Progress Report
Presented to
APEGM
<<Name>>, EIT
Member# <<APEGM#>
1. Personal Information......................................................................................................................................................... 1
1. Personal Information......................................................................................................................................................... 1
2. Work Experience .............................................................................................................................................................. 2
2.1 Description of work experience ................................................................................................................................. 2
2.1.1 Responsibilities: ................................................................................................................................................ 2
2.1.2 Tools.................................................................................................................................................................. 3
2.1.3 Projects.............................................................................................................................................................. 3
2.1.3.1 Cable Rehabilitation Projects: ................................................................................................................... 3
2.1.3.1.1 <<Project#>>– Provincial Cable Rehabilitation Project. (Completed)……………………………..3
2.1.3.1.2 <<Project#>>– Winnipeg Cable Rehabilitation Project. (Completed)…………………….. ............ 3
2.1.3.1.3 <<Project#>>– Winnipeg Cable Rehabilitation Project.(In Progress)…………………................... 4
2.1.3.1.4 <<Project#>> – Provincial Cable Rehabilitation Project.(In Progress)…………………. ................ 4
2.1.3.1.5 Application of Theory:...................................................................................................................... 4
2.1.3.1.6 Visit to existing engineering works:.................................................................................................. 5
2.1.3.2 IT Projects:................................................................................................................................................ 6
2.1.3.2.1.1 Application of Theory:................................................................................................................... 6
2.1.3.2.2 Application of equipment as a part of the larger system: .................................................................. 6
2.1.3.3 Cellular Projects:....................................................................................................................................... 7
2.1.3.3.1 <<Project#>>– Wireless Project1. .................................................................................................... 7
2.1.3.3.2 <<Project#>>– Wireless Project2. .................................................................................................... 7
2.1.3.3.3 Visit to existing engineering works:.................................................................................................. 7
2.2 Communication Skills ............................................................................................................................................... 7
2.2.1 Oral representation ............................................................................................................................................ 7
2.2.2 Written documents ............................................................................................................................................ 7
2.2.3 Interaction with others....................................................................................................................................... 7
2.3 Professional and Ethical Responsibilities .................................................................................................................. 7
2.4 Social Implications of Engineering............................................................................................................................ 7
Progress Report – <<mm dd/yy>> to <<mm dd/yy>>
1. Personal Information
Email: <<[email protected]>>
Phone: (204) xxx-xxxx
Pre-registration period:
<<mm dd, yyyy>> to <<mm dd, yyyy>>
Immediate Supervisor:
<<Name>>, <<Designation>>
<<Title>>
<<Department>>
<<Address>>
Email: <<[email protected]>>
Phone: (204) xxx-xxxx
Email: <<[email protected]>>
Phone: (204) xxx-xxxx
2. Work Experience
2.1 Description of work experience
Period between May 26, 2008 and November 26, 2008:
During this period and till now, I am responsible for the detailed design, budgeting,
implementing, documenting and closing various projects in the information technology and
telephony fields.
2.1.1 Responsibilities:
• Accountable for managing projects executions in terms of budget
expenditures, scope management and quality management to ensure
stakeholders’ goals are met.
• Lead a team of cross-functional employees in a matrix organization to
develop engineering designs and specification, budgets, project plans, risk
assessments, implementation schedules and test plans for the end products.
• Coordinate meetings and conference calls to come up with a technical
solutions and designs.
• Ensure that the projects objectives, plans and budgets are in-line with the
company’s vision.
• Ensure that all stakeholders have been identified, reviewed and agreed to the
project plan.
• Coordinate meetings to brain-storm for any potential risks and conduct risk
analysis and assessment to define risk triggers, risk impacts, mitigation
plans and risk contingency plans.
• Drive the development of test plans and acceptance tests to ensure the
quality of the deliverables have been met.
• Develop the overall project budget and seek for the financial approval.
• Organize meetings and conference calls to discuss technical issues which
may arise during the project implementation and to develop an agreed up on
plan.
• Continuously evaluate and control the projects assigned to me to ensure the
implementation and expenditures are in-line with the project plan and
provide guidance to the project team when needed.
• Continuously monitor risks and implement the mitigation strategies if
needed.
• Prepare regular status reports and report status verbally or in writing to the
senior management if needed.
• Weekly report the status of the projects assigned to me to my supervisor in a
one to one meeting.
• Forecast schedule and budget changes of the project in the near future and
report it to the program manager and my supervisor.
• Escalation of issues that requires senior levels attention.
• Communicate and meet with functional managers to negotiate the resources
requirement and arrangements.
• Communicate with capital budget team if needed to discuss the financial
aspects of the project.
2.1.2 Tools
The company’s project managers use the following computer-based applications:
1- Microsoft Word and Excel for documentation and calculations.
2- Microsoft Project to develop the project schedule.
3- Microsoft Visio to develop process charts, diagrams and technical layouts.
4- SAP to manage the budget, resources and schedule.
5- Lotus notes for communicating the Budget and Engineering design.
2.1.3 Projects
2.1.3.1 Cable Rehabilitation Projects:
The main scope of a “Rehabilitation Project” is to replace or reclaim defective or
deteriorated telephone copper plant in Winnipeg and Manitoba. My role as a project
manager is to manage the planning, engineering design, implementation, expenditures of
these projects. The life span of these types of projects is normally two years.
The following four Cable Rehabilitation Projects (known as Rehab Projects) were re-
assigned to me in June 2008:
2.1.3.1.1 <<Project#>>– Provincial Cable Rehabilitation Project. (Completed)
The scope of the project includes the replacement high maintenance aerial cables and
buried cables in the Norwest and Eastern Regions. The aerial rehab work includes the
replacement of high maintenance non-bonderized aerial cables, terminals, service
affecting drop wires and the removal of aerial cables. The buried rehab work includes
the replacement of all non-filled connectors with filled, upgrading cable grounds to new
standard and the installation of filled terminal blocks.
My role in this project was to manage the implementation and expenditures as most all
the planning and design was managed by a previous project manager.
After we have agreed on the solution we commence the design. In the design phase, a
lot of activities are done by the team under my direct management and involvement:
1- Issuing a network specification.
2- Needed materials and resources.
3- Cost budgeting.
4- Scheduling.
Given the authority guidelines to spend and manage the project, I approve or request
modification to the cost and schedule of each solution (or network) to ensure it is
satisfying the overall project objectives.
During the implementation phase, my role -in addition to what is described in “Section
2.1.1”- is summarized in the following:
• Manage the dates and milestones.
• Manage the monthly expenditures of the project and update them regularly in
SAP.
• Manage the resources and priority of activities within my project.
• Address any technical issues identified by the construction managers and
conduct meetings or conference calls to find solutions or work around.
• Request changes to scope, schedule and budget if required to the project
success.
Once the solution is implemented, it is tested to assure it is in line with the quality
standards.
2.1.3.1.6 Visit to existing engineering works:
In a field visit to Windsor Park last September, I learned a lot about the different types
of technologies used to protect cables. I’ve watched how the technicians pull and
install cables.
2.1.3.2 IT Projects:
The following IT project was assigned to me in June 2008:
The scope of this project include upgrading the GComm server application to provide
more functionalities, adding new disk drives to increase server data retention, and
implementing land base updates from the City of Winnipeg and DMTI Spatial.
In this project, I have managed some contractors implementing the required software
upgrades, managed contracts, agreements and was involved in maintenance contract
negotiations with Intergraph Canada.
existing phone lines. I also understand that not only individuals benefit from our
engineering work but other corporations, competitors, government, law enforcement
agencies and tourists.