0% found this document useful (0 votes)
18 views1 page

DS Tri Lok Landing Cable

Uploaded by

Alejandro Baron
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

DS Tri Lok Landing Cable

Uploaded by

Alejandro Baron
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Data Sheet

Tri-Lok™ WH Title
Penetrator Landing Cable

Megger Testing during RIH Procedure


The Tri-Lok™ Wellhead Penetrator Landing Cable is designed
to allow high voltage testing of ESP power circuits after
the tubing hanger has been lowered into the wellhead, and
electrical connections are no longer directly accessible.

The landing cable is installed temporarily when the tubing


hanger is at rig floor level. Then when the tubing hanger is
lowered, megger testing can easily be performed. After testing
is completed, the landing cable may be pulled free to allow for
wet testing of tubing hanger seals. Protective adapters remain
in place on each of the three Tri-Lok™ penetrators to prevent
fluids from being forced into the penetrator tubes.

Allow cables to easily with-


Kevlar™ reinforced
stand pulling force without
cables damage.
Silicone insulated Extra flexible design means
conductors ease of use.
Alligator clips on
Easy connection to megger.
conductors
Heavy wall polyure- High strength jacket protects
thane jacket cable from abrasion Photo shows the Tri-Lok™ Landing Cable on its
Easy to store cable and protect storage reel. Each of the three connectors is at-
Heavy duty steel reel tached to the main cable by strength members.
it from damage.
Connector adapters are shown. Note that the other
end of the cable (right side) has alligator clips on
Two-part System for Ease of Use each conductor for easy testing
The Tri-Lok™ Landing Cable is supplied with three connector
adapters, one
for each phase.
The adapters are
attached to each Specifications
penetration coming
through the wellhead Electrical 2.5 kV, 1 Amp
tubing hanger,
and they form a Temperature 14-132° F (-10-50 °C)
watertight seal to the
penetrator tubes. Pressure 2500 psi
The Landing Cable
Connectors then Pull-off Force 20 lbs. maximum
engage with the
Length 80 feet
three adapters.
Tri-Lok™ Landing Cable installation kit
Contact your BIW representative to find out about complimentary access to the BIW Learning Center.
500 Tesconi Circle
Santa Rosa, CA 95401 USA
Phone 1-707-523-2300
www.ittbiw.com FAX 1-707-523-3567 ©2017 ITT Inc.

You might also like