) are properly reviewed and approved by
persons with the required expertise prior to
implementation? (to eliminate workplace hazards that could lead to
injuries, equipment damage, production losses, reputational impact or
environmental impact)
Are the electrical equipment maintained under AMC? If yes, list down below the
equipment’s covered under AMC along with the periodicity of AMC visits:
d. If the business is seasonal, state what percentage of production is completed during the
seasonal period
Production Bottlenecks:
a. Is there a single production line?
b. Is there any critical single machine?
c. What is the replacement time?
Interdependencies
a. Are any raw, intermediate or finished materials supplied to or from another location
within the company?
c. Are materials sent to sources outside the company for further processing (i.e. painting,
plating, etc.)? Are there other sources available?
a. Is there any equipment or tools with an unusual replacement time [i.e. custom-made,
one-of-a-kind, difficult to replace, large electric motors (>500 hp), large transformers, etc.]?
a. Any critical processes requiring pollution abatement equipment to operate (i.e. dust
collectors, electrostatic precipitators, scrubbers, regenerative thermal oxidizers, etc.)?
b. What is the expected lead time for restarting the operations / manufacturing process?
a. State if they are highly susceptible to damage from smoke, heat, water dropping, etc.
MACHINERY BREAKDOWN: