0% found this document useful (0 votes)
9 views

Pest Control Requirement

pest control

Uploaded by

veeraveldrnnce
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

Pest Control Requirement

pest control

Uploaded by

veeraveldrnnce
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

VIDYAGYAN-CHENNAI

PEST CONTROL DETAILS

AREA'S OR LOCATIONS WHERE SERVICE REQUIRED


S.No Services Area Covered Frequency Chemicals to be used
Cockroach/Crawling Kitchen, Mess, and Garbage area Weekly Fipronil, Truly Dust, Gel bait.
1 insects Prevention All common places like Monthly Fipronil, Truly Dust, Gel bait, B&G application
(Ants, silver fish) Manholes, Drains and other outside areas Monthly B&G application
Outside of the building but inside of the outer wall, Fortnightly Bromadiolone boards.Glue Boards
All possible Entry points. Fortnightly Steel Wools and Steel Nets
2 Rodent control/Proofing All Inside areas Fortnightly Glue or Paste Boards
Surrounding Buildings Fortnightly Glue or Paste Boards
All outside areas Fortnightly Glue or Paste Boards

SERVICE FREQUENCY
Mode of
S.No Services Pests Frequency Chemical to be used
Treatment

German Cockroach, American Cockroach, Brown Truly Dust, Bait Truly Dust, Bait &GeI
1 Cockroaches service Weekly
Banded Cockroach Ants and Spider &Gel application application

Residual spraying /
2 Fly prevention Flies Daily Imidachloprid 30.5 % sc
larvicide treatment

Residual spraying /
3 Mosquito prevention Mosquito surface coating on Daily Imidachloprid 30.5 % sc
flies resting area

Bromodiolone & 0.005%


Rodent- Bandicoot, Roof rat, Norway rat External - Baiting Weekly
Rodenticide
4 Rodent control

Mice- House mouse Internal - Trapping Weekly Glue Trans

* Note Requsted from the period of December-2024 to April-2025

You might also like