0% found this document useful (0 votes)
9 views

CPU scheduling

Uploaded by

n1510634356
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

CPU scheduling

Uploaded by

n1510634356
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

CPU scheduling is the process of managing how processes are allocated to the

CPU, determining the order in which processes will execute based on their arrival
and priority, while optimizing overall system performance.
CPU scheduling is two type

Preemptive CPU scheduling Non-Preemptive CPU scheduling


1. SRTF(Shortest remaining time first) 1. FCFS(First Come First Serve)
2. RR(Round Robin) 2. SJF(Shortest Job First)
3. LJF(Longest Job First)

First Come First Serve (FCFS) Scheduling Algorithm


Process Table (FCFS)
Process Arrival Time Burst Time Completion Waiting Time Turnaround
Time Time
P1 0 6 6 0 6
P2 2 8 14 4 12
P3 4 7 21 10 17
P4 6 3 24 15 18
P5 8 5 29 16 21

Calculations (FCFS)
Average Turnaround Time: (6 + 12 + 17 + 18 + 21) / 5 = 74 / 5 = 14.8

Average Waiting Time: (0 + 4 + 10 + 15 + 16) / 5 = 45 / 5 = 9.0

Gantt Chart (FCFS)


| P1 |------| P2 |--------| P3 |-------| P4 |---| P5 |
Shortest Job First (SJF) Scheduling Algorithm
Process Table (SJF)
Process Arrival Time Burst Time Completion Waiting Time Turnaround
Time Time
P1 0 6 6 0 6
P4 6 3 9 0 3
P5 8 5 14 1 6
P3 4 7 21 10 17
P2 2 8 29 19 27

Calculations (SJF)
Average Turnaround Time: (6 + 3 + 6 + 17 + 27) / 5 = 59 / 5 = 11.8

Average Waiting Time: (0 + 0 + 1 + 10 + 19) / 5 = 30 / 5 = 6.0

Gantt Chart (SJF)


| P1 |------| P4 |---| P5 |-----| P3 |-------| P2 |

Longest Job First (LJF) Scheduling Algorithm


Process Table
Process Arrival Time Burst Time Completion Waiting Time Turnaround
Time Time
P2 2 8 10 0 8
P3 4 7 17 6 13
P1 0 6 23 17 23
P5 8 5 28 15 20
P4 6 3 31 22 25

Calculations
Average Turnaround Time: (8 + 13 + 23 + 20 + 25) / 5 = 89 / 5 = 17.8

Average Waiting Time: (0 + 6 + 17 + 15 + 22) / 5 = 60 / 5 = 12.0

Gantt Chart
| P2 |---| P3 |------| P1 |------| P5 |---| P4 |
Shortest Remaining Time First (SRTF) Scheduling Algorithm

Process Table (SRTF)


Process Arrival Time Burst Time Completion Waiting Time Turnaround
Time Time
P1 0 6 6 0 6
P2 2 8 15 5 13
P3 4 7 22 11 18
P4 6 3 9 0 3
P5 8 5 17 4 9

Calculations (SRTF)
Average Turnaround Time: (6 + 13 + 18 + 3 + 9) / 5 = 49 / 5 = 9.8

Average Waiting Time: (0 + 5 + 11 + 0 + 4) / 5 = 20 / 5 = 4.0

Gantt Chart (SRTF)


| P1 |--| P2 |----| P4 |--| P2 |----| P5 |---| P3 |

Round Robin (RR) Scheduling Algorithm

Process Table (RR) (Time Quantum = 4)


Process Arrival Time Burst Time Completion Waiting Time Turnaround
Time Time
P1 0 6 14 8 14
P2 2 8 20 10 18
P3 4 7 23 12 19
P4 6 3 9 0 3
P5 8 5 17 4 9

Calculations (RR)
Average Turnaround Time: (14 + 18 + 19 + 3 + 9) / 5 = 63 / 5 = 12.6

Average Waiting Time: (8 + 10 + 12 + 0 + 4) / 5 = 34 / 5 = 6.8

Gantt Chart (RR)


| P1 |---| P2 |---| P3 |---| P4 |-| P5 |---| P1 |---| P2 |---| P3 |

You might also like